Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7222 ASPHALT OVERLAY (5)//�'��Cltyof �Of Planning, Development & Transportation ts vCTIPS 625 KV6 Street Str P.O. Bnz 660 Fort Collm CO 60522.056e 070.M1.6615 970.221,6270- fax Change Order Form PROJECT TITLE: 2012 Street Maintenance Program, 2012 Overlay Contract PROJECT MJMBER: 902120 (Bid No. 7222) CONTRACTOR: Martin Marietta Materials (PO No. 9123107) CHANGE ORDER NUMBER: 0 A 1. Reason for charge. 2. Description of change. 3. Change In contract cost 4. Change In contract time. 1. See attached document 2012 Overlay Contract Pay Application 3. The contract cost Wif decrease by ($12,637.24) 4. There is no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACTCOST ACCEPTED BY: APPROVED -0.36% 11.22% $3,499,816.15 $405,186,95 $0.00 ($12,637.24) $3,892.365.80 DATE: IZ-- 2/-1Z DATE. >a —a ) " i ;)" APPROVED BY: DATE: Purchasing Agent Over $60,0D0 cc: CoNreclnr pwdmft Pmled me Clty of Fort Collins Contractors Monthly Pay Estimate 20120wrlay Contract BID NO. 7222 2012 OVERLAY CONTRACT TOTAL PAY APPLICATIONS Reconciling Change Order No. p Item Xtion 4, % U itComplete V. A 109.01 Fo= Account- Asphalt Cure= Cost Adjusaxicat I Esdmate $ 320,000.00 $ 320,000.00 117215.65 5 117,215.65 36.63% 20110 Grinding(planing) Surfisue Pi teention <3" 30,000 SY 3 135 S 70,500.00 123499.00 $ 290=21.65 411.66% 202.02 Chinding (planing) Surface Fixtuvatin. 3'< 5" 4,000 SY $ 2.78 $ 11,120.00 1698.00 $ 4,720.44 42.45% 202.30 Gri.diog (planing) Surface Preparation 5'< 7" 2.000 SY S 3.62 $ 7,240.00 0.00 $ 0.00% 20240 Ciding (planing) Surbioe Fmp=li on 7"< 9" 4,500 SY $ 4.67 $ 21,015.00 2753.00 $ 12.856.51 61.18% 202.50 Toper Planing Adj..t to G-,-- IX0 LF S 1.99 S 2,388.00 30342.67 $ 60,381.91 2528.56% 202.60 Submit Son Milling< 3" too Sy S 5.43 $ 543.00 2019.99 $ 10,968.55 2019.991/6 202.70 Bobw Style Milling - Additional Inch Thikm 20D Sy(n S 0.65 $ 130.00 136.38 $ 88.65 68.19% 203.10 EMV2600 - General Less This 100 CY 25 CY S 2390 S 597.50 0.00 S - 0.00% 20320 rcavadoa - G...d Ova 100 CY 125 CY S 20.40 $ 2,550.00 0.00 S - 0.00% 20330 Excavation -Muck 25 CY S 20.43 $ 510.75 230.67 4,712.59 922.68% 203.40 Borrow -Less Thu 100 Ton 50 TON S 21.32 $ 1,066.00 0.00 S - 0.00% 203.50 Borrow -Over 100 Ton 125 TON S 15.69 S 1,961.25 215.23 S 3,376.96 172.18% 203.70 Shouldering 6,000 LF S 0.75 S 4,500.00 9504.00 $ 7,128.00 158.40o/. 208.10 Itimic NVottts 400 LF $ 3.10 S 1,24-0.00 381.00 S 1,181.10 95.25% 209.30 Q=b Rubba Wattle 200 LF S 11.15 $ 4230.00 0.00 5 - 0.00% 20830 Straw Balm 5 EA S 4.62 $ 23.10 0.00 $ - 0.00% 208.40 SiltFmce 1W LF $ 1.85 S 185.00 0.00 $ - 0.00% 210.01 Pumes Mailbox I EA S 20827 S 208.27 0.00 S - 0.00% 210.02 Adjust Valve Box 200 EA 5 149.M S 29,810.00 242.00 S 36,070.10 121.00% 210.03 Adjust Valve Box with Ping 25 FA S 6620 $ 1,655.00 22.00 S 1,456.40 88.00% 210.04 Adjust Valve Box -Tyler 6860 Series. heas R 69, Screw Type Adjustable Rim 30 FA $ 81.75 $ 2,452.50 51.00 $ 4,169.25 170.00% 210.05 Adjust and Replace Top Section of Valve Box 50 EA $ 294.90 $ 14,740.00 45.00 S 13,266.00 90.00% 210.06 Tyler 6850 Sides, Item 58,14"Valn Box Extension (Part Oaly) I EA $ 63.15 S 63.15 0.00 S - 0.00% 210.07 Tyler 6860 Seim, 16" Valve Box To Sectioa Without Lid (Part Only) I RA S 63.45 $ 63.45 0.00 $ - 0.00% 210.08 Tyler 6960 genies, 26" Valve Box Top Section Without Lid (Fan Only) I EA $ 7720 S 77.20 0.00 $ - 0.00% 210.09 Total Valve Box Replammem Tyler 6860 Seties, 30" Bottom Section 2 SA S 443.00 $ 890.00 27.00 S 12,015.00 135000% 210.10 Adjust Standard Maaloote:Ct" 205 EA $ 350.00 S 71,750.00 144.00 $ 50,400.00 70.24% 210.11 Adjust Special Manhole >24' is BA 5 440.00 5 6,600.00 8.00 $ 3520.00 53.33% 210.12 Adjust Manhole with Ring 0 FA $ 180.00 5 - 16.00 $ 2,880.00 0.00% 210.13 Adjust Manholewith lAddog Ring S24"dia, < 311 height 30 EA $ 130.00 S 5,400.00 119.00 $ 21,420.00 396.67% 210.14 Adjust Manhole with Locling Rio&:VA" dia, > I- height 0 EA $ 190.00 S - 0.00 $ -T-0-00% 210.15 Adjust Manhole with Lociang Ring >24"dia, 5 3' height 5 RA S 210.00 S 1,050.00 9.00 $ 1,890.00 180.00% 210.16 Adjust Manhole with Loddog Ping >24- dia, > 3'bcigbt 0 EA S 210,00 S - 0.00 $ 0.00% Page 1 of 2 City of Fort Collins Contractors Monthly Pay Estimate Reconciling Change Order 20120verfay Contract BID NO. 7222 ;A 7. Unit ToW CbstTe Date C 306.01 Subgrade Preparation 12,500 SY $ 1.65 S 20,625.00 2753.00 S 4,542.45 22.02% 3D6.02 Asphalt Recycling 5-10' 12,500 SY S 13.35 $ 141,875.00 12986.00 147,391.10 103.99% 307.10 Class C Fly Ash Delivered & Spread 12" Depth, 10% by weight 0 TON $ 52.00 $ - 611.33 31,788.90 0.00% 30720 Stabilize Subgradc - Tilled. watered. & ronoPWIcd 0 SY $ 3.15 $ - 12665.00 39,894,75 0.00% 03.01 HMA Grading SX - ParUag Lot Overlay 0 TON S 66.73 $ - 0.00 S - 0.00% 403.02 IIMA Coaling SX - RatkaWl Coca, 0 TON $ 75.53 $ - 0.00 - 0.00% 403.03 HMA Goading V 1,000 TON S 56.29 $ 56,290.00 1323.40 74,494.19 132.34% 403.04 HMA Grading S, 64-29 Modified Binder 1000 TON $ 57.88 S 665,620.00 9369.36 542,298.56 81.47% 403.05 HMA - Grading S, 64-22 Binder 16,500 TON S 5226 S 862.290.00 2313531 $ 1-209,051.30 140.21% 40106 HMA Goading SO 5,000 TON S 48.02 S 240,100.00 3350.53 3 160,892.45 67.01% 403.07 IIMA Hand Patching. Ranov, & Replace 3,000 TON S 95m $ 285,000.00 1301.42 $ 123,634.90 43.38% 403.05 IIMA Hand Pawhing 210"Rennove & Replace 3,000 TON $ 100.00 $ 285,000.30 1520.27 $ 151,129.01 50.68% 403.09 RMA Pa=Pxcbig - Rennve & Replace 350 TON S 85.00 $ 29,750.00 2659.14 $ 226,026.90 759.75% 42R01 Gecte:uilz Paving Fabric 85,00 sy S IA5 5 123,250.00 107770.43 $ 156,267.13 126.79% 630.01 Cocutructio. Zone Traffic Cooml I % 6.23% $ 2D5,113.68 see below See below 63D.02 lAddidoond Variabie Message Board S Per day/ Per S 148each.50 S t,188.00 0.00 630.03 jAddidowd Flagging 50 boor S 23.10 S 1,155.00 0.00 0.00% ORIGNALCOtOl'RACT 777777 $ �9,9,81 IS 6' TAL- --TO ,QXK-PEJRF,4**D. ;527,35038 630.01 Construction Zone Traffic Control - ACTUAL COST TO DATE 203551.23 99.24% SEE SEPT: Utilities work performed - patched byM3 - charged to utilities- number used for traffic control percentage $ (4,316.00) (48.990.45) $ 584.00 SEE SEPT: Streets performed milling. IW sub contractor performed traffic central - number used for traffic control percentage COITOTAL 584.90 CO2TOTAL $876.00 5 876.00 CO3TOTAL $39,762.00,1 $ 38,762.00 Cot T."d.. $.60,795.68 S 60,795.68 COS Total 3,330.39 $ 3,836.39 Co 6 Total 250000.00 1 $ CO 7TotaJ S I . 50,338.88 CO 8 Toad $ $ 54,583.75 Adjusted Total Contract Amount TOTAL INCL CO $3,392,365.86 Change in Contract. -,t76,4774 Page 2 of 2