PROJECT TITLE:
CONTRACTOR:
P.O. NUMBER:
CHARGE NUMBER:
DESCRIPTION:
RECONCILIATION CHANGE ORDER NO. C-1
2012 Manhole Lining
Garvey Construction
9122298
5036410079.521370.6
1. Reason for change.
3. Change in contract cost.
2. Description of change.
4. Change in contract time
1. Schedule of Values used Unit Pricing and project is being constructed using Time and Materials
pricing, resulting in savings.
2. Primary savings from adjusted manhole depths.
3. Decrease Contract Cost by <$3,937.60>.
4. No adjustment to Contract Times.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS CO:
TOTAL % OF ORIGINAL CONTRACT, ALL CO'S:
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
APPROVED BY:
APPROVED BY:
Water Engineering and Field Operations Manager
-10.9%
-10.9%
$36,283.60
$0.00
$0.00
($3,937.60)
$32,346.00
DATE: 7i2D' 1-7
DATE: OV 2 $ L
DATE:
DATE:
CC: Project file Purchasing NOTE: Signature of Contractor indicates
Contractor agreement herewithin, including any adjustment
in contract sum or contract time.
I:Eng/pmmanual/general/forms/change order form
PROJECT: 2012 MANHOLE LINING City of
RECONCILIATION CHANGE ORDER #C-1 SUMMARY Fort Collins qA:j:rnejrIK.TNNJ
- a
6/27/2012 Operations
SCHEDULE OF VALUES
ACTUALLY INSTALLED
ITEM NUMBER
DESCRIPTION
QUANTITY
UOM
UNIT COST
COST
TOTAL
DIFFERENCE
ITEM NUMBER
1
Mobilization & Field Overhead
1
LS
$ 2,600.00
$2,600.00
$2,600.00
$0.00
1
2
Traffic Control
1
LS
-
$0.00
$0.00
2
3
Vac -Truck, Water & Debris Disposal
1
LS
-
$0.00
$0.00
3
4
Manhole #1 - ID 15916
9.1
VF
214.00
$1,947.40
$1,819.00
($128.40)
4
5
Manhole #2 - ID 15938
10.2
VF
214.00
$2,182.80
$2,033.00
($149.80)
5
6
Manhole #3 - ID 11985
8.2
VF
214.00
$1,754.80
$1,712.00
($42.80)
6
7
Manhole #4- ID 11509
6.2
VF
214.00
$1,326.80
$1,177.00
($149.80)
7
8
Manhole #5 - ID 18351
5.3
VF
214.00
$1,134.20
$856.00
($278.20)
8
9
Manhole #6 - ID 11505
4.0
VF
214.00
$856.00
$749.00
($107.00)
9
10
Manhole #7 - ID 12424
9.4
VF
214.00
$2,011.60
$1,926.00
($85.60)
10
11
Manhole #8 - ID 16462
8.0
VF
214.00
$1,712.00
$1,498.00
($214.00)
11
12
Manhole #9 - ID 13968
4.9
VF
214.00
$1,048.60
$856.00
($192.60)
12
13
Manhole #10 - ID 19928
12.6
VF
214.00
$2,696.40
$2,782.00
$85.60
13
14
Manhole #11 - ID 19929
11.8
VF
214.00
$2,525.20
$2,354.00
($171.20)
14
15
Manhole #12 - ID 19930
11.4
VF
214.00
$2,439.60
$2,461.00
$21.40
15
16
Manhole #13 - ID 11830
13.3
VF
214.00
$2,846.20
$2,782.00
($64.20)
16
17
Manhole #14 - ID 18380
5.0
VF
214.00
$1,070.00
$963.00
($107.00)
17
18
Manhole #15- ID 14914
6.0
VF
214.00
$1,284.00
$1,177.00
($107.00)
18
19
Manhole #16 - ID 18272
11.2
VF
214.00
$2,396.80
$2,354.00
($42.80)
19
20
Manhole #17 - Sheely Manhole DI 13979
10.8
VF
214.00
$2,311.20
$2,247.00
($64.20)
20
21
Manole Depth Contingency
10.0
VF
214.00
$2,140.00
$0.00
($2,140.00)
21
TOTALS $36,283.60 $32,346.00 ($3,937.60)