Purchase Order Number. 9 1 2 6 4 7 l
Project Title: Cleanriew Channel Phase II (Upstream of Brtarwood)
Commencement Date: January 1, 2013
Completion Date: December 31, 2013
Maximum Fee: (time and reimbursable direct costs): $35,365.00
Project Description: See Attached
Scope of Services: See Attached
Service Provider agrees to perform the services
Identified above and on the attached forms in
accordance with the terns and cordftlons contained
herein and In the Services Agreement between the
parties. In the event of a conflict between or ambiguity
In the terms of the Services Agreement and this work
order (including the attached forth) the Services
Agreement shall control.
The attached forth consisting of three (3) pages is
hereby accepted and Incorporated herein by this
reference, and Notice to Proceed is hereby given.
Service Provider
Date: ! 2- 112 112--
I.-Ti
CC: Purchasing
.�,MM ( 7A i x l�jy
City of Fort Collins: ^
Submitted 8yfv)i•/�\
LLv-
Project anger
Data:
Reviewed By.
Sto wat rand Floodplaln ro ram Mngr.
IX/DDate: lg
Approved By:
Water Engineering and Field Se ' es
Department Manger
Date:
Approved By
Dir Purchasing & Risk Mgt
Date:
[_Cco
ENGINEERING, INC.
Planning
Design
Management
8100 5. nkron Street, Suite 500, Centennial, CO 8011d - Phone (503) 221-080C / Fax (303)-221-9019
October 29, 2012
Mr. Mark Kempton, PE, CFM
Stormwater Master Planning Manager
City of Fort Collins Utilities
P.O. Box 580, 700 Wood Street
Fort Collins, CO 80522-0580
RE: Clearview Channel Phase 2 - Final Design Proposal
Dear Mr. Kempton and Mr. Taylor,
ICON Engineering, Inc. is pleased to provide this proposal for the next phase of work on the
Clearview Channel. Tasks outlined below reflect the final design of the channel improvements,
building upon the recent alternatives analysis. Per direction at the last progress meeting, the final
design will reflect reconstructing the existing trapezoidal channel, with enhancements to the low
flow channel bottom. As noted by our past analyses, due to the changes in longitudinal slopes
(i.e. flattening) and minor geometry modifications, effort will be made to eliminate, or mitigate,
rises in the floodplain elevations. Our proposal is outlined below:
Task 1: Meetings (2 assumed) — Two (2) meetings have been included with this project. One
meeting is assumed to coordinate project design elements. A second meeting will be held to
review comments from the City on the design drawings and report.
Task 2: Final Design of Proposed Improvements — A full design set of drawings will be
developed, including: Cover Sheet; General Information and Survey Control Sheet; Photo Based
Plan and Profile Sheet(s); Stabilization Structure Details; Seeding and Specialized Planting Plans,
and Miscellaneous Detail Sheets. The construction drawings will provide adequate detail to
construct the improvements using City of Fort Collins maintenance crews. All drawings will be
completed in AutoCAD Civil 3D and will be provided to the City electronically. Given the
significant number of stabilization structures and uniform channel conditions, the proposal
assumed that only a typical detail will be required for construction information related to the riffle
drop structures.
In addition to completing final design drawings, costs estimates and technical specifications for
the City crews will be generated. ICON and its team will prepare, or assist the City, in obtaining
all permits required for construction of the project, including City floodplain permits, a State of
Colorado Groundwater Discharge Permit, and U.S. Corps of Engineers 404 Permit. Preparation
of one (1) temporary construction easement has been included, if it is required. A stormwater
management plan will also be prepared for permits through the City. It is anticipated that the area
of disturbance will be much less than I -acre in size and a State stormwater permit will not be
required.
Utilities were located by the City as part of the initial project survey phase. No utilities have been
identified by the City within the project are that will conflict with the proposed design.
Therefore, utility design has not been included in the proposal.
Task 3: Project Deign and Floodplain Modeling Report — After completion of the final design
drawings, ICON will prepare a project design report to discuss and document all of the decisions,
assumptions, and calculations that were part of the final design of the improvements. This report
will also incorporate City's Guidelines for Submitting Floodplain Modeling Reports (Updated
2011), as the Clearview Channel floodplain will be modified with the design. ICON will adjust
the design grades to demonstrate that the project can be completed without rises in the floodplain
elevations, unless the rises can -be mitigated with the project. It is anticipated that given the
changes in the channel profile and grading, this process will be somewhat iterative in developing
the final design elevations. A technical appendix and GIS layers reflecting the proposed revisions
to the floodplain, floodway, base flood elevations (13FE's), and cross -sections will be provided
with the final report.
Fees and Schedule — Fees for this phase of the project are $35,365, as shown by the attached
project estimating sheet. The project will be completed within four months in anticipation of
spring/summer construction in 2013.
Thank you very much for working with us on this phase of the project. Please give me a call at
303-221-0802 with any questions that you may have.
Sincerely,
ICON Engineering, Inc.
Craig D. Jacobson, P.E., CFM
Associate
ICON ENGINEERING, INC.
PROJECT ESTIMATING SHEET
iIGN(NHbtYn al6lanvoaRf _ _._ ___
_.
•a, wre reps, ve
_'"'
Princpal_
Rokaianal
Prohssbnal
.Enqm
GISICAD
A&R
Roied
S q
De9Ve,
5„„
cn
MW
$1e5
$In
$115
SM
S50
555
S70
$140
C=
De -
Houn
Hour
Hass
Hour
Haws
Haun
Haan
Haan
TOTALS
Report
4
6
$90
$1,320
is
1
2
4
-
$10
$695
vey Control
2
2
4
$10
$830
ssumed)
2
6
12
8
$to
$3,130
t 25'Intervals)
1
2
8
12
$10
$2,305
ures (1 Typical Sheet)
1
2
8
10
$10
$2,145
d Miscellaneous Details _ —
1 - ---
4 _
8
---- -
----
- 8
-
_ -----
$10 _
$2,255
Ill Wetland Detail Assistance from ERO)
2
6
$10
$760
2
4
10
4
$25
$1.855
Development, State GW Permit)
2
6
2
$20
$1,140
n
2
4
$730
2
12
_
_
_
$10
_$2,490
Report
1 Design
4
24
4
$3,620
Iplain Modeling
4
12
24
$3,840
2
4
16
8
8
$100
$3.914
icriptions (1 Assumed)
1
4
$21
S436
Iluation, 404 Permit, Wetland Planting, Seeding
$3,900
$3,900
AL FINAL DESIGN PHASE
9
48
124
18
82
12
4
0
14,236
535,365
$1,305
$6,430
$14,260
$1,584
$6,560
$G60
$28o
$0
$4,23G
$35,365
_ _ _ _ _
ICON ENGIWERING, INC.
PROJECT ESTIMATING SHEET
MLVYI(D 9r: CP/
MYty
ROYYYAY
M10
El
W]/CAo
bnw
O,qe
]V.ryp
6vM
Yx
CMECR£a ar: aJW
oarelaaaa]
nn
Erq.�nl
uu
EgYMI
um
II
rm
end
]m
]]]
Gw
ew
Iw.p
WMI.
To*ua
]ro
Final Design Drawings and Design Report
4
6
2 Final Design of Proposed Improvamanta
a. Cover Sheet
1
2
4
$10
$695
_. D. General Information Shoot wlNSurve Control
_ __.. _.... ...
2
2
4
E10
E830
u___._..
C. Detailed Plan and profile Shoot (7 Assumed)
2
8
12
8
..
E70
E3,130
d. Channel Crosscactierls(Assume at 25-Intervals)
1
2
8
12
f10
$2.305
o. Detail Strout for Stabilization Structures (1 Typical Shoat)_ _ _ _
1
2
i0
$10
$2.145
C Detail Sheet for Bank Trost and Miscolloneous Ootalls
_
1
4
_8
8
8
E10
E2,256
g. Sending and Planting Plan (Including Weiland Detail Assistance from ERO)
2
6
$10
$760
h_Stormwatsr Management Plon_ . . _....__ _...__...__.._ .
__......
.2..
_ 4
10.
_..
4
E25
f1,855
1. Permit Asaistsnco (404, ovolopme Floodpl4ln Dnt, SmcaGW Pormlq _ _ _
_
2
8
2
_
E20
E1,140
J. -Final Quantities and Cost Tabulation
2
_
4
_
„
$730
k. Tochnical Specifications
2
6
12
$to
$2,490
J Project Design 8 Floodplaln Modeling Report
a. Update Hydraulic Modeling for Final Design
4
24
4
f3,620
b. Grading Iterations to Support Floodplain Modeling
4
12
24
f3,84D
c._Report Text Figures and Tables ._. _. _
2_
4. ...
16_.
8
_
8
$100
f3,914
4 Easements
a_Praparo Easomom Exhibits and Doscdptlone_(/ Asaumod) _ _
1
4
$21
S436
SUBCONSULTAN75ERVICES
a. ERG Resources - TBFJWotland Evaluation, 4D4 Permit. Watland Planting, Seeding
E3,9D0
$3,900
TOTAL FINAL DESIGN PHASE
B
48
124
18
82
12
4
B
54.236
S35 365
51J05
1 $5,4811
1514.ZOU
1 $1584
i6580
E660
f260
EO
$4.236
$35365
Project: CLEARVIEW CHANNEL
Engineering Budget Summary Sheet
Date: 01.01.2013
Engineer: Icon
Project Manager: Craig Jacobsen
City Project Manager: Mark Taylor
Billing Summary
Billing Contract Change Change
Date Amount Orden Order #
Design Phase Services
1-Jan-13 $35,365.00
Bidding @ Construction Phase Services
Change Order Summary
C.O. # Date Description of Change
Change Order Total:
Change Order % of Total Contract Amount:
$ 35,365.00
Acct. No.: 5046410043.521130.3
P.O. No.
Billing Total Billed Amount Percent
Amount to Date Remaining Billed
$35,365.00 0.00%
Amount
$0.00
0.00%
I:\Eng\Tmtague\engineer pay_sumsh_Final Design Clearview Channel.xlsx