PROJECT TITLE: Quiet Zone Study, Phase ll
PROJECT NUMBER: 901016
:TOR: Felsburg Holt & Ullevig (PO 49124195)
ORDER NUMBER: 1
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change In contract time.
1&2. See attached sheet for detail.
3. The contract cost will Increase by $ 10,000.00
4. The contract tune vldl be extended until May31, 2013.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$90.000.00
$0.00
$0.00
$10,000.00
11.if%
f1.ff%
$100,000.00
ACCEPTED BY:
DATE:
Z I t Z
(Contractor's Representative)
SUBMITTED BY:
DATE:
12111 / 12.
sportation Planning)
APPROVEDBY:
MIA2"
DATE:
IZ'11 - 1 —
epartment Head)
APPROVED BY:
D
DATE:
(Purchasing Agent over $60,000)
r G Cw*adw
purchuft
Pm*d Fib
• FELSBURG
(® H O LT &
ULLEVIG
engineering paths to transportation solutions
December 5, 2012
Amy Lewin, PE
Transportation Planner
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
RE: BNSF Quiet Zone — Phase 1 Follow-up
BNSF Crossings Downtown
Dear Ms. Lewin:
Felsburg Holt & Ullevig is pleased to submit this proposed Scope of Work and Hour and Fee
Estimate to assist the City in follow up work related to Phase 1 of the Railroad Quiet Zone Study
along the BNSF Railway corridor through downtown Fort Collins.
Completion of Phase 1 of the Quiet Zone Study provided guidance for the downtown railroad
crossings and crossings east of town. Construction of the .City's Mason 2-Way conversion project
and Track Rehabilitation project provided some improvements and upgrades to crossing
equipment downtown. The purpose of this follow-up work is to reassess the downtown corridor with
the recently constructed elements in place, and determine if other options may be available to the
City for pursuit of a Quiet Zone.
Felsburg Holt & Ullevig has the in house expertise to review the FRA Final Rule in more detail
relative to the downtown scenario, and correspond with the FRA regarding other possible options
for consideration.
We have appreciated the opportunity to work with the City on the initial Phase 1 Quiet Zone Study,
and currently on the Phase 2 Study for crossings south of town. We look forward continuing to
assist the City in the advancement of the Quiet Zone pursuit.
Please contact us if you should have any questions. Thank you.
Sincerely,
FEB
JLLSURG HOLT & UL VIG
4
Thomas W. Anzia, PE
Principal
Step anie J. San line, PE, ESC
Project Manager
6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tel 303.721.1440 fax 303.721.0832
wv tiv.fhueng.com info@fhueng.com
Felsburg Holt & Ullevig December a, 2012
CITY OF FORT COLLINS
BNSF QUIET ZONE STUDY — PHASE 1 FOLLOW-UP
SCOPE OF WORK
The following Scope of Work is provided for follow-up work related to the Phase 1 Quiet Zone
Study completed in July 2011 which included evaluation of public at -grade crossings through
downtown Fort Collins and points northeast of downtown. This follow-up work will specifically
review other opportunities for silencing of train horns through downtown Fort Collins,
The Scope of Work for this follow-up effort includes the following tasks:
A. Initial Phase I Follow Up Meeting
1) FHU will review the FRA Final Rule regarding the use of locomotive homs to
determine other possible options for pursuing a Quiet Zone downtown. This
information will be summarized in a draft addendum memo to be submitted to the
City for review
2) FHU will meet with, City Staff to review the draft memo and discuss potential other
opportunities for silencing of train horns through downtown Fort Collins
B. FRA Coordination Regarding Additional Quiet Zone Options
1) After meeting with City Staff, FHU will coordination with the Federal Railroad
Administration (FRA) for discussion regarding other possible options for Quiet Zone
establishment
2) FHU will present the research identified in the draft addendum memo to FRA for
discussion and follow-up, and ask for guidance and other recommendations from
FRA
C. Review of College-BNSF and Cherry-BNSF Crossings
1) FHU will review the existing crossing warning devices and configuration at the
College and Cherry crossings of BNSF following completion of the Mason 2-way
conversion construction, to verify equipment and street configurations
2) FHU will identify the remaining required modifications of each crossing necessary
for Quiet Zone establishment
3) FHU will follow up with City Staff regarding the potential for pursuit of Quiet Zone
establishment at these two crossings
D. Development of Train Horn Schematic and Discussion
1) FHU will compile a schematic drawing depicting the standard train horn pattern
through downtown Fort Collins, for discussion purposes
2) FHU will engage in discussion with FRA regarding the downtown train horn pattern
and allowable variances in accordance with the Final Rule
3) FHU will provide updated information from FRA to City Staff regarding this issue
E. Determination of Realistic Quiet Zone Calculator Risk Index
1) FHU will complete an initial calculation of risk using the FRA Risk Calculator and
allowable representation of the crossing warning devices currently installed through
downtown
Page 1 of 2
Felsburg Holt & Ullevig
December 5, 2012
2) FHU will discuss with FRA the potential for a more accurate calculation of the Risk
Index which reflects the actual non-standard installations present through downtown
3) If FRA determines a way to better reflect actual risk by considering actual crossing
warning devices, FHU will complete a follow up calculation of the risk index
F. Determination of Viable Options for Downtown Quiet Zone
1) Following coordination with the FRA, FHU will summarize information regarding the
viable options for a downtown Quiet Zone
G. Compilation of Results/Final Phase I Addendum Memo
1) FHU will compile the resulting information from coordination with the FRA as well as
calculations and research regarding other options
2) FHU will updated the draft Phase I Addendum Memo to reflect final viable options
H. Finalize and Submit Final Addendum Memo
1) FHU will prepare ten (10) hard copies of the final memo, and provide the City with
an electronic version on CD.
Proposed Schedule:
1, FHU anticipates completion of the Final Phase I Addendum Memo by end of May 2013.
Page 2 of 2
Felsburg Holt Ullevig
NOTES:
1. Fee estimate is based on tasks identified in the BNSF Quiet Zone Study - Phase 1 Follow-up Scope of Work,
dated December 5, 2012.
2. This fee estimate was developed based on the FHU 2012 Rate Schedule for time and materials.
Thomas W. Anzia, P.E.
Principal
City of Fort Collins
BNSF Quiet Zone Study - Phase 2
BNSF Crossings.: South of Downtown
Phase ll Studv Schedule
18-Jul-12
Revised05-Dec-12
OW'
----------
Notice to Proceed
i_i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
■L7�1■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■'
■■■■■■!_I
��—�■■■_
■■■■■■■■■■■■■■■■■■■■■■■■■■■
Report Submiltal/Cily Review
■■■■■■■■■■■■■■
1`
�!
_1__1■■■�■■■■■■■■■■■■■■■■■■
Report Revisions/Draft Final Report
ity Council Work Session
C Council
■■■■■■■■■■■■■■■■■■■■■■cam■■►*��■■■■■■■■■■■■
Finalize and Submit Ragan
Meetings (Assumes 2)
Agency Coordination/ agement
Notes: 1. This schedule is developed to complete Phase 2 of the Quiet Zone Study as identified in the associated Scope of Work. It Involves the study of the 9 crossings along the BNSF Railway south of Laurel Street to Trilby Road.
'2. Review will include and provide recommendation for any at -grade pedestrian or private crossings within this corridor length.
,3. No Diagnostic Review Meeting. with the BNSF Railway will be conducted as part of this scope of work. Following this study,as specific crossings proceed to design for QuietZone establishment, the Railroad. PUG and FRA should.be
invited to participate In a Diagnostic Review at that time.
4.. Meetings maybe held as heeded, and are tentatively shown as follows:
a. Following development of the crossing conditions summary, a project meeting maybe conducted In August to discuss the anticipated crossing treatments for Quiet Zone establishment.
Following development of the. crossing exhibits, and prior to submittal of the draft report, a. progress meeting witli the Citycould beheld to review the crossing exhibits and oiscussany additional concerns at each crossing. .lt is
anticipated that one concept plan for each crossing.
Following review of the draft report, and the City Council Work Session, finalrevisionsWit be made prior to Issuing the. Finale Study Report. The City Council -Work Session may be held in either January or February 2013, and
will be confirmed at a later date.
BNSF Quiet Zone Study - Phase 1 Follow Up
BNSF Crossings' Downtown
Phase I Quiet Zone Study - Follow Up Schedule