Change Order Form
PROJECTTITLE; Linden St. Improvements, Streelscaps Project
PROJECT NUMBER: 400903707.6 (Bid #7244)
CONTRACTOR: American Civil Constructors (PO#9114195)
CHANGE ORDER NUMBER: 4
n prepay ng change or ed rs show in order as separate numbered paragrapns me rouowmg;
1. Reason for change. 2. Description of change.
3, Change in contract cost. 4. Change in contract time,
1 &2. See attached sheet for detail.
3. The contract cost will decrease by $ (98,779.48)
4. - There will be no change In contract time.
ORIGINAL CONTRACT COST
$1,692,190.90
TOTAL APPROVED CHANGE ORDERS
($183,088.97)
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
(096,779.48)
TOTAL % OF THIS CHANGE ORDER
-6.72%
TOTAL C,O, % OF ORIGINAL CONTRACT
-16.54%
ADJUSTED CONTRACT COST
$1,412,322.45
(Assuming all change orders approved)
qq
ACCEPTED BY: 6v+^+
(Contractor's Repres ntatj
2221'+!-- DATE;
REVIEWED BY: 7L —
(Engineer)
11 1 7
DATE: 1 L C 01 Z
-SUBMITTED BY:
(Project Managar
I
DATE: L"L
APPROVED BY: o2i
DATE:
APPROVED BY: __ DAIE;
(Purchasing Agent over $60,000)
cc: Conlraclor
Purohnaing
Project File
I
CHANGE ORDER
Linden Streetacape Project
SUMMARY OF WORK
Item# item Quanti unit $/Unit Total
Reconcile Change Order LS 1 $ 96,779.48 $ 96,779.48
TOTAL
REASON FOR CHANGE
Adjustment to Plan Quanitities to balance the contract - see attached spreadsheet
WHEN POSTED
Posted to Pay App #6
($96,779.48)
CITY OF FORT COLL/NS
LINDEN STREET SMEETSCAPS DESIGN
ITEM NO.
DESCRIPTION
UNIT
PLAN
QUANTITY
REVISED
QUANTITY
UNIT PRICE
TOTAL COST
Total Quantity
To Data
Total Paid To
Date
%Compkte
Over -Run /
Under -run
Over -Run l Under -Run Description
M40M
CIndM and Grut,binq
LS
1
S 4000.00
S 4,con .no
1.00
S 4.D00.00
100.D0%
S
202-M26
Removal of Slope and OHM Paving
BY
12
S 8.30
S 265.60
37.30
S 309.59
116.56%
$ 43.99
Measured Quantity Exceeded plan Quantity
202-MO
Removal of PI a Bollard
EACHI
7
S MW
S 490.00
18.00
S 1.120.001
228.S7%
S 630.00
Measured Quantity F=eedetl plan Quantity
202-MI56
Romoval of Plater Wall S ial Planter Box)
SF
658
1 S 3,00
$ 1,968.00
1 656.00
$ 1,968.00
100.00%
S
2024MM
Removal of Wall (ElBunt.)IS'.1-ri
SF
80
$ 3.00
S 240.M
125.00
$ 375.00
156.25%
S 135.00
Memled Quantity Exceeded plan Ouarafty
202-00203
Removal of Cub and Gutter
LF
SSD
It 6.00
$ 3.354.00
709A0
5 4,254.00
128.83%
S 900.00
Measured Quantity Exceeded plan Quantity
202-00200
Removal of Sklevalk
SY
BOa
S 13.00
S 7,917.00
574.1a
S 7,464.34
94.28%
S 452,66
Measured OvanIlly less than plan Quantity
202.00209
lRemoval of 6idevalk S ecle - Metal Sidevalk UndeNmin
EACH
1
$ $00.00
$ 800.00
1.00
$ 800.00
100.00°A
S
Z0240210
Removal of Concrete Pavement
SV
52
S 27.00
S 1,40400
252.50
$ 6.817.511
485M%1
S 5.413.50
Measured Quantity Emcedetl Nan Quantity
202-00220
Removal of As all Mal 6-de h
SY
2421.4
2421.4
$ 12.00
S 2905B.80
2421.40
S 29.056.80
100.001
20240610
Removal of Railroad Track
LF
x
5 12.00
S 432.00
W.00
S 432.0D
100.00%
S
20241M
Removal of Fence
LF
422
S 4.00
S 1,6B8.00
3a9,00
S 1.552.00
91.94%
$ 136.00
Measured Quantity lesstlun plan Quantity
203-00000
Unclassified Excavation
CY
3900
3000
$ 19.35
S 7$,465.00
3000.00
S 75,465.00
100.00%
$
203-MOO
Muck Excavation
CV
M.9
1 65..
$ 47.641
S 3,140.14
65.90
S 3140.14
100.00%
$
203-01596
PoMollact v1th Surveying and StalicnIng of U/G Utilities
LS
1
1
5 8.600.00
5 8.600.00
1.D0
S 8,6D0.00
100.00%
S
206A0065
$tftlatare Backfill (F.fiIII
CY
M
33
S 125.00
S 4,125.00
33.00
S 4.125.00
100.00%
S
2011-00002
Eiesla^ 21ncn
LF
100
5 am
5 SM.00
0.00
$
0.00%
3 00,00
Initalle0 py Olnem
ZOR-00011
Eroslon Bales eed Free)
EACH
18
$ 30.00
$ 540.00
0.00
S
0.00%
$ (540.0011
lWalled by Others
201140020
ISM Pence
LF
120
S 2.80
S 338.00
87.00
9 243.e0
72.50%
S 92.40
Measured Quanta, loss than rlan O.rntity
2094004$
Concrete Washout 6tlumum
EACH
1
$ 38MO0
S 380.00
1.00
$ 330.00
100.00%
5
202-00050
Stan Oman Inlet Protection
EACH
8
S 160.00
S 1 280.00
9.00
S 7 440.M
112.50%
S 160.00
Measured Quantity Exceeded plan Quantity
200.00070
StaNlired Cons ctlon Entrenra
EACH
0
a
$ 650.00
$
0.00
S
#OIVMI
S
208-0020$
Em3lon Control Supervisor
HOUR
29
$ 00.00
S 1,200.00
17.D0
$ 1,020.00
85.00Yo
5 180.00
MeasulM Quantity less loan plan Quantity
21044MS
Ad'ust Fire Hydrant
EACH
1
S 750.00
S 750.0C
0.00
S
0.00%
S 50.00
M..,edl Quantity lass than plan Ouamit
210a 10
Ad ual Manhole
F CH
10
$ 230,00
5 2, 300.W
12.00
5 2,760.00
12000%
5 460.00
Measured Quantity Exceeded plan Quantity
2104M015
Modify Manhole
EACH
1
S 640.00
S 6,10.00
0.00
$
0.00%
S 640.00
Measured Quarnny less than plan Quantity
2104 17
Modify Metter Pit
EACH
1
5 465.00
S 465.00
1no
$ 1.395.00
300.00%
S 930.00
Measured Quantity Exceeded plan Quantity
CITY OF FORT COLLINS
LINDEN STREET STREETSCAPE DESIGN
ITEM NO.
DESCRIPTION
UNIT
PLAN
0PLANY
REVISED
QUANTITY
UNIT PRICE
TOTAL COST
Total Quantity
To Dato
Total Paid To
Dam
XCamplom
Over -Run I
Under -run
Ovar-Run I Under -Run Description
21O 050
Aduat Valve Box
EACH
6
S 180.00
$ 1.080.00
8.00
$ 1."0.00
133.33%
S 3e0.00
Measured QuantityExceeded an Quantift
210-01060
Adjust Water Meter
EACH
12
5 315.00
S 3,760.00
0.00
$
0.00%
$ 780.00
No Water Meter M ustments on roect
212.00006
Seedin Natbie
ACRE
0.2
S 360.00
$ 72.00
0.40
S 144.00
200.00%
3 72.00
Measured QuantityExceeded an Ounaft
212-00040
Soll Pre aratlon Liee
ACRE
0.2
S 1500.00
$ 700.00
0.20
S 700.00
1X00%
S
212-OOM
Sod
SF
1216
S 0.80
S 972.80
14.75
$ 11.80
1.21%
S (sal.001
Measured Quanty law than plan Quantity
212-00910
O anie Amendment Soll
CV
4
S 45.00
S 180.00
11.25
$ 1.856.25
1031.25%
S 1.676.25
Measured Quantity Exceeded plan Quart ty
2134MM
MuIcnin oed CN eia
CF
2109
S 2.00
S 4218.00
2000.00
S 4.000.00
94.83%
S 18.0
Measured Quantity less than Pan Quantity
213-000"
Mulehl Teekiner
LB
20
S 47.00
S 940.00
0.00
S -
0.00%
S 9a0.00
Used Soil Retention blanket instead of muldl Mth teekifler
2134MS
Ina snit MUleM1 (SpedOD Pea Gravel
SF
550
$ 120
$ 61i0.00
325.00
$ 390.00
50.09%
$ 70.09
Measured Ou.my less than plan Quantity
21940020
Landscape Weed Earlier Fabric
SY
62
$ 2.00
$ 124.0
805.60
5 1211.20
976.77%
S 1,08720
Measured QuantityExceeded Ian Quantity
213-00300
Concrete Landsca Border
LF
872
S 7.70
$ 5.174.40
459.00
S 3.534.30
fi8.3o%
$ 1.640.101
Measured Quantity less than Ian Quantity
213-00460
Metal IJtndsce Border 16x4 Iron
LF
131
S 4.50
S 589.50
131.00
S 589.50
100.00%
$
21340500
Tree Grate
EACH
16
16
$ 2000.00
$ 32,00000
15.00
$ 30.000.00
0.75%
$ .000.00
3 True Grates delviere l but not installed, Per OvOIW from ACC, the Items
cost S21.222 delivered and uninAelled. S21=I6' 3 F S40000 Which I5
chtiedas 2 tree rates, leavingashortage of l Use rate.
214-0000S
Le Msca Maintenance 4monthl
LS
1
$ 18000.00
$ 18000.00
0.00
$
0.00%
E 18,000.00
2Year Maintenance- not ealcutated in reconcile CO
214.00110
Deciduous Tree Inds Cabe
EACH
9
S 390.00
S 3.510.00
4.00
s 1.560.00
44A4%
S 1,950.00
EliminatedsomeUMsra 0 the ELCObuildi
21400220
Derduous Tree lndl Qaa
EACH
21
S 500.00
$ 10.500.00
21.00
$ 10.500.00
100.00%
$
214-00360
Oedduous ShNo Gallon Com we
EACH
153
$ 2T.00
$ 4,131.00
116.00
$ 3,132.00
75.62%
$ 99.0
Ellminate05ome LergsW In 0 the ELCO Dul
214-00650
Eva roan Shmb SGallon Comeina
EACH
20
S 30.00
S 600.00
20.00
S 600.00
100.00�6
S
21I-p)pI0
Pennnlala 1 Gallen Cemalna
FACH
3e
S 8.50
$ 306.00
17.00
S 144.50
17.22%
S 161.50
Eliminated acme Londsoo In Me ELOO Wlldln
214.OMO
Ornamernal Glass Gallon Comame eda
EACH
392
$ 9.50
$ 3.724.00
318.00
S 3.021.00
81,12%
5 03.0
Eliminated Same Landscaping h the ELCO building
21640015
Soil Ratenllen Rlanket lao
Sy
a5
S 5.00
S 325.00
W9.30
is 3.148.50
086.15%
S 2.821.50
Oeddod to usa woad bonier on enure soedad area Pails Rater Bann
a0 ow
ate Base Course Clan
TON
3205 W
3205.00
S 21.40
5 66,587.00
527.73
S 73,353.42
105.95%
$ 4,708.42
Meesunrd Quantl Exceeded an Quantity
17 De to
SY
23"50
2344.50
S 3.60
S 6440.20
2344.50
S 8440.20
100.00%
SHot
MLx As daft o.UJn Aa as
TON
23.8E
23.80
$ 145.00
S 3,451.00
23,e0
S 3.451.00
100.00%
S
r306-01600Recan0111onin
Hd Mbc sad Gredln SG 1 SBQB
TON
1726.30
1726.30
$ 87.00
S 115,862.10
1728,30
5 175.662.10
100.00%
5
C9ae eP8V9mem ainM sidaMial Odve =Tmek24hou Colo
SV
17.1
1
$ 70.00
S 1.216.00
18.10
S 1.267.00
104.02%
$ 49.00
Measured Quantity Exceeded plan Quantity
412-00605
Concrete Pavement 81nM Commercial Orive Tine Track 24 hou Cola
SY
520.88
1 526,88
1 S M.00
S 4J.731.04
526.8e
S 43.731.04
100.00%
$
CITY OF FORT COLLINS
LINDEN STREET STREETSCAPE DESIGN
Chance Order
ITEM NO.
DESCRIPTION
UNIT
PLAN
QUANTITY
REVISED
QUANTITY
UNIT PRICE
TOTAL COST
Total Quantity
To Data
Total Paid To
Date
%Complete
Over-RunI
Underaun
Over -Run I Under -Run Description
41241020
Concrete Pavement (10 Inch) ast Tack 24 noun Class
SY
307.aD
307.80
$ 95.00
$ 2a241.00
304.10
$ 28,830.50
98.80%
$ 51.50
Measured Quantity less than plan Quantity
420-00300
Geohndle elnfomin
BY
251.30
251.30
$ 2.20
5 552.66
251.30
$ 552.86
100.00%
$
601-21020
lCcn=te Sealwall - Type A Precast (Special)
EACH
I 1
I S 2900.00
$ 2.900.00
1 1.00
$ 2.900.00
100.00%
S
Wf4f0$0
Concrete Sestmall -T BPrecert dal
EACH
6
S 2200SD
S 13.200.00
8,00
S 13.200.00
100.00%$
601d 0
Mason Wall Repair
SF
100
S 12.OD
S 1,2DO.00
16.65
$ 199.80
16.65%
$ 1 000.20
Measured Quantity less than plan Quantity
80F600f4
Type, 131nlet GralJng and Frame cle Double Type 13
EACH
6
5 145.00
$ 870.00
700
3 1.015.DO
116.6796
$ 145.0D
Measured Quantity Exceeded plan O..ftty
607-1101
Fence al Residential i Relocated Fence and Gates
LF
32
S 20.00
$ 640.00
am
$
0.00%
$ 840.0
Installed by Others
607.11632
Fence al Residential 2 Relocated Fence and Gate
LF1
S 23A0
$ 1.012.00
0.00
S
0.00%
$ 1.012.00
In5ta11M bY Others
607-11633
Fence al T e C Relocated Fence and Gate
LE
135
S 25.00
$ 3.375.00
67.50
$ 1.587.50
W.00%
S 1,687.50
Removed by Contactor. Reinstalled by Others
507-11610
Fence(Special) Type 1A - Omamental Fence Panels
EACH
18
1t1
S 3,000.00
S 54.000.00
18.00
$ 54000.00
100.00%
S
607.116SO
Fence S ecle TyPe2. 8' WOod Fence
LF
31
S 24.00
$ 744.00
31.00
$ 744.00
100.00%
S
607-62000
Fence ctal Ornamental Posts(Surface Mount Fence Posls-S
EACH
12
12
$ 1,100.00
$ 13,200.00
1200,
S 13.200.00
100,00%
S
607.62016
Fence 'e Ornamental Posts Concrete Fence Past FOoter-0
EACHI
10
1 10
S 1.100.00
S 1LD00.00
10.00
1 S 11000.00
100.00%
S
60733172
Fence Chain Unit Inch
LF
215
5 24SO
S S760.00
207.00
S 4.9611M
96.28%
S 192.00
Measured Quantity less than plan Quarcity
607"122
U FOOI Gets S Steel Pipe Double Swing Gets)
EACH
1
$ 3.500.00
$ 3,500.00
1.00
$ 3.500.00
100am
S
608.00000
Concrete Sidewalk W De
SY
1279 1279
S 47.00
S 60.113.00
1249.30
S 58.717.10
97.68%
S 1.395.90
Measured Quantity less than revised plan Quaratty
60940010
Concrete Curb Ramp
SY
120.0
$ 41.00
S 4.920.00
133.29
S 5.464.89
111.08%
S 544.89
Measured Quantity Exceeded plan Quantity
6084o016
Truncated Domes
SF
310
$ 30.00
8 9.300.00
295.50
$ 8,395.00
95.88%
$ 402.00
Measured Quantity Ion Nan plan Quantity
609.00060
Stone Pavers
SF
731
S 94.00
$ 68.714.00
344.50
S 32.383.00
47.13%
5 6,331.00
installed 763 SF of Concrete Pavers at S42.44/SF - which resulted in
$32.381.72
e08-000e6
Grains Pavers fSeachun,
EACH
o
0
It 1.000.w
$
0.00
$
60IVml
6
506.00070
IltlerlOtld Pavers -concrete be
SF
4634
$ 1425
$ 66,034.50
388230
$ 55.322.78
83.T8%
5 10.711.73
Elimanted paverArea by ELCO oulldin
8024=6
Street Name Te1d S dal anddant and Stain
EACH
10
S 490.00
S 4.800.00
10.00
S 4.800.00
100.00%
S
648of000
euummeua sld.& .De m
TON
16
S 145.00
S 2.e1a.00
24.50
S 3.552.50
136.11%
6 942.50
Ms.. Q..cut, 9xcaeace plan Quam
608.10000
Sidewalk pain Conchale Chase
EACH
2
S 4300.00
5 8.600.00
1.00
S 4300.00
50.D0%
5 4.300.0
60A21020
Curb and Gutter Type 2 Seddon 11-M
IF
247
S 20.00
S 4.940.00
217.W
S 4,340.00
87.85%
s 00,00
Measured Quantity less than plan Quantity
609-21023
Curb and Guitar Type 2 Seddon ll (Special) 18-Head
LF
1865
S 23.00
S 42.595.00
1994.00
$ 45,882.00
105.92%
5 2,967.00
Measured Quantity Exceeded plan Quantity
613-0700 ipull
Box $ de (Splice Mx)
EACH
6
S 300.00
$ 1.800.00
6.00
$ 11800.00
100.00%
$
CITY OF FORT COLLNS
LINDEN STREET STREETSCAPE DESIGN
ITEM NO.
DESCRIP710N
UNITQUANTITY
PLAN
REVISED
QUANTITY
UNIT PRICE
TOTAL COST
Total Quantity
To Date
Total Paid To
Date
%Complete
Over -Run /
Under -run
Over -Run I Under -Run Description
61341075
3/41nch Electrical Conduit Plasfle
LF
40
S 3.50
$ 140.00
$0.00
S 280.00
20D.00%
S 140.00
Measured Quamft Excoetletl plan Quantl
61341200
2 inch Electrical Conduit (Plactic)
LF
1500
S 5.50
$ 8.250.00
1U3.00
S 7386.50
89.53%
$ 863.50
Measured Quarilty Tess than Nan Quentl
613-07300
3 inch Electrical Conduit(Plastic)
LF
665
S 9.00
$ 5,986400
880.00
S 7.920.00
132.33%
$ 1,935.00
Measured Quantity Exeaodetl plan Quantity
013.0f410
Tmf c, Signal Condult (Special) (Plastic)(Schedule 80)(2 each,2 Inch and 2 esch
3inch perlineal fact)
LF
350
S 30.00
1 $ 10.500.00
350.00 1
S 10,500.00
100.00%
$
613-10000 IV416M
LS
1
5 30.000.00
5 30,000.00
I'm
S 30,000.00
100,00%
S
613 10MS
Laid Standad and Luminalre eatdan
EACH
19
a 8.500.00
3 167,200.00
19.00
S 167.200.00
100.00%
S
61Ytwee,
Concrete Foundation Pad
EACH
2
S 475.00
$ 950.00
200
S 950A0
100.00%
$
619-10010
L Standard! Foundation
E4CM
19
3 1.500.69
$ 26,566.00
19.60
3 26.500.00
109.00%
$
61350100
Lifflitina Contact Center
EACH
2
S 4,000.00
S 8=0.00
2.00
3 6000.00
100.00%
$
61410145
Variable Message San LED (Single Faced
DAY
40
5 155.00
$ 6,200.001
58.00
5 8,680.00
140.00%
$ 2,480.00
Measured Quam6 Exceeded plan Quantity
619.40061
1314HIrch Service
LF
45
5 18.00
S 720.00
45.0
S 720.00
100.00%
S
a19.50080
finch Plastic Pins
LF
5,880
S 3.50
S 20580.00
0.00
S
0.00%$
0,580.00
Used! 7 pipeforall conduits
d1S30160
2lach Ples6c PIM
LF
495
S 4.20
9 2079.00
5036.00
S 21,151.20
1017.37%
5 19.072.20
J,uul 2'pIw for all conduits
610-00001
Fled Office Class 1
EACH
0
0
S 2p00.00
3
0.00
$
S
Rem6vetl fmm commct
620.0p020
Sanitary Foolifty
EACH
1
5 S00.o0
S SWIM
1.00
3 $00.00
100.00%
$
621-000f0
Bicycle Rack
EACH
9
5 1150.00
$ 10350.00
9.00
$ 10350.00
100.00%
5 -
622401SS
Planter Box ISpecian (Pets)EACH
34
5 1,000.00
5 34,000.00
34.00
Is %,000.00
100.00%
$
622402W
Bench
EACH
11
$ 2.700.00
S 29,700.00
11.00
$ 2%700.00
10Q00%
3
622-00270
113olland PedeStrlan
EACH
4
S 425.00
$ 1.700.0
12.00
S 5100.0D
200.00%
$ 3.400.150
Measured O.antily Exceeded plan Quantity
622-00271
BNIsnj aMcole S 'e
EACHI
2
3 570.00
S 1.140.00
2.00
S 1, 140.00
100.00%
S
6224)0350
Trash Reccotaxle
EACH
6
5 2,200.00
S 13,200.00
8.00
S 13,200.00
100.00%
$
623-00100
I ' ation
LS
1
S 24.000.00
S 24.000.00
1.00
$ 244000.00
100,00%
S
623-01706
14irch Saw. Prevent.,
EACH
1
5 1,500.00
S 1,500.00
1.00
S 1.500.00
100.00%
S
623-07006
3/41nch Water Meter
EACH
1
5 6000.00
5 15=0.00
1.00
$ 6.000.D0
100.00%
S
623,09906
3/4'Tie-In To E.Istlm alcurion
5ACH1
1
I
S 485.00
S 465A0
1.00
S 465.00
100.00%
$
626-00000
MoUllzatlen
LS
1
S 19.000.00
$ 19,000.00
1.00
S 19.000.00
100.00%
S
626.01000
Public Information Services
I HOUR
0
0
$ 125.00
$
0.00
$
S
CITYOFFORT COWNS
LINDEN STREET STREETSCAPE DESIGN
Rrceneile Chanen (Im
ITEMNO.
DESCRIPTON
UNIT
PLAN
QUANTITY
REVISED
QUANTITY
UNIT PRICE
TOTAL COST
Total Quantity
To Date
Total Pi To
Date
%emplete
Over-RunI
Under -run
Over -Run 7 Under4tun Description
6]0-00000
Flai
HOUR
1600
1600
$ 20.00
S 32000.00
1,187.75
S 29355.00
91.73%E
,Ba5.00
Measuretl Queen less than wised plan Quantity
62dA0d13
Thi Control Manal,onnom
DAY
105
S 400.00
S 42 000.00
107.50
S 43.000.00
102.38%
S 1 000.00
Measured Quantity Exreecetl plan Ouami
630-f(IM
Traffic Control 6vices
LSI
1
1
S 12,000.00
S 12,000.00
1.00
S 12.000.00
100.00%
S
62"Di
Construction Traffic Sl n(Panel Size A)
EACH
8
$ 78.00
S 624.00
2.00
S 156.00
25.00%
S 468.00
Measured Quantity less than plan Quantity
62"0312
Corel ctlon Traffic Sign (Panel Size B)
EACH
10
$ 100.00
S 1,000.00
4.00
S 400.00
40.00%
$ (600.00)
Measured Quantity less than plan Quantity
706701H0
F/A Minw Contract Revbions
FA
0,27125
0,27125
$ 80,000.00
S 21700.00
0.00
S
0.00%S
21.700.00
70&701
F/A Parmedino
FA
1
S 2.000.00
S 2.000.00
0.00
$
D00%
$ 2,001
nvoice not submitted to City for Plulneirrin Costs
700.70016
F/A Fuel Cost Ad'ustmem
FA
0
0
S 5,000.00
$
0.00
S
$
Removed from Contract
7041
F/A Linclecapa ElaablIshment Incentive
FA
1
S SAS0.00
S 3.860.00
0.00
S
0.00%
S ,890.0
Pending 2 year maintenance survival rate- not calculated In recondle CO
700.70019
F/A Asphalt Cement Cost Adustment
FA
a
0
S 5000.00
S
4.82
S 4,123,0
S 4123,00
700.70022
F/A O.R Colorado Trainln P ram
F A
1
S 525.00
S 525.00
0.00
S
0.00%
$ 525.00
Item not used
100-70.T60
F/A Emsbn Control
F
Al5,000.00
S 5.000.00
0.00
S
0.00%
S 5,000.0
Hem not used
700Y7AIM
F/A Utittl Lines
F A
S 15.000.00
S 15.000.00
0.00
S
0.00%
$ 15 000.00
Item not usetl
7a6TOW2
F/A R80matlF in
FA
1
S 30.000.00
S 30.000.00
0.00
5
0.00%S
011
PendingRR Imoices- net celculated In repanGle CO
7pO ..
F/A W Tap Fee -
FA
1
5 13,000.00
5 13,000.00
1.04
is 13,531.05
1 1".091
S 531.05
Tap fee exceeded estimate
S (96,'779.46)
Items in Yelimv are pending pm7ea Opse-put and not ulculate0 In the
reconcile change enter