HomeMy WebLinkAbout222075 BURLINGTON NORTHERN & SANTA FE - CONTRACT - PURCHASE ORDER - 9125830al l z 03D
CROSSING SURFACE INSTALLATION AGREEMENT
BNSF File No.: BF10003218
Mile Post 77.16
Line Segment 476
U.S. DOT Number 244647X
Front Range Subdivision
This Crossing Surface Installation Agreement (hereinafter called, this "Agreement") is entered
into effective as of 06/30/2012 by and between the City of Fort Collins (hereinafter called, "Agency") and
BNSF RAILWAY COMPANY (hereinafter called, the "Company").
WHEREAS, Company operates a freight transportation system by rail with operations throughout
the United States and Canada; and
WHEREAS, Agency and Company desire to replace the existing crossing surface at
Timberline/Summitview with a new concrete crossing surface;
NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties
contained herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as
follows:
1. Company Work. The Company will install a new concrete crossing surface for a width
of 56 feet from the edge of the pavement on the North side of the tracks to the edge of the pavement on
the South side of the tracks. The new crossing surface will adequately cover all vehicular driving lanes at
Timberline/Summitview. The Company will perform all necessary track upgrades to accommodate the
new crossing surface.
2. Payment: Invoicing. Upon execution of this Agreement by both parties hereto,
Company will send Agency an invoice detailing the total amount owed by Agency for the new crossing
surface. Company shall send to Agency a final invoice upon completion and Agency shall pay the final
invoice within 30 days of receipt.
Agency agrees to pay Company fifty percent (50%) of the total cost for the replacement of the new
crossing surface. Project is estimated to cost One Hundred Thirty Five Thousand Twenty One and No/100
Dollars ($135,021.00) for the new crossing surface. Agency's ESTIMATED total cost for the new
crossing surface is Sixty Seven Five Hundred Ten and No/100 Dollars ($67,510.00).
3. Maintenance of the Crossing Surface. After installation of the new crossing surface is
completed, the Company will maintain, at its own cost and expense, the crossing surface, against normal
wear and tear, in a satisfactory manner for the expected life of the crossing surface. Notwithstanding the
preceding sentence, the Company shall be entitled to receive any contribution toward the cost of such
maintenance made available by reason of any existing or future laws, ordinances, regulations, orders,
grants, or other means or sources.
4. Vehicular Traffic during Installation. The Agency shall provide, at its own cost and
expense, all necessary barricades, lights or traffic control devices for detouring vehicular traffic at the
Timberline/Summitview crossing during installation of the new crossing surface.
5. Drainage. The Agency agrees to allow the Company to drain water from the
Timberline/Summitview crossing area into existing Agency storm sewers, if such storm sewers are
available. Drain pipes and filter fabric necessary for such drainage will be furnished and installed by the
Company.
6. Term. This Agreement begins on the effective date set forth above and remains in effect
until completion of all work contemplated in this Agreement and Agency's payment of the amounts set
forth in Section 2 above.
IN WITNESS WHEREOF; the parties hereto have caused this Agreement to be executed and
attested by its duly qualified and authorized officials as of the day and year first written above.
COMPANY:
BNSF RAILWAY COMPANY:
By:
Printed Name:
Title:
AGENCY:
CITY OF FORT COLLINS OL DO
By: 1;�, 4 1 V
Printed Name:
Title:
Approved o F m
Deputy City MEMO'
-----------------------------------------------------------------------------------------------------------------------
xxxxx MAINTAIN PROPRIETARY CONFIDENTIALITY +****
-----------------------------------------------------------------------------------------------------------------------
BNSF RAILWAY COMPANY
FHPM ESTIMATE FOR
CITY OF FORT COLLINS
-----------------------------------------------------------------------------_-_-_-___-__------_----------_--.
LOCATION:- NSS NORTH YARD DETAILS OF ESTIMATE PLAN ITEM: PTR244647X VERSION: 3
------------------------------------------------------------------------__-----_-_--------------_____-__-__-_.
PURPOSE, JUSTIFICATION AND DESCRIPTION
PIP CO DIV FRONT RANGE SUB LS 476 MP 77.16 SUMMIT VIEW FT. COLLINS, CO DOT4244647X
REHABILITATE TIMBERLINE 0 SUMMIT VIEW CROSSING , FORT COLLINS, CO - SHEET 1 OF 2
BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO:
50% BILLABLE TO CITY OF FORT COLLINS
MAINTAIN PROPRIETARY CONFIDENTIALITY
THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED
BY LINE SEGMENT, MILE
POST RANGES, A
D IN SOME CASES TRACK NUMBER. THIS IS THE PRIMARY
AREA FOR THE PROJECT. THERE WILL BE CAS
S WHERE WORK MAY OCCUR BEYOND THE DEFINED
LIMITS. PROJECTS THAT INCLUDE SIGNAL, ELECTRICAL,
OR TELECOMMUNICATION EQUIPMENT MAY REQUI
E ACTIVITY BEYOND THESE DEFINED TRACK LIMITS. ALL
OR PORTIONS
OF
SOME PROJECTS MAY OCCUR
N AREAS WHERE NO MILEPOST SIGNS EXIST
SUCH AS YARDS. THIS ESTIMATE IS GOOD FOR 90 DAYS.
THEREAFTER
THE
ESTIMATE IS SUBJECT
TO CHANGE IN COST FOR LABOR, MATERIAL, AND
OVERHEAD.
DESCRIPTION
QUANTITY
U/M
COST TOTAL $
r xxxxxxxxx
LABOR
PLACE FIELD WELDS - CAP
80.0
MH
1,919
REPLACE PUBLIC CROSSING - TOTAL REHAB
112.0
MH
2,392
SIGNAL FIELD LABOR - CAP
19.0
MH
500
SURFACE TRACK - REPLACEMENT - CAP
24.0
MH
582
UNLOAD BALLAST - REPLACEMENT - CAP
12.0
MH
257
UNLOAD CROSSING MATERIAL - PUBLIC - CAP
28.0
MH
598
PAYROLL ASSOCIATED COSTS
3,778
DA OVERHEADS
5,671
EQUIPMENT EXPENSES
3,674
INSURANCE EXPENSES
981
TOTAL LABOR COST
-----------
-----------
20,352
20,352
x«r#«rr+«r
MATERIAL
BALLAST-PEDERNAL
200.0
NT
** 1,611
CLIP, PANDROL, NO. E-2055 (FOR ALL WEIGHTS RA
40.0
EA
72
TRACK PANEL, 136 STANDARD RAIL, 80 FT - 10 FT
1.0
EA
**11,607
RAIL, TRANSN,LH,25 FT, 136-1/4 WORN 115
2.0
EA
2,546
RAIL, TRANSN,R14,25 FT, 136-1/4 WORN 115
2.0
EA
2,546
SPIKE, TER SCREW 3/4"X13', F/ROAD XING
196.0
EA
441
TIE, TRK,10FT,PRE-PLATED, PANDROL, 6IN, ROUND
10.0
EA
** 1,303
WELDKIT, GENERIC FOR ALL RAIL WEIGHTS
10.0
KT
695
CONC 136 08-SEC {PITH FILLER FOR 10' WOOD TIES
56.0
FT
8,932
CONCRETE XING RAMP AND PANEL RESTRAINT, COMPL
1.0
ST
257
SIGNAL MATERIAL
2.3
DAY
403
MATERIAL HANDLING
1,516
ONLINE TRANSPORTATION
3,120
USE TAX
2,039
OFFLINE TRANSPORTATION
343
TOTAL MATERIAL COST
37,431
37,431
OTHER
xrr«xxrrrx
LEASED EQUIPMENT WITH OPERATOR
2.3
DAY
3,451
TOTAL OTHER ITEMS COST
-----------
-----------
3,450
3,450
PROJECT SUBTOTAL
61,233
TOTAL BILLABLE COST
CONTINGENCIES
BILL PREPARATION FEE
GROSS PROJECT COST
LESS COST PAID BY BNSF
CEPS PLAN ITEM DOCUMENT
6,039
673
67,945
33,973
33,972
-----------------------------------------------------------------------------------------------------------------------
***** MAINTAIN PROPRIETARY CONFIDENTIALITY *****
-----------------------------------------------------------------------------------------------------------------------
BNSF RAILWAY COMPANY
FHPM ESTIMATE FOR
CITY OF FORT COLLINS
----------------------------------------------------------- -----------------------------------------------
LOCATION:- NSS NORTH YARD DETAILS OF ESTIMATE PLAN ITEM: PTR244647XOI VERSION: 2
----------------------------------------------------------------------------------------------------------------------------
PURPOSE, JUSTIFICATION AND DESCRIPTION
PIP CO DIV FRONT RANGE SUB LS 476 MP 77.16 SUMMIT VIEW FT. COLLINS, CO DOTH244647X
REHABILITATE TIMBERLINE 0 SUMMIT VIEW CROSSING , FORT COLLINS, CO - SHEET 2 OF 2
BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO:
50% BILLABLE TO CITY OF FORT COLLINS
MAINTAIN PROPRIETARY CONFIDENTIALITY
THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED
BY LINE SEGMENT, MILE
POST RANGES, A
D IN SOME CASES TRACK NUMBER. THIS IS THE PRIMARY
AREA FOR THE
PROJECT. THERE WILL BE CAS
S WHERE WORK MAY OCCUR BEYOND THE DEFINED
LIMITS. PROJECTS THAT INCLUDE SIGNAL, ELECTRICAL,
OR TELECOMMUNICATION EQUIPMENT MAY REQUI
E ACTIVITY BEYOND THESE DEFINED TRACK LIMITS. ALL
OR PORTIONS OF
SOME PROJECTS MAY OCCUR
N AREAS WHERE NO MILEPOST SIGNS EXIST
SUCH AS YARDS. THIS ESTIMATE IS GOOD FOR 90 DAYS.
THEREAFTER
THE
ESTIMATE IS SUBJECT
TO CHANGE IN COST FOR LABOR, MATERIAL, AND
OVERHEAD.
DESCRIPTION
---------------------------------------------
QUANTITY
--------
U/M
-----
-----------------
COST TOTAL $
-----------
LABOR
PLACE FIELD WELDS - CAP
80.0
MH
1,919
REPLACE PUBLIC CROSSING - TOTAL REHAB
112.0
MH
2,392
SIGNAL FIELD LABOR - CAP
19.0
MH
500
SURFACE TRACK - REPLACEMENT - CAP
24.0
MH
582
UNLOAD BALLAST - REPLACEMENT - CAP
12.0
MH
257
UNLOAD CROSSING MATERIAL - PUBLIC - CAP
28.0
MH
598
PAYROLL ASSOCIATED COSTS
3,778
DA OVERHEADS
5,671
EQUIPMENT EXPENSES
3,674
INSURANCE EXPENSES
981
TOTAL LABOR COST
-----------
-----------
20,352
20,352
MATERIAL
s ++fffr+rx
BALLAST-PEDERNAL
200.0
NT
** 1,611
CLIP, PANDROL, NO. E-2055 (FOR ALL WEIGHTS RA
40.0
EA
72
TRACK PANEL, 136 STANDARD RAIL, 80 FT - 10 FT
1.0
EA
**11,607
RAIL, TRANSN,115/115, 1/4 WORN
4.0
EA
4,400
SPIKE, TBR SCREW 3/4"X13", F/ROAD XING
196.0
EA
441
TIE, TRK,IOFT,PRE-PLATED, PANDROL, 6IN, ROUND
10.0
EA
** 1,303
WELDKIT, GENERIC FOR ALL HAIL WEIGHTS
10.0
KT
695
CONC 136 08-SEC WITH FILLER FOR 10' WOOD TIES
56.0
FT
8,932
CONCRETE XING RAMP AND PANEL RESTRAINT, COMPL
1.0
ST
257
SIGNAL MATERIAL
2.3
DAY
403
MATERIAL HANDLING
1,482
ONLINE TRANSPORTATION
3,120
USE TAX
1,992
OFFLINE TRANSPORTATION
334
TOTAL MATERIAL COST
36,649
36,649
OTHER
LEASED EQUIPMENT WITH OPERATOR
2.3
DAY
3,410
TOTAL OTHER ITEMS COST
-----------
-----------
3,450
3,450
PROJECT SUBTOTAL
60,451
CONTINGENCIES
5,960
BILL PREPARATION FEE
GROSS PROJECT COST
LESS COST PAID BY BNSF
TOTAL BILLABLE COST
665
67,076
33,538
_____
33,538