HomeMy WebLinkAboutBID - 7434 RESERVOIR RIDGE NATURAL AREA IMPROVEMENTSADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7434: Reservoir Ridge Natural Area Improvements
OPENING DATE: 3:00 PM (Our Clock) October 10, 2012
To all prospective bidders under the specifications and contract documents described
above, the following changes/additions are hereby made and detailed as follows:
Any questions regarding Bid #7434 must be submitted to Project Manager,
Matt Day via email (mday@fcgov.com) before 5:00 PM on October 1, 2012.
Clarifications & Revisions
1. Clarification: Sheet 6 Bridge Plan and Profile
a. The contractor is responsible for grading the trail approach as shown. The
note “trail approach by owner” refers only to the installation of the surface
material for the trail.
2. Clarification: Sheet 10 Landscape Plan
a. Add note: The contractor is responsible for the plant material warranty.
City of Fort Collins Natural Areas is responsible for watering plant material
after Final Acceptance.
3. Revision: Sheet 3 Overall Trail Layout
a. Revised detail: Trail low point typical section, see attached revised sheet 3.
4. Revision: Sheet 8 Construction Details
a. Add storm water bedding detail, see attached revised sheet 8.
Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with
any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 1 - 7434 Reservoir Ridge Natural Area Improvements Page 1 of 3
Addendum 1 - 7434 Reservoir Ridge Natural Area Improvements Page 2 of 3
Addendum 1 - 7434 Reservoir Ridge Natural Area Improvements Page 3 of 3