Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7256 HOT APPLIED CHIPSEAL OVERLAY (4)��att of �o-- Planning, Development & Transportation Stree /v�.�o• ■ ■� 625 Njnih Street / Streets P O Box 580 Fan Collins. CO 80522 OSBO 970.221,6615 970.221.6270• fax Change Order Form PROJECT TITLE: 2011 Street Maintenance Program, HACO Program PROJECT NUMBER: ( Bid 57256) CONTRACTOR: A•1 Chipseal (PO #9115122) CHANGE ORDER NUMBER: 3 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. See attached document 2012 Pay Estimate Reconciling CO 3. The contract cost will decrease by $24,019 05 4. There is no change in contract time. ORIGINAL CONTRACT COST $965,651.25 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER ($24,019.05) TOTAL % OF THIS CHANGE ORDER -2.49% TOTAL C.O. % OF ORIGINAL CONTRACT 2.49% ADJUSTED CONTRACT COST $941,632.20 ACCEPTED BY: DATE: 11 /2012012 Contractors Representative APPROVED BY: DATE:4L enance Program Manager cc: Contractor Purchasing Project File N City of Fort Collins 2012 HACO Prciect A-1 Chipseal 2012 Pay Estimate - Reconciling Item No. Description Unit Contract Quantity Unit Costa Contract Cost Actual Quantity Actual Cost a/- OUANTIITY 208.01 Siorniwaier Protection - Rock Sock Wattle LF 0.00 $18.50 S0.00 - $ S 208.02 Stormwuler Protection - Recycled Rubber Waole LF 70.00 $1 RSO $1.295.00 192.00 $ 4.319.96 S 3,024.96 208.03 SIWmWater PIDICC110n Straw BaICr Each 0.00 $25.75 $0.00 33.00 $ 849.75 S 849.75 210.01 Adjust Valve Box Each 1.00 $77,25 S386.25 5.00 $ 386.25 S 210.02 Adjust Valve Box with Tyler 6860 Series, Item R 69. Screw Type Adjusrthle Riscr. Including Pans Each 0.00 SI55.00 $0.00 - $ S 210.03 Adjust Valve Box with Ring Each 10.00 $105.00 $1.050.00 1.00 S 105.00 S (945.00) 210.04 Adjust Manhole with Locking Ring Each 2.00 S140.00 S280.00 1.00 $ 140.(t0 S (I40.00) 409.01 Hot Applied Chipseal Overlay SY 126.000.00 S7.64 S962.640.00 122.491.00 S 935.831.24 S (26.808.76) 630.01 Additional Variable Message Board EA/DAY 0.00 $ - 630.02 Additional Plagging Personnel HR 0.00 - S - S - Original Contract Amount $965,651.25 $ 941,632.20 S (24,019.05) Change Order 1 $ (24,019.05) TOTAL COST $ 941,632.20 $ 941,632.20 $ (24,019.05) NOTES: S:\Slreets\PMP\Common\p.m.p\PROJECTS\2012WACO\Pay EstimatesICONTRACTORS PAY ESTURtWEka1 1