Loading...
HomeMy WebLinkAboutBID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTS (2)ADDENDUM No. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7434: Reservoir Ridge Natural Area Improvements OPENING DATE: 3:00 PM (Our Clock) October 10, 2012 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed as follows: • Any questions regarding Bid #7434 must be submitted to Project Manager, Matt Day via email (mday@fcgov.com) before 5:00 PM on October 1, 2012. • Revisions 1. Revision: 00300 Bid Schedule a. See attached revised Bid Schedule 2. Revision: 00300 Supplemental Unit Prices a. See attached revised Supplemental Unit Prices 3. Revision: 01800 Definition of Bid Items a. See attached revised Definition of Bid Items Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Section 00300 Project: Reservoir Ridge Improvements BID SCHEDULE (BASE BID) BID ESTIMATED UNIT ITEM ITEM # DESCRIPTION QUANTITY UNIT PRICE TOTAL 1 Mobilization 1 LS 2 Erosion Control 1 LS 3 Demolition 1 LS 4 Topsoil Remove/Replace 2,000 CY 5 Unclassified Excavation 1,500 CY 6 Import Clean Fill 1,210 CY 7 Colored Concrete Paving - 5" Thick 997 SF 8 Colored Concrete Paving - 6" Thick 556 SF 9 Recycled Asphalt Trail 4" Thick 448 TON 10 Recycled Asphalt Parking Area and Entrance Road 6" Thick 837 TON 11 Asphaltic Concrete Entrance Apron 6" Thick 132 TON 12 8" CMP storm culvert at 8' trail 10 LF 13 18" RCP (FES included in length) 172 LF 14 18" Concrete Flared End Section 8 EA 15 Type L Rip Rap (includes 6" type III bedding) 216 SF 16 Pedestrian Bridge Abutments (helical pier system) 1 LS 17 55 foot Pedestrian Prefabricated Bridge 1 EA 18 Landscape Restoration 57,925 SF 19 Landscape Plantings 47 EA 20 CXT Vault Toilet "Gunnison" 1 LS 21 Site Furnishings 1 LS 22 Fencing 2,181 LF (Total Base Bid Written) TOTAL OF BASE BID Bid items are described in Section 01800 Reservoir Ridge Natural Area SECTION 00300 – BID SCHEDULE Page 1 of 2 UNIT PRICES For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required labor, materials, permits, equipment, implements, testing, parts and supplies necessary for, and incidental to proper installation, as indicated on the Drawings, and in the Specifications. A. The Contractor agrees that for requested and/or required changes in the scope of work, the Contract Sum shall be adjusted in accordance with the following unit prices, where the Owner elects to use this method of determining costs. B. The Contractor is advised that the unit prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. C. Unit prices for irrigation shall include pipe, fittings, valves, concrete thrust block and stabilizers and any other items shown on the Drawings, as described in the Specifications or recommended by the manufacturer as part of the installation. D. The unit prices quoted by the Contractor shall be those unit prices that will be charged or credited for labor and materials to be provided regardless of the total number of units and/or amount of labor required for added or deleted items of work. DEMOLITION ITEM UNIT PRICE Demo – Asphalt Saw Cutting $___________________LF Tree removal $___________________EA Fence removal $___________________LF EARTHWORK AND UTILITIES ITEM UNIT PRICE Imported Topsoil $___________________CY Imported Clean Fill $___________________CY Earthwork - Cut and Stockpiling $___________________CY Earthwork – Fill $___________________CY Imported Structural Fill $___________________CY Import Class 5/6 ABC $___________________CY Topsoil Stripping and Stockpiling $___________________CY Topsoil Spreading and Placement $___________________CY Rip Rap- Type L $___________________TON Storm Sewer – 18” RCP $___________________LF Storm Sewer – 18” Flared End Section $___________________EA Storm Sewer – 8” CMP Storm Pipe $___________________LF Erosion Control – Earthen Berm $___________________LF Erosion Control – Wattle Protection $___________________EA Reservoir Ridge Natural Area SECTION 00300 – BID SCHEDULE Page 2 of 2 HARDSCAPE ITEM UNIT PRICE Integral Color Concrete Pavement (5” thick) $___________________SF Integral Color Concrete Pavement (6” thick) $___________________SF Recycled Asphalt $___________________TON LANDSCAPE ITEM UNIT PRICE Finish Grading $___________________SF Organic Amendment $___________________CY Dryland Turf Seeding $___________________SF Deciduous Shrub – 5 gal $___________________EA Weed Barrier $___________________SF City Supplied Mulch – Installation Only $___________________SF SITE FURNISHINGS ITEM UNIT PRICE Bike Rack $___________________EA END OF SECTION City of Fort Collins Section 01800 - Definition of Bid Items Park Planning & Development Division Page 1 of 3 DIVISION 1 SECTION 01800 – DEFINITION OF BID ITEMS The following items describe the scope of work for this contract and are further clarified through limit-of-work lines, notes on the drawings and specifications. The work described in each Bid Item may contain work from one or several technical specifications sections. Contractor shall refer to the technical specifications that apply to the individual components. Bid Items 1 – Mobilization This work includes the mobilization of personnel, equipment and supplies at the project site(s) in preparation for work on the project, as well as the establishment of the Contractor’s office, buildings and other necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall also include marshalling, disassembly and security of all items indicated on the plans or specifications. Payment will be made as Work progresses. The total amount for mobilization shall not exceed five percent (5%) of the total bid. Bid Items 2 – Erosion Control Contractor shall install and maintain erosion control items during construction in accordance with the Drawings and Specifications. Bid Item includes contractor responsible for obtaining State of Colorado permit for storm water discharges as noted on drawings. Bid Item 3 – Demolition Contractor shall furnish all labor, materials and equipment to clear and grub within the limits of work. Bid item includes removal and recycling of existing fence along Overland Trail. Bid amount includes all labor, material and equipment for a complete item in accordance with the Drawings and Specifications. Any trees slated for removal to be approved by owner prior to removal. Bid Item 4 – Topsoil Remove/Replace Contractor shall furnish all labor, materials and equipment to strip, stock, distribute, rough grade, and fine grade (4” thick) topsoil from limits of grading. Bid amount includes all labor, material and equipment for a complete item in accordance with the Drawings and Specifications. Bid Item 5 – Unclassified Excavation Contractor shall furnish all labor, materials and equipment for site excavation including stockpiling, distribution, removal of debris and haul and disposing of all excess material per Drawings and Specifications. Bid Item 6 – Clean Import Fill - (C.I.P.) The unit price for this item shall include supplying, placing, and compacting clean fill in accordance with the Drawings and Specifications or as otherwise directed by the ENGINEER. Measurement and payment for this item will be by the CY of actual yardage placed, complete at proper moisture. The method to bring mixture to optimum moisture will not be measured or paid for separately, but shall be included in the unit price for this item. Imported soil to be free of rocks and organic material no greater than 3” in diameter, moisture treated and compacted to 95% proctor. Bid Items 7 – Colored Concrete Paving – 5” Thick Contractor shall furnish all labor, materials and equipment to install concrete paving in accordance with the Drawings and Specifications. The unit price includes sub-grade preparation which consists of ripping soil to 8” and re-compacting to 95% proctor, installation of 5” thick (4,000 psi) standard concrete with fiber mesh reinforcement, and integral color additive equaling 2 lbs. per sack of Yosemite Brown color, forming; furnishing and applying curing compounds; finishing and edging the concrete surfaces; joints and joint materials; compacting sub grade as required for preparation of a stable sub base; and all other related and necessary materials, work, and equipment required to construct the flatwork areas in accordance with the Drawings and Specifications. City of Fort Collins Section 01800 - Definition of Bid Items Park Planning & Development Division Page 2 of 3 Bid Items 8 – Colored Concrete Paving – 6” Thick (parking stall) Contractor shall furnish all labor, materials and equipment to install concrete paving in accordance with the Drawings and Specifications. The unit price includes sub-grade preparation which consists of ripping soil to 8” and re-compacting to 95% proctor, installation of 6” thick (4,000 psi) standard concrete with fiber mesh reinforcement, and integral color additive equaling 2 lbs. per sack of Yosemite Brown color, forming; furnishing and applying curing compounds; finishing and edging the concrete surfaces; joints and joint materials; compacting as required for preparation of a stable sub base; and all other related and necessary materials, work, and equipment required to construct the flatwork areas in accordance with the Drawings and Specifications. Bid Items 9 – Recycled Asphalt Trail – 4” Thick Contractor shall furnish all labor, materials and equipment to install recycled asphalt paving in accordance with the Drawings and Specifications. The unit price includes sub-grade preparation which consists of ripping soil to 8” and re-compacting to 95% proctor, installation of 4” thick recycled asphalt; compacting sub grade as required for preparation of a stable sub base; and all other related and necessary materials, work, and equipment required to construct the trail in accordance with the Drawings and Specifications. Bid Items 10 – Recycled Asphalt Parking Area and Entrance Road – 6” Thick Contractor shall furnish all labor, materials and equipment to install recycled asphalt paving in accordance with the Drawings and Specifications. The unit price includes sub-grade preparation which consists of ripping soil to 8” and re-compacting to 95% proctor, installation of 6” thick recycled asphalt; compacting sub grade as required for preparation of a stable sub base; and all other related and necessary materials, work, and equipment required to construct the trail in accordance with the Drawings and Specifications. Bid Item 11 – Asphaltic Concrete Entrance Apron 6” Thick Contractor shall furnish all labor, materials and equipment to install asphaltic concrete paving in accordance with the Drawings and Specifications. The unit price includes sub-grade preparation which consists of ripping soil to 8” and re-compacting to 95% proctor, installation of 6” thick asphaltic concrete, compacting sub grade as required for preparation of a stable sub base; and all other related and necessary materials, work, and equipment required to construct the entrance apron in accordance with the Drawings and Specifications. Bid Item 12 – 8" CMP Storm Culvert Contractor shall furnish all labor, materials and equipment to install 8” CMP under the proposed 8’ wide trail per City of Fort Collins standard and specification in the location shown on the drawing. Bid item includes concrete headwalls and bedding per detail and specifications. Bid Item 13 – 18" RCP Culvert (C.I.P.) Contractor shall furnish all labor, materials and equipment to install 18” RCP in the locations shown on the drawings. Work includes bedding pipe per detail. Bid Item 14 – Concrete Flared End Section Contractor shall furnish all labor, materials and equipment to install concrete flared end sections for the 18” RCP per City of Fort Collins standard and specification in the locations shown on the drawings. Bid Item 15 – Type L Rip Rap Contractor shall furnish all labor, materials and equipment to construct rip rap protection in accordance to the drawings and specifications. Work includes 6” type III bedding under rip rap. Bid Item 16 – Pedestrian Bridge Abutment w/ Helix Pier System Contractor shall furnish all labor, materials and equipment to construct a helical pier bridge abutment for the pedestrian bridge in accordance to the drawings and specifications. City of Fort Collins Section 01800 - Definition of Bid Items Park Planning & Development Division Page 3 of 3 Bid Item 17 – 55 Foot Pedestrian Prefabricated Bridge Contractor shall furnish all labor, materials and equipment to install 1 (one) 10’ wide by 55’ long pedestrian bridge in accordance to the drawings and specifications. Bridge Bid item includes contractor obtaining Larimer County building permit and Pleasant Valley Ditch Company ditch crossing permit. Bid Items 18 – Landscape Restoration Contractor shall provide all soil preparation; fine grading; fertilizer; herbicide; seed; labor; hydro-mulching and equipment to drill seed any area disturbed during construction in accordance with the Drawings and Specifications. Bid Items 19 – Landscape Plantings Contractor shall provide all soil preparation; fine grading; fertilizer; herbicide; plant material, mulch; labor; and equipment to landscape per the Drawings and Specifications. Bid Items 20 – Vault Toilet “CXT Gunnison – left hand” Contractor shall furnish all labor, materials and equipment to furnish and install CXT vault toilet “Gunnison” per the manufacturer’s drawings and specifications. Bid item is for a complete in place vault toilet, includes excavation and structural backfill per CXT drawings and specifications. Bid Item includes contractor obtaining Larimer County building permit. Shop drawings required. Bid item 21 Site Furnishings Contractor shall furnish all labor, materials and equipment to install 4 (four) 12’ Priefert D-gates. Entrance set of Two (2) gates will require Apollo 1650 ETL Smart ETL Dual Swing Gate Operator package (package includes; operator, solar charger, transmitter, wireless keypad, wiring and photo eye). Bid item includes all labor, materials and equipment to furnish and install wave bike rack; 7 bike capacity, beige, surface mount, Barco Products, #GR6806. Bid Items 22 – Fencing Contractor shall furnish all labor, materials and equipment to install 2,181 lf of single rail fence in accordance with the Drawings and Specifications. END OF SECTION END OF DIVISION 1