Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9126507CHANGE ORDER NO. 3 PROJECT TITLE: CSU STORMWATER CONTRACT CONTRACTOR: COLORADO STATE UNIVERSITY SPONSORED PROGRAMS VENDOR NUMBER: 124216 PROJECT NUMBER: BYH12312012 PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for Change: Additional Contractual Services 2. Description of Change: Sedimentation Study/ Water and Stormwater Quality 3. Change in Contract Cost: $ 87,888 4. Change in Contract Time: End of Contract extended to 12-31-2013 ORIGINAL CONTRACT COST $ 303,012 TOTAL APPROVED CHANGE ORDERS Change Order 2 $ 46,718 TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER Change Order 3 $ 87,888 ADJUSTED CONTRACT COST (Assuming all change orders aoaroved) J5� ACCEPTED BY: $ 437,618 DATE: DATE Z 2-0/ ZO 1Z Ytiject Manager REVIEWED BY: DATE: IZ 7� IZ T le. S rEwz n ull7a2 APPROVED BY: DATE: i T# W A-Te(Z .9 r i eLD U,J6;AJ & r� U G rl 2 APPROVED BY: DATE: 1 Z Zo RGA AAA �C.EGTo2 vTz �v2Gi{ltSialG cc: Purchasing Task 1: Monitoring performance of 700 Wood Street bioretention cell Background In Spring 2012, the City constructed a bioretention stormwater treatment cell at the Utility Service Center (USC) located at 700 Wood Street to better understand the performance of bioretention systems in Fort Collins. To date, most bioretention performance research has been completed in locations with very different hydrology than Fort Collins (e.g. Wisconsin, North Carolina, Pennsylvania and the Pacific Northwest) and the applicability of the results of.those research projects to semi -arid environments such as Colorado is unknown. Given the City's pending proposal to require LID -type stormwater facilities for future development, it is important to understand how these facilities will operate in Fort Collins climate. Objectives and Scope of Work The primary objective of this task is to quantify runoff and pollutant removal achieved by the bioretention cell for multiple precipitation events. To do so, CSU will monitor the quality and quantity of bioretention cell influent and effluent for the 2013 monitoring season (approximately April 1-September 30). Stormwater samples will be submitted to a local laboratory and analyzed for total suspended solids, nutrients (nitrogen/phosphorus) and metals (zinc, copper, lead). Based on historic precipitation data, we can expect to collect data for about 8 precipitation events during this period; however the actual number may be more or less depending on precipitation and bioretention cell performance. At the end of the 2013 monitoring season, a progress report will be submitted documenting the performance results. Budget The estimated costs for these services are provided in the table below. Task Labor (hours) Rate ($/hr) Other Costs ($) Subtotal Equipment Install 40 15 200 $800 Monitoring 96 15 32801 F $4720 Maintenance 50 15 250Z $875 Data Management, Analysis and Reporting 120 15 $1800 Subtotal $8195 F&A (485%) 1 $3934 Total_1 $12,129 Notes: (1) —Sample analysis costs at $205 per sample, 2 samples per event, 8 events (2) — Costs for AirGas rentals and various equipment needs Task 2: Monitoring of Street Runoff Quality Background The City is currently working on a "Green Streets Initiative' that, among other things, aims to reduce stormwater pollution generated from roadways. An important aspect in planning effective stormwater management strategies for "green streets" is understanding the types and levels of pollutants generated specifically from roadways. This information can help identify appropriate LID/BMP techniques to remove critical pollutants and provide estimates of the total amount of pollutants removed from stormwater runoff using such techniques. Objectives and Scope of Work The objective of this task is to monitor stormwater runoff quality generated from roadways in Fort Collins. The City has existing monitoring systems located at 262 E. Mountain Avenue that may be retrofitted to monitor stormwater runoff quality and quantity generated from Mountain Avenue and Walnut Avenue. Alternatively, these systems may be moved to a location on Remington Street where the Green Streets Pilot Project is being planned. Stormwater samples will be submitted to a local laboratory and analyzed for total suspended solids, nutrients (nitrogen/phosphorus) and metals (zinc, copper, lead). Based on historic precipitation data, we can expect to collect data for about 8 precipitation events during this period; however the actual number may be more or less depending on precipitation. At the end of the 2013 monitoring season, a progress report will be submitted documenting the performance results. Budget The estimated costs for these services are provided in the table below. Task Labor (hours) Rate ($/hr) r Costs ($) Subtotal Equipment Install 24 15 $560 Monitoring 96 15 P3280' $4720 Maintenance s0 15 $875 Data Management, Analysis and Reporting 120 15 $1800 Subtotal $7995 F&A (485vo) $3838 Total $11,833 Notes: (1) — Sample analysis costs at $205 per sample, 2 samples per event, 8 events (2) — Costs for AirGas rentals and various equipment needs Task 3: Evaluation of permeable pavement system maintenance requirements Background Permeable pavement systems (PPS) are susceptible to clogging over time and regular maintenance is recommended to maintain infiltration capacity of PPS. However, additional research is needed on several fronts regarding PPS maintenance. First, the required frequency of maintenance is still largely unknown. We believe that maintenance frequency will be dependent on the type of PPS and the runon/PPS surface area ratio, however we have not been able to test this to date. Second, the overall effectiveness of different PPS maintenance methods (sweeping/vacuuming, replacement of bedding material, etc.) has not been studied. A better understanding of these issues will allow the City to provide data -based recommendations/requirements for maintenance of PPS on public and private properties that should reduce costs while maintaining system effectiveness. In 2013, the City is expected to contract out maintenance of the PPS at Mitchell Block. The exact nature of maintenance is yet to be determined. In addition, the owner of the pervious concrete installation at 215 Linden St. (CTL) will begin sweeping/vacuum maintenance of the facility on a quarterly basis in 2013. Objectives and Scope of Work The objective of this task is to measure the effectiveness of PPS maintenance activities and the rate at which infiltration capacity of PPS is lost after maintenance. To accomplish this objective, CSU will perform infiltration tests at both sites throughout 2013. Approximately 5 tests will be conducted at each site. At CTL, six different rounds of testing will occur; one prior to and one after each of three maintenance intervals. At Mitchell Block, 4 different rounds of testing will occur; one prior to and one after maintenance that is schedule to be performed in spring 2013, followed by 2 more tests spaced out approximately every 60 days. The effectiveness of maintenance activities will be assessed by comparing pre- and post -maintenance infiltration rates and the rate of infiltration capacity loss will be evaluating by measured infiltration rates over time. Results of this task will be submitted to the City in a memorandum. Budget The estimated costs for these services are provided in the table below. Task Labor (hours) Rate ($/hr) Other Costs ($) Subtotal 215 Linden St. Testing 120 15 150 $1950 Mitchell Block (Mtn) Testing 80 15 100 $1300 Mitchell Block (Walnut) Testing 80 15 100 $1300 Data Management and Reporting 120 15 - $1800 Subtotal $6350 F&A (48%) $3048 Total $9,298 Notes: (1) — Estimated equipment costs. The same equipment will be used at all sites. Task 4: Low -Impact -Development (LID) and Traditional Development Cost Comparison in Fort Collins Background The City will soon require LID techniques to be implemented for new development and is interested in gaining a better understanding of the construction and long-term operation and maintenance (O&M) costs of using LID versus traditional stormwater management techniques. Studies comparing traditional and LID construction costs have shown LID development to be 15-80%cheaper to construct, with a few exceptions'. However, these studies did not include the long-term O&M cost estimates. The Foothills Mall redevelopment and Green Streets Pilot Project are two projects currently in the development phase that are planning for extensive use of LID techniques. These projects present an opportunity to investigate the life cycle costs of using traditional stormwater management strategies versus LID -type development in real -world applications. Objectives and Scope of Work The objective of this study is to develop stormwater-related life -cycle cost estimates for two redevelopment projects in the City of Fort Collins. For both projects, life -cycle costs estimates will be developed for two scenarios; one that utilizes extensive use of LID infrastructure and another that utilizes traditional stormwater infrastructure (e.g. curb -and -gutter, underground conveyance, centralized BMP treatment). CSU will use actual design and cost information to the extent that it is available (such as for the current Foothills Mall redevelopment), supplemented with design and cost information developed by CSU. The findings will be submitted in a report to the City. Budget The estimated costs for these services are provided in the table below. Task Labor (hours) Rate ($/hr) Other Costs ($) Subtotal LID Cost Comparison and Report 1 120 15 $6000 Subtotal $6000 F&A (48%) $2830 Total $8,830 ' See EPA report at: http://water.epa.gov/polwaste/green/costso7_index.cfm Colorado State University CSU ID: PASS 115614 L. Roesner, PI Change Order a3 Sponsor: City of Fort Collins Anticipated Start: 1/1/2013 Total PERSONNEL SALARIES L. Roesner, 0.25 month $ 3,732 Fringe: 24.9 % $ 929 C. Olson, 2.5 months $ 10,424 Fringe:24.9% $ 2,596 Student hourly, 900 hours $ 9,000 Fringe: 1 % $ 90 Graduate Research Assistant, 50%/4 months $ 6,600 Fringe:5.5% $ 363 TOTAL SALARY: $ 29,756 TOTAL FRINGE: $ 3,978 TOTAL PERSONNEL: $ 33,734 OTHER DIRECT COSTS In -State Tuition: 1 semester $ 5,186 Other. $ 7,760 Laboratory Analysis, $6560 AirGas Rental & Misc. Monitoring Supplies, $900 Infiltration Testing Equipment, $300 TOTAL OTHER DIRECT: $ 12,946 TOTAL DIRECT COSTS: $ 46,680 Facilities & Administrative: 48.7% $ 20,208 TOTAL: $ 66,888 trnivdnitg: Kriowkdge to Go Places Change Order No. 3 to Service Agreement This Change Order (Amendment) is entered into by and between the Board of Governors of the Colorado State University System, acting by and through Colorado State University, an institution of higher education of the State of Colorado, located at Fort Collins, Colorado, 80523-2002 ("University" or "CSU") and the Sponsor whose name and address appear below ("Sponsor"). WHEREAS, University and the City of Fort Collins (Sponsor) have mutually entered into an agreement dated July 16, 2008 (Agreement); and WHEREAS, the term of the agreement is nearing expiration and both parties have expressed a desire to extend said Agreement with certain modifications; and WHEREAS, Sponsor desires CSU to continue working under the modified agreement based on the Scope of Work shown in Exhibit A; NOW, THEREFORE, in consideration of the foregoing Recitals and the mutual promises herein contained, the parties agree.as follows: 1'. Scope of Work. The University agrees to perform additional research for the Sponsor described in the Statement of Work (Exhibit A: Daniel Baker and Brian Bledsoe) and Scope of Work (Exhibit B: Lany Roesner), attached hereto and incorporated by this reference. 2. Tenn. This Amendment shall terminate on December 31, 2013 unless sooner terminated as provided herein or extended by mutual written agreement of the Parties. 3. Payment. The Sponsor agrees to pay the University for research performed under this Change Order No. 3 in a fixed price amount of $87,888.00. This amount is for the Change Order only and does not change or modify the amount due on the original Agreement: Change Order #03 Payment Schedule for Daniel Baker: $21,000,00 Fifty percent (50%) ($10,500.00) upon acceptance of agreement; Forty percent (40%) ($ 8,400.00) mid -way through project: Ten percent (10%n) (.$ 2,100.00) upon submission of final report. Change Order #03 Payment Schedule for Larry Roesner: $66,888.00 Fifty percent (50%) ($33,444.00) upon acceptance of agreement; Forty percent (40%) ($26,755.20) mid -way through project: Ten percent (10%) ($ 6,688.80) upon submission of final report. Rerr,rn•6 Ayreenienr . InIge/ The total contractual amount for this work will be $437,618.00. The University reserves the right to reallocate funds between approved budget categories. Paymentwill be made in accordance with the schedule provided below 4. Except as expressly amended by this Amendment, all other terms and conditions of the Agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties have executed this Agreement the day and year shown. BOARD OF GOVERNORS OF THE City of Fort Collins: COLORADO STATE UNIVERSITY SYSTEM, ACTING BY AND THROUGH COLORADO STATE UNIVERSITY: By: ,� By: Pr n Name: David B. Doty Pri ted ame: James O'Neill Titl • irector of Purchasing & Risk Management Title: Associate Director, Sponsored Programs Date: 12 ( Z�1 1 -Z� Phone: 970-221-6779 Date:�- Research Agreement page 2 EXHIBIT A Proposal: Cache la Poudre River Post -Fire Sediment & Aquatic Insect Monitoring Oct 31, 2012 Statement of Work CACHE LA POUDRE RIVER POST -FIRE SEDIMENT & AQUATIC INSECT MONITORING Co -Principal Investigators: Daniel W. Baker, Department of Civil & Environmental Engineering, Colorado State University Brian P. Bledsoe, Department of Civil & Environmental Engineering, Colorado State University Proiect Background: The wildfires of 2012 burned over 66,000 acres (around 10%)of the Cache la Poudre River watershed. As a river historically confronted by combined pressures of decreased flows and adjacent development, the effects of the 2012 fires will only further alter channel conditions and possibly shift the river's overall health. As stewards of this ecological commodity, the City of Fort Collins, Colorado Parks & Wildlife (CPW), and Colorado State University (CSU) are collaborating to better understand these changes in an effort to both more clearly communicate with the diverse public and make more informed management decisions. Within the canyon, the Cache la Poudre is valued for its scenic beauty, fisheries, boating opportunities, and as a source of clean mountain water for municipal consumptive use. The lower -energy reach through Fort Collins is often used for fishing, tubing, swimming, and the aesthetic appreciation of countless others. These two sections of the Poudre are likely to be affected to different degrees and over distinct time scales by the post fire sediments. As such, this study will examine the amount and condition of both fine sediments and aquatic insect communities through a coordinated quarterly sampling program at nine sites along both sections of the river. Proiect Goals and Obiectives: Excessive sediment within rivers degrades the quality of aquatic habitat, diminishes watershed functions and services, reduces the flood conveyance capacity, and limits the aesthetic, social, and economic value of aquatic ecosystems. The adverse impacts of suspended and deposited sediment include reduced water quality, increased water treatment costs for municipal supply and industrial processes, diminished river and reservoir capacity, increased costs for maintenance of irrigation canals, and reduced habitat for fish and benthic macro invertebrates. Sediment is not only a critical pollutant, but is also a catalyst, carrier, and storage agent for other forms of pollution. Excessive deposition of fine sediment can impair aquatic life in a variety of ways. For example aquatic insects such as mayflies and stoneflies depend on clean interstitial spaces between gravels and cobbles in the river bed to carry out their life cycles (Waters 1995), and sediment infilling of critical habitat like pools and gravel spawning beds decreases the survival rate of fish and fish embryos(Chapman 1988, Suttle et al. 2004).These effects can also propagate out of the channel to the riparian ecosystem as birds and other animals depend on aquatic insects as a food source. Combined with the reduction in flushing flows vegetation encroachment on the new nutrient rich sediments may further exacerbate flooding potential. Flow regime is a master variable in controlling the effects of excessive sediment delivery on the river ecosystem. Moderate to high flows in the Cache la Poudre River support many amenities including clean water, fisheries, recreational opportunities and aesthetic benefits. Such flows can mitigate the excessive accumulation of fine sediments, and maintain habitats, channels, riparian Proposal: Cache la Poudre River Post -Fire Sediment & Aquatic Insect Monitoring Oct 31, 2012 corridors, and hyporheic/groundwater connections that moderate stream temperatures (Whiting 2002). Depletions of moderate to high flows have altered the capacity of the Cache la Poudre River to maintain physical habitat for fishes and aquatic insects by reducing the number of days on average that flows exceed the thresholds necessary to flush fine sediment and scour the river bed. The period of years between flushing events is now longer than what river biota are adapted to in terms of habitat availability and reproduction. Sediment influx from the High Park and Hewlett fires may increase the vulnerability of the river to flow depletions, and proposals for additional diversions will continue into the future. Accordingly, there is a pressing need to improve understanding of the linkages between sedimentation impacts and aquatic biota, as well as quantifying the flushing flows required to achieve biological objectives in the future. With these needs in mind, the project objectives are to: 1. Quantify surface and bulk accumulation of fine sediment along a gradient of sediment input, flow alteration, and geomorphic setting. 2. Link response of aquatic insects to fine sediment accumulation in the substrate through coordinated sampling. 3. Quantify the fine sediment removal and habitat improvement achieved by flushing flows of different magnitudes and durations of moderate to high flow. 4. Complement other post -fire studies including those investigating local salmonid populations, water quality, and high resolution remote sensing data of the burned areas. 5. Inform the public of the current and evolving conditions of the Cache la Poudre River ecosystem Project Scheduling Refer to the task schedule timeline below, for a preliminary schedule of tasks. Statement of Work We propose to start with a 2 year monitoring program (with this round of funding covering the IS` year). Inter -annual variability in the snowmelt hydrograph provides a natural experiment that allows us to examine the extent of benthic habitat recovery and sediment transport with varying magnitudes and durations of high flow. The proposed three monitoring phases would be timed with the snowmelt hydrograph: (1) during fall baseflow, (2) preceding the spring runoff, and (3) on the falling limb of the hydrograph peak. A potential 4th sampling event (as the budget allows) could be initiated if there is a spike and then reduction before peak. The proposed monitoring plan is extensive due to various challenges. First, anthropogenic flow extraction and floodplain alteration coupled with the natural geomorphic process shifts along the river corridor create a wide variety of channel types. Second, the ability to detect differences in fine sediment on the channel bed requires extensive monitoring efforts (Baker et al. 2011). Finally, there is a wide array of potential stakeholders in this project with differing desires and needs. Project tasks include: 1. Develop sampling protocol 2. Field data collection and analysis 3. Write-up of findings Page 2 Proposal: Cache la Poudre River Post -Fire Sediment & Aquatic Insect Monitoring Oct 31, 2012 Develop sampling protocol: • Colorado State University shall use the collective knowledge and experience of the contributing personnel to assemble a comprehensive field protocol • A copy of the protocol shall be submitted to project partners at the City of Fort Collins for approval Field data collection and analysis: • Field data collection will include: Topic Description Reach documentation l: field sketches 2: repeat photo points 3: sediment faces & deposits mapping Channel geometry 1: Twomonumented cross -sections per site 2: Longitudinal survey (limited to a total of 4 times the bank full with) Discharge 1: Using 1-D or 2-D velocimeter and velocity -area method 2: Cross-checked with nearest USGS or City of FC gages Bed material 1: Grid/point count of fines 2: Pebble count — 300 particles 3: Substrate embeddedness Aquatic insect community 1: Quantitative — Hess sampler P, 4 sites per reach • CSU field and oversight personnel will analyze data on an on -going basis to extract useful metrics from field data Write-up findings: • CSU oversight personnel will write-up findings in form of a report to project partners at the City of Fort Collins. • The report and summary data files will be submitted to the project partners at the City of Fort Collins. Task Schedule _ 2012 _ _ _J ,�-- -- - 2013 TASK. _,SepI'.Nov Dec' lan , �,Fe6 Mau (Apr. May, 19un t.:J July ', y ! Aug L_r- Sep =Oct t �tNov Dec�. c Develop sampling protocol Field data collection and analysis .. ■. . .. Page 3 Proposal: Cache la Poudre River Post -Fire Sediment & Aquatic Insect Monitoring Oct 31, 2012 References Baker, D. W., B. P. Bledsoe, C. M. Albano and N. L. Poff. 2011. Downstream effects of diversion dams on sediment and hydraulic conditions of Rocky Mountain streams. River Research and Applications 27:388-401. Chapman, D. W. 1988. Critical review of variables used to define effects of fines in redds of large salmonids. Transactions of the American Fisheries Society 117:1-21. Suttle, K. B., M. E. Power, J. M. Levine and C. McNeely. 2004. How fine sediment in riverbeds impairs growth and survival of juvenile salmonids. Ecological Applications 14:969-74. Waters, T. F. 1995. Sediment in streams - Sources, biological effects, and control. Monograph 7. American Fisheries Society. Whiting, P. J. 2002. Streamflow necessary for environmental maintenance. Annual Review of Earth and Planetary Sciences 30:181-206. Page 4 Colorado State University Dr. Daniel Baker Sponsor: City of Fort Collins Title: Cache la Poudre River Post -Fire Sediment & Aquatic Insect Monitoring Anticipated Start: January 1, 2013 Personnel D. Baker, PI,1.03 month Fringe: 24.9% Student Hourlies: Approximately 450 hours Fringe: 1% Total Salary Total Fringe Total Personnel $5,600 $1,394 $5,693 $57 $11,293 $1,451 $12,744 Travel: Mileage costs for students and PI to collect data at field sites along the Cache la Poudre ranging from up the Poudre Canyon (-35 miles away) down to near I-25. $776 Materials and Supplies: Costs include sampling jars, alcohol, metal staff plates, rebar, pin flags, and waders. $602 TOTAL DIRECT COSTS: $14,122 Facilities & Administrative: 48.7% on total direct costs $6,878 TOTAL: $21,000 CSU ID: PASS 115614 (L. Roesner, PI) Change Order #3" Colorado State University's Indirect Cost Agreement and Fringe Benefit Rates may be viewed here: http:Hweb.research.colostate.edu/OSP/rates.aspx *This SOW and budget for Change Order #3 takes the place of Pass #115442. Additionally, Dr. Baker's portion of this City of FC Change Order N3 is an extension of "Cache la Poudre River Post -Fire Sediment and Aquatic Insect Monitoring: CPW (Pass a115646)". MMIBIT B - Scope of Work — Stormwater Related Research Services Introduction City of Fort Collins Utilities (City) has requested research services from the Colorado State University (CSU) Urban Water Center to improve the understanding of stormwater management practices within the City. Four tasks have been identified for the 2013 year; 1) monitoring of the performance of a recently constructed bioretention cell, 2) monitoring of runoff generated from urban streets, 3) evaluation of the permeable pavement clogging and the effectiveness of maintenance and 4) life cycle cost comparison of new development using low impact development (LID) and traditional stormwater management techniques. A complete description of the objectives, scope and budget of each task are provided on the following pages.