HomeMy WebLinkAboutWORK ORDER - AGREEMENT MISC - WESTERN ECOSYSTEMS TECHNOLOGY INCyla sga9
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITIES OF FORT COLLINS AND GREELEY
AND
WEST, Inc.
DATED: 8/18/2005
Work Order Number: HS-6
Purchase Order Number (Fort Collins):
Purchase Order Number (Greeley):
Project Title: HALLIGAN-SEAMAN WATER MANAGEMENT PROJECT
Commencement Date: September 19, 2012
Completion Date: March 31, 2013
Maximum Fee: $1,028,552
Project Description: Continue NEPA permitting for the Halligan -Seaman Water Management
Project.
Scope of Services: See Exhibit "A", attached
Professional agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Professional Services
Agreement between the parties. In the event of a conflict between or ambiguity in the terms of
the Professional Services Agreement and this work order (including the attached forms) the
Work Order shall control.
The attached Exhibit "A", consisting of fifty five (55) pages is hereby accepted and incorporated
herein, by this reference, and Notice to Proceed is hereby given.
Professio
By:
Date: / 0 / a _
Attachment A
CDM SMITH Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
�r r PercentE MonNs i � ..
Task Statue Xtiiv.a icPereent:. 'rComments
Development
Task,1 yeriflcafion of Cities M00SIM
Hy8rology Model
IBSNZ-AItern811v8 SCrBBldllg � -. ':,, . I - Ie` s .';.L' _ _
Address comments from 3PC review on -
alternatives report
Task 3 -Meetings andadministration
buppowng DOCLUTIeWS
Task 11-Purpose and Need (Chapter
and Attested Erivlrodmerit (Chapter 3)
Revise text In Purpose and Need (Chapter
1) per latest hydrology modeling
Task 7(a) r Hydrol ogy ns Simutatla, .•
Report
Prepare draft and finalize report
Summary of report
Prepare draft and finalize modeling
presentation
Task 8= Meetings and -administration
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Attachment A
HARVEY ECONOMICS (HE) SIX-MONTH BUDGET
(August 1.2012 through January 31, 2013)
SIX-MONTH SCOPE OF WORK
Phase II Alternatives Screening
Task 2 - Identification, Screening and Analysis of Alternatives:
HE will participate in the alternatives screening by reviewing the process and providing input as
the final alternatives are developed. An additional round of coordination with the Participants for
defining the No Action Alternative will be required.
Sub -task 2.1 Draft Chapter 2 (Alternatives) of the EIS:
HE will provide limited review and input regarding the preparation of Chapter 2 during this time
period.
Sub -task 2.2 Draft Alternatives Report:
HE will prepare a provide review and No Action Alternative information for the draft alternatives
report.
Task 3 - Meetings and Administration:
HE will attend meetings and perform monthly project management activities.
Phase III Draft EIS and Supporting Documents
Task 1 - Purpose and Need and Affected Environment:
HE assumes that one update of the demand analysis based on current methodology will be
required, along with limited further coordination with EPA. Prior to finalizing the report, a review
and modifications of the supporting technical memorandums will be performed. This task will be
completed during the six-month period.
Task 7 (b) —Technical Reports:
During the six-month period identified HE will initiate socioeconomic impact technical report.
Monthly Status Report
The monthly status report for HE identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This report will be updated by HE at the end of
each month to reflect the progress of the identified tasks.
Current Budget Request
HE requests a budget of $117,020 for the scope of work provided above to be completed over
the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
HE Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
past
Teak,_ H , _,,,:.'
Status
rGom late=Peicenf
Comments
Phase 11 - ALTERNATIVE SCREENING
D DEVELOPMENT
Task 2 Ideetifieation,'Sereeriing and
_
Analyals,of Attematives .:
;
Further work on identification, screening
and evaluation of altematives
Further development of no action
alternative
Review of alternatives for impact
evaluation
Sub Task2:? Oraft.Chapte►2
(Alternatives) of the EIS
Request to engineering team members
for cost, employment and other
characteristics of altematives
Sub -Task 22'- Draft Altemativas Report:.
Review of Alternatives Report
Teak 3 IVleetings`end'Adminlatration
PHASE III DRAFT EIS AND£SUPPORTING DOCUMENTS
Need and Affeetad
Task 1 P,uiPoae and -j
En% l4 meM(Chepters 1 and 3'of the
'b
EIS)
Continue to gather social, economic,
demographic, and recreational data for
the affected environment section
Continue to gather public facility, service,
and fiscal data for the affected
environment section
Respond to requests for Purpose and
Need information
Respond to requests for coordination
with the EPA regarding Purpose and
Need
Task 7(b) - TechNcal Reports:
Initiate socioeconomic Impact analyses
Affachmenf A
GEI SIX-MONTH BUDGET
(August 1. 2012 through January 31, 2013)
SIX-MONTH SCOPE OF WORK
Phase III Draft EIS and Supporting Documents
Task 1 - Affected Environment (Chapter 3):
Based on the baseline technical report, GEI will provide a summary of the information to be
incorporated into the aquatic resources section of Chapter 3 of the PDEIS. This task will be
completed during the six-month period.
Task 2 - Environmental Consequences (Chapter 4):
GEI will coordinate with the 3PC Team to develop the approach for the impact analysis that will
be discussed in Chapter 4 of the PDEIS. GEI will draft the aquatic resource section of this
chapter, which will be largely based on documentation of detailed analysis conducted in the
impact technical reports. It is anticipated that during the identified six-month time period this
effort will be initiated, but not completed.
Task 7 (b) - Technical Reports:
The baseline reports require revisions to all technical analysis based on the revisions to the
CTP hydrology. These revisions include changes to documentation, exhibits, and reporting and
will be completed during the identified six-month period.
GEI will prepare the habitat assessments and resource impacts report for the HSWSPs and the
final alternatives. This task is based on the anticipated availability of hydrology and identification
of final alternatives.
Monthly Status Report
The monthly status report for GEI identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This report will be updated by GEI at the end of
each month to reflect the progress of the identified tasks.
Current Budget Request
GEI requests a budget of $43,843 for the scope of work provided above to be completed over
the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
GEI Status Update for HSWSPs — AUGUST 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
t Y , Tk
?;Percents
MoMh's
Tasks .Status
,
' Com leto_
_Perc ent _
r ,
.,Comments-,
PHASE III Diift EIS and SUIDI)OIling DOCLHII-elltS
Task 1 Affected Enylronment '
n ' '
�
=(Chapter3)
Finish Affected Environment section of
North Fork (Not included in CTP)
Begin preparation of HSWSPs draft
Chapter 3 aquatics section.
Task 2- Envlronmental Corise_quenees
(Chapter 4)
Begin preparation of Draft Chapter 4
aquatics section with 313C EIS Team.
TASK 7(b)`-7eehnlcal,Repoifa
Incorporate the revised hydrology into the
CTP Baseline Technical Report
Rerun 2-D fish habitat simulations for
baseline conditions
Incorporate changes in habitat runs into
revised CTP Baseline Technical Report
Incorporate 2011 agency and municipality
comments into revised CTP Baseline
Technical Report
Update CTP Baseline Technical Report
with any new data available since
spring 2011
Incorporate information from other related
resources (geomorphology, water
quality, etc.) into revised CTP report
Release next version of CTP Baseline
Technical Report to 313C Team for
review
Revise report based on comments from
3PC Team
Coordinate impacts approach with 3PC
EIS Team
Attachment A
CENTENNIAL ARCHAEOLOGY. INC. (CENTENNIAL) SIX-MONTH BUDGET
(August 1. 2012 through January 31, 2013)
SIX-MONTH SCOPE OF WORK
Phase III Draft EIS and Supporting Documents
Task 7 (b) - Technical Reports:
Based on the preliminary draft of alternatives, there will likely be additional field work required
for the cultural analysis. Centennial assumed that a Class II survey may be required at three to
four locations, along with several small pipeline routes and a pump station. Centennial has
prepared a draft technical report with the alternatives previously identified. The budget for this
six-month period will allow Centennial to conduct the additional Class II surveys. Centennial will
use their remaining reallocated budget to continue to update the draft report, but the report
preparation for the additional field work is not included in this budget.
Monthly Status Report
The monthly status report for Centennial identifies the various sub -tasks that will be completed
or initiated during the identified six-month period. This report will be updated by Centennial at
the end of each month to reflect theprogress of the identified tasks
Current Budget Request
Centennial requests a budget of $8,750 for the scope of work provided above to be completed
over the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
Centennial Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
F ,
Y y < Percent MoMh'B
ask = .: Statuae. Core late. ,.* PerieM : Com�ents '. , ..
survey at four
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Phase III Draft EIS and Supoortina Documents
<Provide details here about any problems or unexpected changes — or requests by Corps or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Attachment A
SWWRC SIX-MONTH BUDGET REQUEST
Tasks
11 Alternatives Screening and Development
Principal
Anderson
$175PH,ASE
Principal
O'Grady
$155
Alts. Assistance
Staff
$80
SWWRC
SUBTOTAL
Task 1 Verification of Cities MODSIM Hydrology Model
-
Task 2 - Identification, Screening and Analysis of Alternatives
110
20
220
$39,950
Sub -Task 2.1- Draft Chapter 2 (Alternatives) of the EIS
20
8
60
$9,540
Sub -Task 2.2 - Draft Alternatives Report
20
4
20
$S,720
Task 3 - Meetings and administration
8
8
-
$2,640
Subtotal Hours
158
40
300
1 498
Subtotal Labor
$27,6S0
$6,200
$24,000
$57,850
Reimbursable Expenses
-
$200
$200
Phase 11 Labor and Expenses
PHASE III - Draft EIS and Supoorting Documents
$58,050
Task 1 - Purpose and Weed and Affected Environment
(Chapters 1 and 3 of the EIS)
40
$6,200
Task 2 - Environmental Consequences (Chapter 4 of the EIS)
_
Task 3 - Cumulative lmpacts (Chapter, 5)' and Coord' &Consul
(Chapter 6)
a
:..
Task 4 - Biological Assessment
Task 5 - Section 404(b)(1) Analysis
Task 5 - Printing and'Distribution of DEIS.and Prep for`Public
Hearings':.
,.
Additional Appendices
a. Hydrology Simulations Report
b. Technical Reports
C. Recreation Opportunities and Constraints Report
d. Fish and Wildlife Coordination Act Report
_
e. Draft and.fIhal Mitigatlon,ariti Monitoring Plan
t. 'Draft Programmatic Agreement on Cultural Resources
Task 8 - Meetings and administration
Subtotal Hours
40
40
Subtotal Labor
$6,200
$6,200
Reimbursable Expenses
$200
Phase III Labor and Expenses
$6,400
PHASE 11 AND PHASE III TOTAL
Nlnfc- V.11-,.. 11I I...iln .n _.L..L_....
$64,450
Attachment A
ANDERSON CONSULTING ENGINEERS, INC. (ACE) SIX-MONTH BUDGET
(August 1, 2012 through January 31, 2013)
SIX-MONTH SCOPE OF WORK
Phase III Draft EIS and Supporting Documents
Task 1 - Affected Environment (Chaoter 3):
ACE will provide a summary of the information to be incorporated into the sediment
transporUgeomorphic section of Chapter 3 of the PDEIS in conjunction with the 313C Team. This
task will be completed during the six-month period.
Task 2 - Environmental Consequences (Chapter 4):
ACE will coordinate with the 3PC Team to develop the approach for the impact analysis that will
be discussed In Chapter 4 of the PDEIS. ACE will draft the sediment transport section portion of
this chapter, which will be largely based on documentation of detailed analysis conducted in the
impact technical reports. It is anticipated that during the identified six-month time period this
effort will be initiated, but not completed.
Task 7 (b) - Technical Reports:
The Baseline Report (Mainstem) requires revisions to all technical analyses based on the
revisions to the CTP hydrology. These revisions include all technical analyses for channel
hydraulics, sediment transport and geomorphic assessment for baseline conditions. Comments
received on the draft report will be addressed prior to finalizing. ACE will assist other resource
specialists in support of their CTP baseline technical reports. This task will be completed during
the six-month period.
The 2-D Modeling Report draft has been submitted to the Corps and the assumption is that
revisions will be required. This task will be completed during the six-month period.
Baseline Report (North Fork) requires revisions to all technical analyses based on the revisions
to the CTP hydrology. These revisions include changes to technical documentation. This task
will be completed during the six-month period. This task will be completed during the six-month
period.
The HSWSPs Project Report (Project Alternative(s) Impact Assessment) will be initiated but not
completed during the identified time frame.
Monthly Status Report
The monthly status report for ACE identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This report will be updated by ACE at the end of
each month to reflect the progress of the identified tasks.
Aftachment A
AGE SIX-MONTH
BUDGET
REQUEST
Senior Senior
Senior
Protect
Project
GIST
Principal Affiliate Affiliate
Scientlal
Engineer
Englnoet
Engineei
CADD
Engineer Engineer Scientist
11
11
I
11
Tech.
Admin
ACE
Tasks S150 615o S110
$105
504
$84
$7111
$70
•
$60 SUBTOTAL'PHASE
11 Alternatives �crecmnq and Development
ask 1—Verification
of Clues MODSIM
HydrologyModel
ask 2 -
Identlfieatlon,
Screening and
Analysis of
Alternatives
Sub -Task 2.1 - Draft
Chapter 2
(Alternatives) of
the EIS
Sub -Task 2.2 - Draft
Alternatives
Report
Task 3 - Meetings
and administrallo
Subtotal Hours
Subtotal Labor
Reimbursable
Expenses
Phase 11Labor and
Ex nses
'01JASE III - Draft ES
and SUpporting
Documents
ask 1 - Purpose an
Need and Affected
Environment
8
8
2
4
$2,332
(Chapters 1 and 3
of the EIS
Task 2 -
Environmental
Consequences
8
-
-
-
8
-
-
-
-
$1,852
(Chapter 4 of the
EIS
Task 3 = Cumulative
Impacts (Chapter
5) and Cooid ti
�:
..;
_
-
Consul C ....ter6-
,• ,
,._.
Task 4 - Biological
Assessment
Task 5 . Section
404 b 1 Analysis
-
-
-
ask 6 = Printing and
Distribution of
DBS and Prep for
yA
PublIc Hearings
City of Fort Collins:
Submitted By: lX
Special P ects Manager
Date: M - 20 - I'Z
Reviewed By:�
Water Re ources & Treatment Manager
Date: _ "t - 2 k - kjZ.
Approved by;
Director
Date: z14.1'�
Approved by: ��— V C;i'L�._�_,u ?
Di ctgr of Purchasing & Risk Management
Date: 7 2 ( Z--
City of Greel
Submitted 83
Date:
Approved by: ��I r 'n
Di for Water & Sewer Department
Date:
Approved by:
City torney
Date: I_-n
Approved by:
Director of Fin
Date: A —�
Approved by:
City
Date:
Attachment A
ACE Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
Task �'-Sttrh
Pe
GAonth's
. w v
, , Ids}�
Pe►c6M r..
Comments
PHASE III Draft EIS aii d Supportiliq Oocillilelits
Task 1 Phase Affected EnvlronmeM
s
Provide sediment transporUgeomorphlc
section for HSWSPs draft Chapter 3 in
conjunction with 3PC EIS Team
.Task 2 -Envlronmental.Consequenees
'`
Ch ter 4 -
y ;
Coordinate Impacts approach with 3PC EIS
Team
Finalize approach to Impacts assessment
Task 7(b)'- Techm , Reports '
r13asal/neStem -
.. ,._.:.
Incorporate the revised hydrology into the CTP
Baseline Technical Report
Revise all technical analyses for channel
hydraulics, sediment transport and
geomorphic assessment for baseline
conditions
Incorporate changes in technical analyses Into
revised CTP Baseline Technical Report
Provide technical support to other resource
specialists in support of their CTP Baseline
Technical Re orts
Submit draft CTP Baseline Technical Report to
3PC EIS Team
Revise CTP Baseline Technical Report based
an comments from 3PC EIS Team
Submit CTP Baseline Technical Report for
a en / roecl artid ant review
Revise and resubmit CT Baseline Technical
Report based on comments received from
agency/protect artici ants
2D ModeUno
Submit 2D modeling report to 3PC EIS Team
Revise 21J modeling report based on
comments from 3PC EIS Team
Submit 2D modeling report for ag
reveency/praject
Revresbw modeling report
based on comments from agency/project
participants
Attachment A
ERO SIX-MONTH BUDGET
(August 1. 2012 through January 31 2013)
SIX-MONTH SCOPE OF WORK
Phase III Draft EIS and Supporting Documents
Task 7 (b) - Technical Reports•
The budget request of $5,026 is the HSWSPs portion required to complete the CTP work on the
technical reports assigned to ERO. This includes the task of redoing the completed Water
Quality and Riparian and Wetland baseline reports due to the upcoming changes in baseline
hydrology.
Monthly Status Report
The monthly status report for ERO identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This report will be updated by ERO at the end of
each month to reflect the progress of the identified tasks.
Current Budget Request
ERO requests a budget of $5,026 for the scope of work provided above to be completed over
the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
ERO Status Update for HSWSPs — AUGUST 2012
Overview
<34 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
.Task ' �,. � �"s�: ,. b
:Statuer
tCoin lete4
taPe►¢ent�
�CommeMs��;_`
SupportingPhase III - Draft EIS and Documents
Task 7(b) Teohnkal RepoRa
Incorporate the revised baseline
hydrology into_the CTP Water Quality
Baseline Report
Incorporate the revised baseline
hydrology into the CTP Wetland and
Riparian Baseline Report
Incorporate the revised baseline
hydrology into a memo or revised
report addressing socioeconomic
resources on the mainstem
Incorporate the revised baseline
hydrology into a memo or revised
report addressing recreation resources
on the mainstem
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Phase III Draft EIS and Supporting Documents
<Provide details here about any problems or unexpected changes — or requests by Corps or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Attachment A
Monthly Status Report
The monthly status report for Hydros identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This report will be updated by Hydros at the end
of each month to reflect the progress of the identified tasks.
Current Budget Request
Hydros requests a budget of $39,595 for the scope of work provided above to be completed
over the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
Hydros Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
4;r
Phase 11 Alternative Screening and Devolopment
M
7
Completion of conceptstelements/altemativas
screening process Including modeling If
necessary
Development of final alternatives and
guidance or review of incorporation Into
modeling
'Sub -Task 2.1 - Ansft Chajgpr 2 1A
Review of alternatives sections written by
CDM
Review of alternatives sections written by
CDM
Task 3 --fileoUnno and Adminisitrartion
- _ . - .- - - , ., , - * �, -- . � 7
QAIQC of model runs by CDM, including
meebrips and on -call avallabi
PHASE III - Draft EIS and SLIP[Jorting DOCL1111011t$
�T" Purpose and Needand
'2_by
E
Provide support and review for finalizing the
Purpose and Need report and Chapter 1 of
the PDEIS
Task 21-EnvironnM talCoFIS"IMCM
of
Provide support for Initiating sections
regarding the alternatives Impact analysis
hydrology modeling
ThskTja and lo)-Techrflcall Reports
writing and/or review of various technical
reports (e.g. climate change memo, modeling
I
I
report, review of P&N !qp2j_
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Table 1 — Summary Six -Month Budget Request July 2012
without Alternatives Modeling
Period August 1, 2012 through January 31, 2013
Consultant
Six -Month Budget
Western EcoSystems Technology, Inc.
$411,074
DiNatale Water Consultants
$51,350
CDM Smith
$142,500
Harvey Economics
$117,020
GEI, Inc.
$43.843
Centennial Archaeology
$8,750
States West Water Resources Corp.
$64,450
Anderson Consulting Engineers, Inc.
$144,944
ERO
$5,026
Hydros Consulting
$39,595
Total Budget Requested for Six -Month
(without hydrology modeling for alternatives,
but includes technical assistance)
$1,028,652
DELIVERABLES FOR SIX-MONTH BUDGET
Submitted on September 10, 2022
Associated time frame: August 1, 2022 through January 31, 2013
OVERARCHING ASSUMPTIONS:
1) The budget associated with these deliverables does not include the verification of the
alternative model runs.
2) The deliverables are dependent upon the budget submitted and not the time frame.
Some of the tasks may extend beyond the six -months due to delays brought about by
delays in other critical path items or due to more than expected changes to the
deliverables based on reviews by the Army Corps of Engineers (Corps) and/or
Applicants.
3) The budget submitted assumed 40% of the hydrology modeling for project
alternatives would be completed during this period. Therefore, analysis dependent
upon the hydrology (i.e., fish habitat simulations, sediment transport,
geomorphology, etc) could only achieve a maximum completion of 40%.
4) "Completion at end of budget" is the level of completion of the task as defined by
scope submitted September 10 and assumptions listed below.
5) Deliverables are contingent upon an approved budget.
PHASE II ALTERNATIVES SCREENING AND DEVELOPMENT
Task 1—Verification of Cities MODSIM Hvdroloev Model
1) Technical support for Cities modelers, or consultants, to familiarize them with executing a the
suite of models. This task includes two meetings (four hours each) followed up with on -call
support.
Assumptions: This budget does not include the verification of the alternative model runs which
will be addressed in a separate budget submittal.
Completion at end of budget 100%
Task 2 - Identification. Screenine and Analysis of Alternatives
1) Identification of final alternatives to be evaluated in the EIS with the exception of the No Action
Alternative.
Completion at end of budget 100%
,4
PHASE III — DRAFT EIS AND SUPPORTING DOCUMENTS
Task 1- Purpose and Need and Affected Environment (Chapters 1 and 3 of the EIS)
1) Final Draft Purpose and Need Report
Assumptions: The budget submitted assumes limited further coordination with EPA and no
significant revisions from Applicants. This budget does not include the demand update that will
be conducted prior to submitting the DEIS to the Cooperating Agencies.
Completion at end of budget 100%
2) Final Supporting Technical Memorandums prepared by Harvey Economics
Completion at end of budget 100%
3) Draft Chapter Ito Applicants for review
Assumption: No significant changes to purpose and need report are made.
Completion at end of budget 100%
4) Preliminary Draft Chapter 3 (sections ready for internal 3PC review)
Assumption: The elements (i.e., reservoirs) and land based components of concepts (i.e., gravel
pits, pipelines) of the final alternatives presented on September 28, 2012 will not significantly
change as a result of the hydrology modeling of alternatives. Due to the uncertainty of when the
No Action Alternative would be available, the preliminary draft of chapter 3 does not include the
No Action Alternative.
Surface Water
A budget for this task was not requested
Completion at end of budget 0%
Stream Morphology
Assumption: the information will be extracted from the baseline sediment
transport/geomorphic reports
Surface Water Quality
A budget for this task was not requested
Completion at end of budget 100%
Completion at end of budget 0%
Wildlife
Completion at end of budget 100%
Assumption: information will be extracted from the wildlife technical report
Completion at end of budget 100%
Fish and Other Aquatics
Assumption: information will be extracted from the aquatic baseline technical
report. Completion of this task is requires coordination with the following
resource sections, water quality, geomorphology/sediment transport, and
riparian.
Completion at end of budget 90%
Species of Concern
Assumption: information will be extracted from the species of concern technical
report
Recreation
A budget for this task was not requested
Cultural Resources
A budget for this task was not requested
Aesthetic and Visual Resources
A budget for this task was not requested
Land Use
A budget for this task was not requested
Completion at end of budget 100%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
4
2) Draft and Final Executive Summary of modeling report
Completion at end of budget 100%
3) Draft and Final Modeling presentation
Completion at end of budget 100%
Task 7(b) — Technical Reports
1) Draft Species of Concern Technical Report (WEST) —ready for Corps review
Completion at end of budget 100%
2) Draft Vegetation Technical Report (WEST) —ready for Corps review
Completion at end of budget 100%
3) Draft Wetland Resources Technical Report (WEST) —ready for Corps review
Completion at end of budget 100%
4) Preliminary Draft Wetland and Riparian Resources on North Fork (WEST)
Assumptions: The impact analysis for this report requires the spells analysis provided by
Anderson Consultants Engineers. As the alternatives hydrology becomes available and the spells
analysis provided, the wetland and riparian impacts will be evaluated and incorporated into the
report. It is assumed that 40% of the hydrology modeling will be completed with this budget.
Completion at end of budget 40%
5) Draft Wildlife Technical Report (WEST) —ready for Corps review
Completion at end of budget 100%
6) Draft Cultural Resources Technical Report (Centennial Archaeology)
Assumptions: Currently, the impact analysis for this report considers only the alternatives
identified in March 2008. All of the updates to the cultural resources technical report and the
additional field work for the alternatives identified on September 28, 2012 will be completed
within the budget for the six-month scope of work. Updates to the technical report based on
the results of the additional field work were not included in this budget. Furthermore, as the
final alternatives are defined, additional field work may be necessary if the alternatives
identified on September 28, 2012 are significantly altered as a result of the hydrology modeling.
Completion at end of budget 65%
7) Draft Baseline Aquatic Technical Report (GEI) —ready for Corps review
Attachment A
GENERAL ASSUMPTIONS:
The requested budget will fund the work effort through the six-month period of August 1, 2012
through January 31, 2012.
To prepare the current budgets the following hydrology modeling and alternative screening
schedule was assumed:
• CTP hydrology modeling has been finalized with the exception of Run 5a, which will
be final by July 2012,
• HSWSPs hydrology modeling; including alternative comparisons, no action
alternative, and cumulative impacts; will occur between September 2012 to April
2013,
• forty percent of the alternative hydrology modeling for run series 3, 4 and 5 will be
completed during the six-month period identified,
• the final alternatives will be identified by the end of September 2012.
Several other assumptions were made in preparing the budget request. Those assumptions
were as follows:
• We assumed four action alternatives for Halligan, four action alternatives for
Seaman, and three action alternatives for NPIC will be analyzed in the PDEIS.
• We assumed there will be a need to conduct biological reconnaissance surveys and
Class II archeology surveys on 3 to 4 additional locations as a result of finalizing the
alternatives.
• We assumed that where overlap occurs with the NISP EIS, information will be
extracted from the NISP EIS or Technical Reports rather than be re -generated for
the HSWSPs PDEIS, as per Corps direction.
• Costs for the CTP will be shared with the NISP EIS consultant team (half charged to
HSWSPs when related to EIS material, two-thirds to HSWSPs and one-third to NISP
when related to modeling).
• This budget was prepared assuming no unforeseen requests from the Corps,
Cooperating Agencies, or the participants.
15) Draft UP Mainstem Wetland and Riparian Baseline Report (ERO)
Completion at end of budget 100%
16) Draft CTP Mainstem Socioeconomic Baseline Report (ERO)
Completion at end of budget 100%
17) Draft UP Mainstem Recreation Resources Baseline Report (ERO)
Completion at end of budget 100%
18) Draft Water Resources Report (CDM Smith)
19) Draft Surface Water Quality Report (CDM Smith)
20) Draft Groundwater Report (CDM Smith)
21) Draft Geology Report (CDM Smith)
22) Draft Soils Report (CDM Smith)
23) Draft Aesthetics and Visual Resources Report (CDM Smith)
24) Draft Hazardous Sites Report (CDM Smith)
25) Draft Noise Report (CDM Smith)
26) Draft Air Quality Report (CDM Smith)
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Completion at end of budget 0%
Attachment A
WEST will provide statistical support to most of the analyses and ensure the all of the technical
discussions are presented as reader friendly as possible. WEST anticipates completing drafts of
all technical reports they are responsible for, with the exception of the impact analysis
associated with the riparian resources technical report.
Monthly Status Report
The monthly status report for WEST identifies the various sub -tasks that will be completed or
initiated during the identified six-month period. This reportwill be updated by WEST at the end
of the month to reflect the progress of the identified tasks.
Current Budget Request
WEST requests a budget of $411,074 for the scope of work provided above to be completed
over the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
. Draft Programmatic
..
Agreement on Guttural
Resources.
Task 8- Meetings and
adminlstration
96
144
240
$48,720
Subtotal Hours
386
861
581
543
150
82
70
139
440
3,042
Subtotal Labor
$71,410
$74,865
$61.005
$57,015
$15,000
$6,970
$4,900
$10,425
$26,400
$327,990
Reimbursable Expenses
-
-
-
_
$6,809
Phase III Labor and
Ex enses
RASE If AND PHASE III
TOTAL
$411,07
Attachment A
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Phase 11 - Alternative Screeninq and Development
<Provide details here about any problems or unexpected changes — or requests by Corps *or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Phase III - Draft EIS and Supporting Documents
<Provide details here about any problems or unexpected changes — or requests by Corps or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Attachment A
Monthly Status Report
The monthly status report for DiNatale Water identifies the various sub -tasks that will be
completed or initiated during the identified six-month period. This report will be updated by
DiNatale Water at the end of the month to reflect the progress of the identified tasks.
Current Budget Request
DiNatale Water requests a budget of $51,350 for the scope of work provided above to be
completed over the six-month period of August 1, 2012 through January 31, 2013.
Attachment A
DiNatale Water Status Update for HSWSPs — August 2012
Overview
<3-4 sentences that provide: general description of the progress made overall; clearly identify
any area of concern regarding schedule or budget; steps being taken or assigned to resolve any
issues. >
_
t.aet
Task 1 =.
f Stefue'
`:Co Mete+
> Pereent •
' commonte wC'�
Task 2 Identlfleatlon, Screening and
�: o,
.`OfAltBmeUYBBs
An
;�
sF
Sub -Task 2.1 - Draft Chapter 2 (Altematives)
of the EIS
Sub -task 2.2 Revlew of altematives report
written by CDM
Task 3 = Mead ww a and AdmInIatrat ton _ . �� a
x t....? �.z
. � ° . a.. ti
x, ; - _
Documents
Task;1;FP and NeW,Cha ter,f�lrl"
!s',,.
.
Task 78= drat :Stmulatlons Repoft-
Task 8,- Meatings and Adminlstrellon
Details
<Overall state the progress for the headings below. State which tasks cannot be initiated and
why (alternatives not identified or hydrology not available etc)>
Phase II Alternatives Screening and Development
<Provide details here about any problems or unexpected changes — or requests by Corps or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Phase III Draft EIS and Suoportino Documents
<Provide details here about any problems or unexpected changes — or requests by Corps or
Cooperating Agencies that were not anticipated, data not readily available, etc — that will result
in delay or increase costs >
Attachment A
In addition to the modeling report, CDM will assist in developing the Modeling Executive
Summary and Modeling Presentation based on NISP cost estimate (two-thirds to HSWSP and
one-third to NISP).
Monthly Status Report
The monthly status report for CDM Smith identifies the various sub -tasks that will be completed
or initiated during the identified six-month period. This report will be updated by CDM Smith at
the end of the month to reflect the progress of the identified tasks.
CURRENT BUDGET REQUEST
CDM Smith requests a budget of $142,500 for the scope of work provided above to be
completed over the six-month period of August 1, 2012 through January 31, 2013.