Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7336 SHIELDS STREET & LAPORTE AVE BRIDGE REPLACEMENT (3)Planning, Development & Transportation City of Engineering lgSIlti Flirt Co fl � n s sa0 I S P.O. North 80 , Avenue �, ( 0— r ` FotBox Pod Collins, CO 80522.0580 -Ire C / Engineering 970.221.6605 - 070.221.6378 - fax Change Order Form PROJECT TITLE: Lapott Bridge & Shields Bridge Replacement PROJECT NUMBER: 400902103.6 (Bid #7336) CONTRACTOR: Zak Dirt (PO #9121438) CHANGE ORDER NUMBER: 4 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. . 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 1.92. See attached Invoice for details 3. The contract cost will not change. $0.00 4. There will be no change In contract time ORIGINAL CONTRACT COST $2,063,056.06 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $0.00 TOTAL % OF THIS CHANGE ORDER 0.00% TOTAL C.O. % OF ORIGINAL CONTRACT 0.00% ADJUSTED CONTRACT COST $2,063,055.06 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: UAI t_: (Purchasing Agent over $60,000) cc: contractor Purchasing Project He 121311Z- Ia--lLi -1-2- 12-14-12 CHANGE ORDER NO.4 Sonia£"""lDin. fmm Centoct .Untt SEA �. lQuafntttly, UnO Price (S). Itemprice (S) . GWMMy 1 A010Ym ISI,.. , . Oeaamy Amount (t) 1 202.OW10 REMOVALOFTREE 6.00 S1.000.00 S6,000.00 9.00 $9,000.00 3.00 $3.000,00 2 202-00200 REMOVAL OF SIDEALK SY 267.00 $5.75 $1.535.25 375.90 S2,161.43 108.90 S626.18 3 202-00203 REMOVAL OF CURB AND GUTTER LF 1.037.00 S2.50 $2.592.50 1,218.00 S3,045.00 181.00 $452.50 4 202-00220 REMOVAL OF ASPHALT MAT SY 2296.00 $3.50 S8.036.00 2.416.99 S8.459.47 120.99 S423.47 5 208-00510 FILTER MATERIAL (CLASS A) CY 1011.00 S58.00 S6,048.00 172.00 S9,632.00 64.00 53,584.00 6 2084=34 GRAVEL BAG LF 68.00 $6.60 $448.80 88.00 $580,60 20.00 S132.00 7 403-33821 HOT MIX ASPHALT GRADINGS 100 PG 64-22 TON 125.00 S88.65 $11.081.25 256,91 S22.77507 131,91 S11,693:82 8 609-21020 CURBAND GUTTER TYPE2 SECTION II-B LF 283:50 574,50 54, 110.75 380.50 55.517.25 97,00 S1,406.50 9 62741W11 PAVEMENT MARKING PAINT (WATERBORNE) GAL 8% 5155.00 51,240.00 9.17 St 421.35 1.17 5181.35 70 C04-0007 ADDITIONAL LF COST FOR FAST TRACK CONCRETE LF 0.00 S6.81 50.00 97.00 S660.57 97.00 5650.57 11 700.70010 IFIA MINOR CONTRACT REVISIONS I LS I 1.00 1 $280,622.051 $280.622.06 0.92 1 $258,461.68 -0,08 1 -$22,160.38 Total = SO.00 1 Additional tree removal at the SE.comerof the La orteANhitcemb intersection. Tree removed due to prormity of the box. 2. Additional sidewalk removal along the east side of Whitcomb south of the intersection due to a design error at the box crossin . 3 Additional curb and gutter removal at Shields Bridge Project to fix damaged curb. 4 Additional cost to remove appmxima0ey 2 1 - thick asphalt pavement at the Shields Bdd e. 5 Additional filter material placed at Shields bnd a to accommodate bridge design. 6 Additional gravel,bags needed at Shields bntl a for necessary erosion control purposes. 7 Additional as hlat plamd along the. east Sid eof Whitcomb south of the intersection. Dueto a design error at box crossing. e Additional curb and gutter placed at Shlelds Bridge to re lace damaged wrb and gutter 9 Additional pavement markingpaint to accommodate designed temporary sW in for Phase I at Shields Bridge. t0 Additional cost to install mrb and gutter with fastback concrete. 11 Reduction of Force Accountto aCCOmnlodate pmlect Chan es pmviously mentioned.