Change Order Form
PROJECT TITLE: 2012 CONCRETE MAINT PROJECT
PROJECT NUMBER: 902120 Bid No. 6088
CONTRACTOR: NORTHSTAR CONCRETE (PO No. 9122294)
CHANGE ORDER NUMBER: 1
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will increase by $41,595.71
4. There will be no change in contract time.
ORIGINAL CONTRACT COST $670,842.72
TOTAL APPROVED CHANGE ORDERS $0.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $41,595.71
TOTAL % OF THIS CHANGE ORDER 6,20%
TOTAL C.O. % OF ORIGINAL CONTRACT 6.20%
ADJUSTED CONTRACT COST $712,438.43
(Assuming all change orders approved)
ACCEPTED BY:
SUBMITTED BY:
Representative
Maintenance Program Manager
cc: Purchasing /0 O < 3 D dpp
Accounting
Contractor
Project File
DATE: / I — Z (O ^ 1 L
DATE: 1-CZ 67 f 1
APPLICATION FOR PAYMENT: Transfer Station
NORTHSTAR l2eeS; CO80537
�WCONCRETE INC. :70203:oMhe,
To: City of Fort Collins
Address: 625 Ninth Street
Fort Collins. CO 80524
Contact: Rhonda
Project: Harmony Transfer Station
Period: 9WI2. 10/20/12
Date: 10/25/2012
Scheduled
Total Previous
Balance to
ITEM NO.
WORK ITEMIDESCRIPTION
Value
Change Orders
Applications
THIS APPLICATION
TOTAL TO DATE
Finish
608.04
8- Crosspan
6965.60
$0.00
$965-00
S965.60
$0.00
S7.10 per SF
136 at
0
136
136
6osoa
verliral CBG(no sidewalk)
51,185.75
S0.00
51,185.75
S1,185.75
S0.00
S25.50 per LF -
46.5 ff
0
47
47
608.09
vertical Dullep C&G
S5,989.80
SO.00
S5,969.80
S5.989.80
soon
$22.35 per LF
26811
0
268
268
608.14
Pedestrian Access Ramp
$550.80
Scott
,. lissom
ssm.80
S0.00
$7.65 per SF
72 sl
0
72
72
608.16
Truncated Dome Panel
S640.00
Spot)
- $6410.00
S640.00
50.00
S40.00 per SF
16 sf
0
16
16
608.18
6' Flalwork
$4.519.50
S0.00
$4,519.W
S4,519.50
$0.00
S6.55 per SF
attest
0
690
690
6082
Colored Conc. 4' San Diego Buff (Up Ch.)
S229.60
S0.00
5129.80
$229.60
SO.00
S2.05 pet SF
11261
0
112
112
608.19
1' Additional Depth (Replace Flat• fk)
S4132.56
SO.00
- SZ13255
S2.132.56
Word
S0.76 par SF
2606 6r
0
. 2So6
2806
rids 2
a' Pavement
S10.732.95
50.00
$10,732A5
510,732.95
, ' S0.00
SIAS per SF
1403 of
0
1403 -' .� i. i�
1403
630.01
No Park Sign w/ Stand
S547.50
SO.00
" - - ; " $547.50
$647.50
Scott
S1.50 per EA per Day
365 eartury
0
365 - -` :I
365
630.02
vertical Panel w/out Light
$639.00
S0.00
_ S639Ag
$639.00
S0.00
SO.90 per EA per Day
710 earday
0
710,
710
630.06
Sae A Sign wr Stand
S178.20
S0.00
$17820
$178.20
$0.00
$1.65 Parr EA Per Day
108 eafday
0
-108 - -
108
630.07
Sae B So wr Stand
$69.75
$0.00
' ' �$69.75
$69.75
$0.00
52.25 per EA par Day
31 sa(day
0
r 31
31
630.1
Cone w/ ReflecGre Strip
$554.40
s0.00
.r'"`�" "', S554.40
S554.40
S0.00
$0.60 per EA par Day
924 ea/day
0
•,. 924 1-
924
630.14
Variable Massage Board
$2,600.00
SO.00
+ 82,600.W
$2.600.00
S0.00
S200.00 per EA per Day
13 tralday
0
13'^
13
630.16
Traffic Control Supervisor
S2.400.00
$0.00
.'. 12A00.
$2,400.00
som
S300.00 per DAY
8 day
0
�.-8-. .r. z" 1' '
8
630.17
Flagging
$3,725.00
SO.00
;:": ,; ''. $3,725.00
$3.725.00
S0.00
$25.00 per HR
149 hr
0
149
149
304.01
Aggregate Base Course
S715.50
SOAP
l ST15.50
S715.50
$0.00
$26.50 per Ton
27 ton
0
27.: _' '1' -
27
403.01
Temporary Patching
$990.00
$0.00
�" ^"- - "$990.
$990oo
S0.00
$165.00 per Ton
6 ton
0
6
6
Changes/Additional work
a
Dark Grey Color Up Charge (Bands)
$500.00
SO.00
- - 000.00
S500.00
SO.00
$125.00 perCY
4 cy
0
=.4
4
b
12 Hour Mix Up Charge
$765.00
$0.00
- SM.00
5765.00
SO.00
$45.00 parCY
17 Cy
0
17'
17
c
Tile Red Color Up Charge
S150.00
S0.00
- _ $150.
S150.00
S0.00
575.00 per CY
2 c
0
2.
2
d
Addidonal 2- San Diego Buff Up charge
$114.80
SO.00
'. .. - $114,00
511420
S0.°0
$1.03 per SF
112 sl
0
. 112-'. .. F•�l ,�+
112
e
AddbonalLabor ]or Dark Grey Bands
S700.00
$0.00
"^; 1 6700.00
S700.00
Sa.6o
$700.00 per LS
1 B
TOTALS $39,365.91 $2.229.80 50.00 _ $41595.71
TOTAL COMPLETED TO DATE
LESS RETAINAGE 0%
TOTAL LESS RETAINAGE
LESS PREVIOUSLY APPLIED FOR
CURRENT PAYMENT DUE
$41,595,71 $0.00
$41,595.71
$0.00
$41,595.71
$0.00
$41.595.71