Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7405 TURNBERRY ROAD IMPROVEMENTS PROJECT (2)City Of t Coll i n� Planning, Development.& Transportation Engineering 281 North College Avenue Eng ineeri n P.O. Boxb80 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 -fox Change Order Form PROJECTTITLE: Tumbe" Rd. Improvements PROJECT NUMBER: 400901718 (Bid #7405) CONTRACTOR: Connell Resouces, Inc. (PO #9124395) CHANGE ORDER NUMBER: 3 n preparing -change rderssslow in order as separate numnerea paragrapns me touowmg: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $51,459.40 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: c. -REVIEWED BY: 'SUBMITTED BY: 2.21 % 1.54% $2,329,248.20 ($15,687.00) $0.00 $51,459.40 $2,365,020.60 DATE: it / 4 f ( Z DATE: ' I Tt 1 1 APPROVED BY: O" DATE: *(Department Head) APPROVED BY: DATE: (Purchasing Agent over $80,000) cc: Contractor Purchasing Project He CHANGE ORDER 3 Turnberry Road Improvement Project SUMMARY OF WORK Itnm If eem nuantity Unit . 3/Unit Total 7 Subgrade Prep 1560 SY 1.5 $ 2,340.00 2 Fly -ash Mobilization 1 EA $ 2,800.00 $ 2,800.00 3 Fly -ash Treated Subgrade 12% 4430 SY $ 8.60 $ 38,098.00 4 Unclassified Excavation 407 CY $ 5.30 $ 2,157.10 5 Embankment 407 CY 1 $ 2.20 $ 895.40 6 1 Haul off material and haul in material 814 CY 1 $ 6.35 $ 5.168.90 TOTAL REASON FOR CHANGE Soft Subgrade repairs between Mainsail and Brightwater Drive WHEN POSTED Posted to Pay App #3 $51,459.40