Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7307 TRANSPORTATION PLANNING & ENGINEERING CONSULTANT ON-CALL (2)City-of For,14 N Planning, Development & Transportation Transportation Planning 281 North College Avenua P.O. Box 500 Fort Collins, CO 80522.0580 9T0.221.6605 970,221.6378 - fax Change Order Form PROJECT TITLE: Transportation Planning & Engineering Consultant On -Call PROJECT NUMBER: 901003 (WO #9101003-01-11) CONTRACTOR: Atkins North American Inc.. (PO #9117628) 1. Reason for change. 2. Description of Change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 25,000.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: (Contractor's�` resentati APPROVED BY: I (Transportation Planning - Project Manager) $40,000.00 $16,456.00 $0.00 $25,000.00 62.50% 103.64% $81,456.00 DATE: DATE: APPROVED BY: DATE: (Purchasing Agent over $60,000) x contractor Pumhasing Project File Atkins North America, Inc. 4601 DTC Boulevard, Suite 700 Denver, Colorado 80237 Telephone: +1.303.221.7275 Fax: +1.303.221.7276 www.atkinsglobal.com/northamerica December 7, 2012 Aaron Iverson, AICP Interim Transportation Planning Director City of Fort Collins 281 North College Avenue, PO Box 580 Fort Collins, CO 80522 RE: 7307 Transportation Planning & Engineering Consultant On -Call Work Order Number: 901003-01-11 Atkins Project Number: 100025974 Contract extension to December 31, 2013 and additional funds: $25,000 Dear Aaron: Thank you for extending our contract for the Planning and Engineering Consultant On -Call through the end of 2013. We acknowledge that the rates submitted with the original contract for 2012 will not change. Attached is a scope of work that describes the tasks anticipated. Please let me know if you require any additional information. If you have any questions regarding this information, please contact me at 303-221-7275, or carrie.wallis@atkinsglobal.com. Carrie Wallis, P.E., Project Manager V1 z Scope of Woa k0 ' s 7307 Transportation Planning s Engineering Cois_/OvVI{i The City of Fort Collins, Colorado has contracted with Atkins to perform Transportation Planning Studies and related analyses to evaluate long range and short term multi -modal transportation needs. Assignments or tasks will be assigned on an as needed basis. Atkins will provide assistance in implementation of action items in the Transportation Master Plan, the Pedestrian Plan, and the Bicycle Plan, including but not limited to the following items: • Project management and coordination • Developing the scope and fee for various projects • Data collection • Socio-economic data preparation and analysis • Traffic and transit forecasting and modeling (system level, subarea and microsimulation, visual simulations) • Corridor studies • Project cost estimates and financial planning • Innovative finance • Public participation • Preliminary engineering • Regional planning and development • Environmental assessment • Multimodal planning (freight, bicycle, pedestrian, transit etc.) • Urban design, imaging and rendering • Other related assignments Tracking of Tasks As previously stated, assignments or tasks will be assigned on an as needed basis. As tasks are assigned by the City, the Atkins Project Director will track all items and report monthly to the City Project Manager the financial status of the task order. Contract data Contract value: $25,000 Duration: For budgeting and scheduling purposes, duration of 12 months is assumed for this task order (through December 31, 2013). This is a one year agreement but, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (A) additional one year periods. This is the first year extension, adding an additional $25,000, Plan Design Enable