HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9126134�Ilz�i�l
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
1cgL1gj
DATED: // 2�, -2-
Work Order Number:
Purchase Order Numhar
Project Title:
Commencement Di
Completion Date:
Maximum Fee: (time and reimbursable direct
Project Description:
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the.Professional Services
Agreement between the parties. In the event of a.
conflict betirween or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of Exhibits._, _, _,
consisting of _ U pages are hereby accepted
and incorporated herein, by this reference, and
Notice to Proceed is hereby given.
Professional:
By:� -f
Date: "4\
6b
City of Fort Collins
Submitted By: Gr\ U
Pr ect a
Date: l 7 1 L
Reviewed by:
Senior Utility Engineer
Approved by:
Utilities General Manager
Date:
Approved by:
Director of Purchasing & Risk Management
(if over $60,000.)
Date:
43l q�-
�
Connell Resources.1 •t Ina\
7785 Highland Meadows Pkwy, #100
Fort Collins, CO 80528
Phone: (970) 223-3151
Fax: (970)223-3191
Estimator: Roland Tremble
QUOTATION Date: 11/15/2012
Submitted To:
City Of Fort Collins - Natural Resources
Bid Title
Bobcat Ridge Road Grading
Address.
Fort Collins, CO
Bid Number:
Project Location:
Bobcat Ridge Open Space
Contact:
Ryan Kogut
Project City, State:
Fort Collins, CO
Phone:
970-416.2206 Fax,. 970-416-2211
Engineer/Architect:
We offer for your consideration the following Quotation which, if accepted, shall constitute a contract between us.
Item # Item Description Estimated Quantity Unit Unit Price Total Price
001
Mobilization And Demobilization With Lowboy Trailer
2.DO DY
$1,180.00
$2,360.00
002
06 Dozer
2.00 DY
$1,130.OD
$2,260.00
003
]D 210 Skip Tractor
4.00 DY
$825.00
$3,300.00
004
Foreman Wlth Pickup
4.00 DY
$460.00
$1,840.00
004
Trade Supervisor
2.00 DY
$520.00
$1,040.00
005
Base Haul
45.00 TON
$25.00
$1,125.00
Total Bid Price:
$1.1,925.00
Notes:. Pricing Is based upon Site visit, and the assumption that all work would be completed and billed based on actual time spent on site and
billed based on Connell current time and material rate sheet.
• Performance and Payment bond is excluded but can he included for 1% of Contract value
Bobcat Ridge Road Grading Page 1 of 2