Mr. O'Neill,
We would like to stay with the first proposal that we turned in for the contract. If you have any questions please call
me. My contact information is on the proposal and down below. Thanks again.
Beau Ward
Ward Energy
Business Development Director
215 W. Oak Suite 1000
Fort Collins, CO 80521
Office:970-449-4632
Cell: 580-402-3045
Fax:970-449-4637
Email: beau(a@wardenergy.com
Exhibit A
Letter Agreement Among the Ward Group Member Companies
May 16, 2012
Wes Biggers, President
FuelTek Conversion Corp.
5660 E. 58th Ave., Unit B
Commerce City, CO 80022
David Aguiar, President
Benchmark Electrical Solutions, Inc.
5739 Bueno Drive
Fort Collins, CO 80525
MMI
Re: Letter Agreement for Ward Group Proposal to the City of Fort Collins for CNG Services
Dear Mr. Biggers and Mr. Aguiar:
As follow-up to our conversations, this letter agreement (the "Agreement") constitutes the agreement
between Ward Alternative Energy, LLC ("WAE"), FuelTek Conversion Corp. ("FuelTek") and
Benchmark Electrical Solutions, Inc. ("Benchmark") regarding the proposal being filed this week and
any subsequent contract by and among us with the City of Fort Collins regarding their 7384 Transfort
CNG Site Maintenance Contractor 2012 RFP and Addendum No. 1 (referred to herein as, the
"Project").
The terms and conditions of the Project are as follows:
1. Definition of the Ward Group:
a. The parties to this Agreement shall act in concert to fulfill the requirements of the
Project acknowledging FuelTek as the primary provider of Scheduled Maintenance,
WAE as the primary provider of Routine Maintenance and all three parties working as a
team to provide Repair Services (and other services requested by the City such as
retrofits and modifications to the City CNG fueling facility). WAE will act as the lead for
the Ward Group and will be the prime contractor on behalf of the Ward Group with the
City. All billing of services for the Project to the City will be administered by WAE.
2. Term, Billing Rates and Payment Terms:
a. The Term for this Letter Agreement is today through the period of performance of any
contract signed by WAE on behalf of the Ward Group with the City for the Project. In
the event that no such contract is signed in 2012 then any party to this Agreement may
terminate this Agreement upon 30 days written notice to the other parties.
b. The billing rates for FuelTek to WAE for the Project in 2012 will be (and increased each
year by up to 5% over the prior year's rate per hour):
i. $125 per hour for work performed during normal business hours (as defined in
the contract with the City).
ii. $90 per hour for drive time.
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No.1
iii. 1.5 times the rate in item "i" for work performed outside normal business hours
iv. 2.0 times the rate in item "i" for work performed on holidays (as defined in the
contract with the City)
c. The billing rates for Benchmark to WAE for the Project in 2012 will be (and increased
each year by up to 5% over the prior year's rate per hour):
i. $105 per hour for work performed during normal business hours (as defined in
the contract with the City), including drive time.
ii. 1.5 times the rate in item "i" for work performed outside normal business hours
iii. 2.0 times the rate in item "i" for work performed on holidays (as defined in the
contract with the City)
d. Billing payment terms by WAE to FuelTek and Benchmark will be 30 days from WAE's
receipt of each invoice.
3. This Agreement may not be amended or modified, except in writing signed by each of the
parties hereto and shall be governed by and construed in accordance with the internal laws of
the State of Colorado (without reference to its conflict of laws principles).
4. If any provision of this Agreement is held to be invalid or unenforceable for any reason, such
invalidity or unenforceability shall not affect the remainder of this Agreement, which shall be in
full force and effect in accordance with its terms.
5. This Agreement may be executed in two counterparts, each of which shall be deemed an
original, but all of which together shall constitute one and the same instrument.
If this Agreement meets with your approval then so indicate your acceptance by signing in the space
provided below and returning one signed original to me.
Sincerely,
Beau Ward, Business Development Director
Ward Alternative Energy, LLC
ACCEPTED AND AGREED TO THIS 161"
DAY OF MAY, 2012, BY:
FUELTEK CONVERS ON CORP.
BY:��
NAME: in✓E3 IlbGG72S
TITLE: P�C1r7EH?
Ward Group Proposal to
SOLUTIONS, INC.
CNG Site MainL CNG Contractor 2012 RFP & Addendum No. 1
NAME: ��J N—, k,-,i lt-
TITLE:
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 11
Exhibit B
Ward Petroleum Corporation/Ward Alternative Energy, LLC
Additional Information
Ward Alternative Energy, LLC (as lead/prime contractor)
Beau Ward, Business Development Director
215 W. Oak Suite 1000
Fort Collins, CO 80521
Office: 970-449-4632
Cell: 580-402-3045
Fax: 970-449-4637
Email: beauw@wardpetroleum.com
Ward Petroleum Corporation ("Ward Petroleum"), founded in 1971, has built its reputation on a strong
foundation of integrity and hard work. Since company founder and Chairman Lew Ward drilled his
first well near Enid, Ward Petroleum has drilled or participated in more than 1000 wells.
Ward Petroleum has traditionally grown its reserve base through drilling, however, in recent years; the
company growth has accelerated through strategic acquisitions. Ward Petroleum now operates and
participates in wells in the Mid -Continent and Rockies. Historically, the company's focus has been
concentrated in the Anadarko and Arkoma Basins of Oklahoma. A few years ago, the company
opened an office in Fort Collins, Colorado, to develop prospects and business in the Rockies.
Ward Petroleum focuses on geologically complex areas with multi -pay and multi -well potential and
uses tools such as 3D seismic to reduce risk. Most recently, Ward has used advances in horizontal
drilling and completion to unlock the tight and compartmentalized reservoirs in the Anadarko Basin.
One of Ward Petroleum's proudest accomplishments was to grow during the downturn of the 1980's
when the drilling rig count fell dramatically. In explaining how Ward Petroleum was able to maintain
its level of activity, Lew Ward said "We just didn't pay much attention to people with a pessimistic
attitude. We had our sights firmly set on where we were going and failure was not an option."
Bill Ward followed in his father's footsteps, joining the company in 1984 after receiving a degree in
Petroleum Engineering from the Colorado School of Mines and a Masters Degree in Business
Administration from Southern Methodist University. Bill became President and CEO of Ward
Petroleum in 1997. Under Bill's leadership, the company continued to add value through drilling and
through increased efforts in acquisition of producing properties. Assets, reserves and revenues
recorded a four -fold increase after a few short years. In the past three years alone, reserves have
grown at a 13% annual rate.
Ward Petroleum also has extensive experience in natural gas compression through one of its former
subsidiaries, Gale Force Compression. Prior to becoming CEO of Ward Petroleum, Bill Ward formed
and grew Gale Force, which built and operated a fleet of 120 compressors with a guaranteed run time
of 95% and earned a spot on Inc. magazine's Top 500 list of Fastest Growing Companies in 1994.
Gale Force was sold in 1995 to Hanover Compression.
In addition, Ward Petroleum has extensive experience in gathering, processing and marketing natural
gas. Ward Petroleum currently operates Ward Gas Systems and routinely installs gathering systems
and production facilities. Ward Petroleum has also partnered with Frontier Energy to operated and
install large gathering systems and processing facilities.
In 2011, Ward Alternative Energy LLC ("WAE") was formed in Fort Collins, Colorado and is headed by
Beau Ward with a focus on developing the CNG infrastructure market in Colorado. Ward Alternative
Ward Group Proposal to 7384 CNG Site Mai nt. CNG Contractor 2012 RFP & Addendum No. 1 12
Energy is currently working with fleets in Colorado to provide CNG fueling station maintenance, repair,
operation, ownership and gas supply services to their fleets of converted and OEM natural gas
vehicles.
Among its many industry honors, Ward Petroleum Corporation has been listed in the Top 100 Fastest
Growing American Companies by Inc. magazine and has been named a "Blue Chip Enterprise" by
Nation's Business magazine. Most recently, Ward received the "Energy Advocate of the Year" award
in 2011.
The employees of Ward Petroleum are optimistic about the future. When asked; what makes Ward
unique? Bill Ward answers: First, it is our attitude. We have a "can do" attitude and we make things
happen. Second, I would point to our experience. Seventy percent of our folks have been with Ward
for more than 20 years. Third, we treat people right. We not only treat our employee's right, we treat
our partners, investors, mineral and surface owner's right. This is a core value of our company and
people want to do business with Ward.
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 13
Exhibit C
FuelTek Conversion Corp.
Additional Information
FuelTek Conversion Corp.
Kris Kielty, Operations Manager
5660 E. 58th Ave., Unit B
Commerce City, CO 80022
Email: kris@fueltek.biz
720-941-2791 office
720-941-4071 fax
303-916-1543 cell
FuelTek Conversion Corp. ("FuelTek") is based in Commerce City, Colorado, was originally a division
of Natural Fuels Company and was spun out as a stand-alone company in 2003. Natural Fuels
Company built and operated over 40 CNG public and private fueling stations in Colorado, was an
unregulated subsidiary of Xcel Energy in the 1990s, was sold to Blue Energy & Technologies in 2000
and became part of Clean Energy Fuels when Blue Energy & Technologies was sold in early 2003.
The spun out company was initially named Big Clean Service and was renamed FuelTek when Wes
and Holly Biggers purchased the company in 2006. Wes is the President of FuelTek and leads many
of the company's large projects and initiatives. Many of the employees of FuelTek began their
employment with Natural Fuels Company in the 1990s and represent a highly experienced group of
technicians with respect to natural gas vehicle and CNG fueling station technology, design, operations
and certifications (see table, below).
FuelTek has embarked upon several significant projects including EPA certification of a conversion
system for the 2008 Ford F-250; installation of CNG stations for University of Denver and Pioneer
Natural Resources in Parachute, Colorado; and, providing CNG fueling facility maintenance and
emergency services and truck fuel storage system design for Western Disposal in Boulder, Colorado
(one of the largest CNG fueling stations in the State). These projects and its many satisfied
customers at Denver International Airport, across Colorado and outside of the State, have established
FuelTek as a leader in the US CNG industry.
The company only installs EPA certified conversion systems, which are compliant with federal law.
They also perform maintenance on CNG vehicles whether aftermarket conversions or produced
directly by the leading auto and engine manufacturers. In the past, they have performed maintenance
work for auto dealerships in the Denver area that sell/service alernative fuel vehicles but don't have
the expertise on staff to efficiently and economically complete the service required. The company's
experience includes IMPCO (both fuel injected and industrial), Natural Drive (now owned by IMPCO),
Baytech (now owned by Landi Renzo), BAF Technologies, ECO-Fuel, AutoGasAmerica, PowerFuel,
Altech-Eco, GFI (both as aftermarket conversions and developed in cooperation with OEM's like
Ford), Cummins, and in-house systems developed by GM and Ford.
Regarding station equipment, FuelTek has experience with Ingersoll-Rand, Ariel, Greenfield, and
many other brands of compressors as well as with many types of controls, dryers, filtration systems,
dispensing systems and related components.
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No.1 14
Operations Staff
Experience
Kris Kielty
22 years CNG fueling facility management, design and
service; and, vehicle conversion/service experience
Tom Trujillo
17 years CNG vehicle conversion/service and fueling facility
service experience
Mike Goff
17 years CNG vehicle conversion/service experience and
master fabricator
Kellen Griswald
1 year CNG vehicle conversion/service and 5 years oil and
as experience
Ward Group Proposal to 7384 CNG Site Maint CNG Contractor 2012 RFP & Addendum No. 1 15
Exhibit D
Benchmark Electrical Solutions, Inc.
Additional Information
Benchmark Electrical Solutions, Inc.
David Aguiar, President
5739 Bueno Drive
Fort Collins, CO 80525
Telephone: 970-229-1885
Cell: 970-217-0774
Fax: 970-229-1895
Email: dave@benchmarkelectricalsolutions.com
Colorado Electrical License Number 7577
Master: David Aguiar # 5529
Benchmark Electrical Solutions, Inc.'s ("Benchmark") team has over 40 combined years of experience
in senior project management. Benchmark has an extensive working history in various medical
facilities, food and beverage plants, greenhouses, pharmaceutical facilities, synthetic gas plants,
clean rooms and semi -conductors plants. Benchmark is a member of Associated Builders &
Contractors and a member of Independent Electrical Contractors. Their electrical equipment
Inauaes (see tames oelow for aaalaonai
• Device Net
• Field Bus
• ProFi Bus
• HMI
• SCADA
• Mod Bus
Major Controls Manufactures:
• Argus, Automated logic, GE,
Siemens, Priva, Allen Bradley,
Johnson Controls, ALC
4JdX.rmWM ke+dr=Wa W t
ftwomdraaua, ft-ON&O
•��ddyakltic�dtbhal,
mm�Cry6mlral <dtSa vtgncsdr
ddm,adpcdoa, l"m
•7et4 iap .,f dsldd ptlilr ix M
tkona llm pemu¢tm ha d,6n
VaCLUd( Ee h kMYt emSss r ea# da
FM
'�VMWO
.CMS
.
• C,muw%* dek+,
• Rrcmm(d Iq lt>Jldaru Rgi(xn.
•Spvm�'titxl�rw:
the
• Boilers, CO2 controllers
• Air handler units, Chillers
• Generators and UPS
• Compressors, Pumps and Drives
Drives Material Handling Lines:
• Palletizers and Conveyors
• Custom High Speed Support
Equipment
• Automated Weight Systems
• Robotics Custom Controls
• Packaging Machines
pmdeai atukd 5dakrekkq+,+a�u
ua�iim fam tlr PeCanvnrtbn kan tlmhph
&CaMmlio IhrynmTl`khao hr
ftn4 WhrUWudQ &r Caud
71ee p wm iaq;.kAwO RM*fhan
Wap e�Ho w kf b b k w¢m5d'o
kk�q, yr{n nand padxl � nd
Ma Yemdsmuqwn d5be
Hk.r
• hxrmu dM1Gmtl mECq�arrt.
.am�pMexgmsl
• Coad W 4a,4A Onm fwddd d Wdd
' �u(ljnCa•ndsrktlnp
•(kewd4Aek[n
Zhu upriaad pananai ►t dd. raJ m
m#ua ud enkCaulmlmnn� arA,
rv�a+v�i� a, �d pc,d„iad
vunnl. Rw,v¢la�e k kpeun m
dmchmak Iltldd SaMS,m ud wr,a
ddnud [Orman" wade ie &
Itam"dh[Ilpm
1smmnt,k hudmkd,Gmvnmla 4n ke
(imnuak9M hd,Crul lJuttlh�.
MaldiftgdudMAU eibdmue
I,*J" %rw kr.
• UkSdrp,ram,
•CtmmnkpM4nkn
•SamdrSpuuan
• p,we IhwQaM
.I,ykky.Swmm
•Ca>RSJdiml
Ward Group Proposal to 7384 CNG Site Maint CNG Contractor 2012 RFP & Addendum No. 1 16
The company's core value added objectives include:
• Interactive design development and review in the design phase of a project, provides value by
bringing hands-on electrical, lighting and control elements of the design and providing input to
the project schedule at an early stage
• Cost competitive construction of your electrical, lighting and controls systems work can be
completed on a negotiated or fixed price basis
• Long term maintenance and service of your installed equipment and controls work is done on
a negotiated hourly basis
All Benchmark apprentices are B-
AT
certified and have worked on prevailing
wage projects. These apprentices all
go through a four-year registered
apprenticeship.
Benchmark is committed to a safe work
environment for employees and
property. Managing its safety programs
with a primary objective to prevent work
place injuries fulfills this commitment.
This objective is the highest priority for
all BES associates during all facets of
work. They will provide and maintain a
safe work environment as directed by
industry standards and requirements.
The company makes every effort to
eliminate hazards in the work place.
BENCHMARK
Heal91 •nd S O,
Manuel
P.9 6•NMn
1
1 of 1
Subjx ;
Table of Co A=
R•vlelon:
1
lesm Da1•:
3774012
Seobn
Desedplon
1
Far.nM
T
H.a eM so" Poky
s
H.d v S." Propnm 9bndarda
a
H.a aM Saf.ry Aadit .M bnpecdons
s
Acc .mh .Sped. Raponbq
P.ac..dms
8 OSHA bup. PeSsy
7 N dM d Dmy P.Acy
9 S., Imce Abu. QukfWhn
9 EmpkymaM a Yhwm
10 Fmpky« S." aM H..M RMsa
11 Enrpbad Ml ttcd U" Poky
LochsuV7p%d P o0a
12 Aasumd Equlpmsm G,..^db+9 Peopram
12 Elaeblcak S.hy
18 P. m Probetlw Equlpnam. T•eb..M
Equlpnem
1s F.S Prolecdon
18 Ladder ad"Y
17 S..ff W a."
18 Aadal.M 8cle.m Lift Sahly
19 f8.brl.l H..11L p pehy
29 Fagl11 58"
21 FISH Sehy
22 E.uvsuen SMOY
23 cwn Span sa"
L Raspwlwry Pml Cc
28 Palf.bb F4. E. MpW.r
M Ha—M Cpmmumealbn Prow.
n DC UVMIOn Rlpod .Pamopam
28 D Mbbss. M SK" T.Mmp Y.erinpa
2s Emarpaney Pnp..dnNs, F4a1 AM a CPR
6 D..Ip�.1W Prvridw.
20 C.mPlhsrc. Proprun
Ward Group Proposal to 7384 CNG Site MainL CNG Contractor 2012 RFP & Addendum No. 1 17
Exhibit E
CNG Fuelina Station Maintenance Form
et,Fuek CNG Station Service Log
Date Work Began:_/_ Work Order Type: If call ouL
Finished: _/_l_ _ Frevemalloa whaam _ Repair GL WCINaTe:
Site Name: _Call -Cut _Onei Tire Cal Placed:
Feocam rToolene
special Instm tions (f any):
Customer Mbfied 6Yak Dore: / / Bv:
PM Trott I
Hours:
CompressorA-
_ —.__-
Comaressx B:
Firtrapom
01 Level: Compresso* A: Crntpreswr B:
Oil Drained From:
(Check)
_ : In et Fillers
_ : Compressc Filers _ : Dryer Filters
_ :Main Coalescer 1
_ : Main Coalescer 2 _ : BD
Tani,
Gas Harding Rtei
_ : Dispenser Fdlers _ Oher
Url Uramed:
l:pmpesscr A
- gms lie Aided: c:prcuresior It t
gms
Cnmpesscr B:
- gms
Cornmessor B: -
gms
General Sources:
- gms
Total -
gms
-otal Sources::
= gms
Recirrulatei BDT Oil: Y/ N
01Type:
Compressor A. Pr ease des
Temparahaes:
Win:
psi
Oil Filter.
(name) Ambient:
degrees F
Crankcase:
psi
In:
psi Sucion:
deareesF
1st Stage:
psi
Out -
psi 1st Stage
degrees
2nd Cfwnw-
fro
tliffamnra =
for 2M Cfwee
dwpvww F
3rd Stage:
psi
SD- Pressure:
psi 3rd Stage
degrees F
4th Sin .:
pci
Ti. of Day:
ern/pm 4th Ski,.
da moc F
Comxessor B: Pre cures
Tamperabdes:
haul.
t.ai
Od Filhn.
(rmwe) llydrin d.
dayiemF
Crankcase:
psi
In:
psi Sucion:
degrees F
1 at Stage:
psr
Uut-
psi ist Stage
degrees
2nd Stage:
psi
Diffeence =
psi grid Stage
degas F
3rd Stage:
psi
SDI Pressure:
psi 3rd Stage
degrees F
4th Stage:
psi
Time of Day'.
awrim 4th Stage _ _
de re s F
Hoses )inference Receptacle Reference Conductive Test
Gas Handling Equipment
PSI
Cleaner
PSI Attar FU
Hose t
High
psi
Hose 2
Medium.
psi
Hose 3
LOW
psi
Hose 4
Horst. 5
Set Temp/Pressure: Y / N
Hose 6
Ho" '/
Hose a
Notes:
Time Fill
Inspection:
Check R Yes
Cordnerts
labor Descriptiion o' Wbrk
Compressors
Q
Drive
Q
Storage
Gas Handing
(all
Encbsure
Q
Sefwey Kornai'
Q
Dispensers
Q
Hocm
G]
Site Status
Q
Verity Cr`O
Hoes:
Technician None:
Mist. Equip. 0
Materials Description Part Naniber Quantity
Notes
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 18
Proposal:
Response to the City of Fort Collins Purchasing, 7384 CNG Site Maint.
Contractor 2012 Request for Proposal (RFP) and its Addendum No. 1
Proposal Submitted By:
Ward Group (Ward Alternative Energy, LLC as lead/prime contractor)
215 W. Oak Suite 1000
Fort Collins, CO 80521
Office: 970-449-4632
Cell: 580-402-3045
Fax:970-449-4637
Email: beauw@wardpetroleum.com
Company History
The Ward Group is a contractual relationship among the prime contractor Ward Alternative Energy,
LLC (WAE") and FuelTek Conversion Corp. ("FuelTek") and Benchmark Electrical Solutions, Inc.
('Benchmark"). Attached as Exhibit A to this proposal is a copy of the letter agreement among the
three parties indicating their legal commitment to function as a team with WAE as the lead to provide
the proposed services described in this Proposal.
WAE is an affiliate of Ward Petroleum Corporation, which has offices in Fort Collins, Colorado and
Enid, Oklahoma. Ward Petroleum was founded in 1963, provided oil and gas field compression
services directly and via its prior affiliate Gale Force Compression, and developed and operates
hundreds of oil and gas wells. Ward Petroleum employs approximately 65 people including
engineers, technicians, geologists and administrative staff. WAE is developing CNG fueling station
operations in Northern Colorado including building, owning and operating fleet and public fueling
locations and providing compressed natural gas ("CNG") station operation services (maintenance,
repair and operations) to others. The lead point of contact at WAE for the work contemplated by this
proposal is Beau Ward, Business Development Director. Additional information about WAE and Ward
Petroleum Corporation is presented in Exhibit B to this Proposal.
FuelTek is based in Commerce City, Colorado, was originally a division of Natural Fuels Company
and was spun out as a stand-alone company in 2003. Natural Fuels Company built and operated
nearly 50 CNG public and private fueling stations in Colorado, was an unregulated subsidiary of Xcel
Energy in the 1990s, was sold to Blue Energy & Technologies in 2000 and became part of Clean
Energy Fuels when Blue Energy & Technologies was sold in early 2003. The spun out company was
initially named Big Clean Service and was renamed FuelTek when Wes Biggers purchased the
company in 2006. Many of the employees of FuelTek began their employment with Natural Fuels
Company in the 1990s and represent a highly experienced group of technicians with respect to
natural gas vehicle and CNG fueling station technology, design, operations and certifications. The
lead point of contact at FuelTek for the work contemplated by this proposal is Kris Kielty, Operations
Manager. Additional information about FuelTek is presented in Exhibit C to this Proposal.
Benchmark is a Colorado based company with extensive electrical experience in commercial,
institutional/government, service, commercial, industrial, education, medical/hospital and retail
environments. This company engages in pre -construction, construction and service aspects of
electrical support and has over 40 combined years of experience in senior project management. They
have an extensive working history in various medical facilities, food and beverage plants,
greenhouses, pharmaceutical facilities, synthetic gas plants, clean rooms and semi -conductors plants.
The lead point of contact at Benchmark for the work contemplated by this proposal is Dave Aguiar,
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 1
Exhibit F
Holidays
New Years Day
Memorial Day
Independence Day (July 4t')
Labor Day
Thanksgiving
Christmas Eve
Christmas Day
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 19
Exhibit G
Certificates of Insurance
ACORQ CERTIFICATE OF LIABILITY INSURANCE "6111 011
0a/7
CLNr.Uia • nU WOAItAI'9NOIAV ArOOpM WaNOIbOnlO UPOa Ibt llPla rwla+AA2KA.iW
CEPIIrYJtE Od2 NOI u1dW 1Mtr d1 NIWnRLv KtIN11, fldPp g114in1 nPl t'pllAApp KiP4Sl16r TNa 19LIa69
mOrc IlncntrocAmalNawAltr,F twlx NOraoNpmvra AcoNtacra[tN¢A na aKWO%AwC0.11 AutNDA¢[0
11LIRLIINf.IM OII IgQINII'[It Klp n([[Pnrll'/1r[ Nplp[P.
N w N7M%(ayMlbaWY Y/ab
b bl,P W la1�YNIN OfAp.OPW W16b M P4F.n.tivWM A Walk MMe/YMab Gsd M mlrpbbN
aalte str b w u kal waakraKN
•oouau
a:er A ��ata
Wa0•lbvllt IastlrLN:a AOeac7
401% It, Claud Dr.
97970�679. 711/ - lf6.fi6.9111
lerf-ar�ErOstMlbvta.[,r
Salto 100
lorlud, CO $0113
a2a11n12t
o4a'aa
AulO lbmors
IifN
6aacarA 91RtHca9 SOlatl00o I"
wave.., I Nb901 Assur'
c1i90
9711 0oono Orlu+
tea,
Fort C0llf0%. CO 60%21
wvw•a,
Wooten, 11-IZ
Iws,g iO ClNlfv lh4 tN[ C,fE b6tMaac bilU 1MK W t NEa.JINlUIMY[a AppK 1pA nta gi'l4Y%bq+
+ICa'JIEp MaMMatKd1W AMY N1,a1n1lA2Nl, ltNY bll:(YIGIIpNO ANYfAtN.CI d111pLP dX.IAQM WTIRpfC1TDW4N n+d
CEA dIGiE W v aEtl'ltaall WY NJItaN, f16 dtllANrA.K7dlpm QI71U:1WL[! fK2GAaLp NOSW IS R1sRCt tO N21M t1Paf
GR Wpa]KO WNdlnuOr WCN/OUOtp. UUtt aq�W WY INM dip RFNIO[Oir W0 GAY9
rrwnae,r,a,ca
ro.arvaws
lam
A
tlYIWIIW/Ir
A
tawuu. d,cw
aunIt Z%t aoaw
Init x.lvar o/ Sub
7a010aa7.1
011IxMlt
0UtU1011
tA]I(Awat
manr+yrr.+o9
+ Iy000r ,_
t 10
�
wucwu.,sv.u70
. 1 atl0`—
a[,anlw..06uL1k
+ 2,000,
e.n
ualAO.nuarunes,Yr
A?AY 679 M—
�ra0nn,m.ua+..m
. 2yy
A
�k
2
.Cabbb.lft
ww.:4u Cb
.wc0wras
1do.u0.u,0a
ala4rti/1�~�
k
t1odlA+rbl..�o
ikigir: w�[i
w«w.o
r
+
k
k
A
'�k"r+'o
uunvr
2OtM
aAauuu
1 t
SV31R01//1+fcltil7
c.u�ac0abket
+ S 000`
KmOru
. S M
A
. ,ng11 0
k
6
rok +..rrt
n tni ri4al 1wr+W„rs •+�
IrY.A.N
P+�
AIH2O
8167 xAMN OF S=
captfAllt
6A01=2
,
I4IYa4
MA M
too
k ipp,_
Soo
nn,w,aads..rwltaul,mlmk tP+...m0w+.+..vw.sv.r.+�.,�N.r..a
oNdlpulrvnQ [alFatc4PJS{Lp sZit1Y
Name
Ilc IR11Wtt2a OAIc IC Iltlltp. NIIp1FC7 ItM. b Kus1AfD b
A[C011pANR NaI+, 114 ra6r 1pnslmla
.=mvm w.ns.ubv
AAslor
"ran Lida
019MZM ACONO COf""110M-AY+iplii wParval
ACOOO"gxmmj tN ACOAO maa.m tt;9 pa n0gfwaa Mob a/ ACOAD
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 20
DO
CERTIFICATE OF LIABILITY INSURANCE
THIS CERTIFICATE 9 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO FJO S UPON THE CERTIFICATE HOLDER. THIS
CEINTIPKATE TH1ES NOT AFFTRTWTN Y OR NEWTWELY AMEND. EXTEND OR ALIEIR THE COYFRAGE AFPGROED BY THE POLICIDS
BELOW. THIS LTERIIFICATE OF INSURANCE DOES NOT CONBTTRITE A CONTRACT BETWEEN THE ISSUING DNIWRERRBL AUTHORZED
REPRESENTATIVE OR PROODCEFLAND THE CERTIFICATE HOLDER
IMPORTANT: N ON aKNlca herd. le m ADDITIONAL INSURED, dw po0e1(••).1 a ardarwd. RI WIBROOATION IS WAIVED. •eef W
I've we erld candlBNe of Db pocky, eandn polEeln m y Iaqutre m erdwaftawa . A atXtaelma m dlR• wnEme does not neater dOflb Ts GIs
wnlOwb Nata•r M D+u of inch R1dee••mI•
Pwwuctw
Keller -Lowry Insurance Inc
1777 S HIT,iene 8c #700
Donor m 80210
BLli O..de CTA06 ea..rdun
_
SO] 7S6-9909 rR umnx-on
INWmc
FTielTak Conversion Cotporetioe
DBA Big Clear Se Rae
S660-8 SBtA Ave_, Unit 8
C:®eroe City m 8002E
aCal As ^m
f_MFCYAOCR. lXunFN.ATc mnllwin•li/12 GL AO NC rtc RIMWneRF
THIS IS TO CERTIFY THAI THE PClICIES OF III LIMA :E LISTED BELOW WAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR 1FE POLICY PERIOD
INDICATED, WTVATHSTANO1NO ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER OOCIA£NT WITH RESPECT TO "IC" THIS
CERTIFiGTE MAY BE I9ED OR ANY PERTAK TRIM INSURANCE AFFORDED SY THE PGLDIES OESCPoBED HEPHF IS SUBJECT TO ALL TEE TE MIS,
EXC.LUSONB AM CONDITIONS OF SUCH POLICIES. TWITS SHOM UAY NAVE BEEN REWCED BY PAID CLAN&
101101
f1El OI ea1tA61
I llYlte
A
aNI IL AI eM
K
CCO M29PT
nN/"l1
/1212012 I
I
1
1
1,000,00
Jae ITS
TIYCTude
I aoo DD
2,000.000
er nrT e�1R:
{
2,000.00
+
A
Aelv�omiawurt
yN
MDes� X Td ¢ID
X .men w
X
E10010M26%
/1212911
I
SLOLYDWRYAMpvogl
/12/2012 svvt- R{aRry AM
1
D
IF
+
rtetlFaaa llY
GRBf YA
��
I
B
RnFera•a eenerAtMI
AIC mLermLIAA¢1R
ovvla
X $TA
1
I8
El,
500
500,000
B6EClPIRa of aemATas+ILOFIIeN+rlgopp 1Aa.a ACOIr NLA•Rlr/ IWab wr. •r+n aRe r �a+r•A
IRIOULDANY OF TIE ASOVB M"MaD POLICIES Se CA*== BUM
TIE mVIRATI M DATE TNOUSIM. NOTICII 14011.1 N DENTIRED M
Cer In£erm6lLee On1V ACCOITMCE UrrII TIE Pw1CY PRDT®OvO.
AVIIIeR®ItM�ITA1nE
911x11W CIC COUXA---_-�,
AC0110 z6 (YD10105) 01858.2010 ACORD CORPORATIOM All dghts raw"d.
INSWS palmR•r merlin of ACORD
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 21
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 22
Operations Manager. A complete background of the company, description of lead personnel and
electrician/other certifications, insurance, and project references are contained in Exhibit D to this
Proposal.
Services to be Provided
The Ward Group will provide the resources necessary to fully satisfy the Scope of Work described in
the RFP. In addition, Ward will provide advice and recommendations for improving the Transfort CNG
fueling facility in order to minimize down -time, improve equipment/system diagnostics and reduce
operating costs while meeting the fueling requirements required by the Transfort daily bus operations.
Primary References
Western Disposal Services, Boulder, Colorado.
Contact: Mike Seader
Telephone: 303-444-2037
Email address: mseader@westerndisposal.com
Ward Group member: FuelTek
Type of relationship: CNG station maintenance services.
2. University of Denver, Denver, Colorado.
Contact: Don Auman
Telephone: 303-871-3219
Email address: don.auman@du.edu
Ward Group member: FuelTek
Type of relationship: CNG station maintenance services.
3. Encana Parachute.
Contact: David Grisso
Telephone: 970-285-2601
Email address: david.grisso@encana.com
Ward Group member: FuelTek
Type of relationship: CNG station maintenance services.
4. Front Range Fuels.
Contact: Dan Sanders
Telephone: (970) 674-2910
Email address: drsanders@frontrangeenergy.com
Ward Group member: Benchmark
Type of relationship: commercial/industrial electrical system for ethanol plant.
5. Sundrop Fuels
Contact: Richard Ridley
Telephone: (303) 665-1882
Email address: richard.ridley@sundropfuels.com
Ward Group member: Benchmark
Type of relationship: commercial/industrial electrical system for syngas plant.
Experience
The Ward Group has more than five years of experience in providing commercial CNG fueling station
maintenance and repair services in addition to applicable commercial/industrial electrical services. As
described in the Company History section above, WAE, through its affiliate Ward Petroleum
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP &Addendum No.1 2
Corporation, has decades of experience operating compressors in the oil and gas field and has six
engineers all with their P.E. license and technicians on staff to support the services to be offered by
the Ward Group under this Proposal. These personnel will complement the capabilities of FuelTek to
provide services described in this Proposal including routine maintenance, preparation of schematics
of existing systems and retrofits/modifications and coordinating oil sampling and oil lab analysis. See
Exhibit B for additional information.
FuelTek has been in business providing CNG station maintenance services, among other services, for
more than five years and its operations personnel, led by Kris Kielty, have 22 years of experience with
natural gas vehicle and CNG fueling station maintenance, repair and operations. The FuelTek
operations center in Commerce City maintains an inventory of high-pressure natural gas tubing,
fittings, valves, and related components necessary for immediately assisting with repair of CNG
fueling facilities. These inventoried components are rarely stocked by other companies in Colorado
and offer a significant resource to the support of the Transfort CNG fueling station. In addition,
FuelTek has fully equipped service vehicles (that run on natural gas) with the proper tools available to
support the scope of work outlined in this proposal. See Exhibit C for additional information.
Benchmark and its key personnel have many years of experience providing electrical services via its
certified electricians and other personnel to commercial and industrial facilities including fueling
facilities and other operations with compressors, generators, pumps, controls and 3-phase electrical
power in Northern Colorado. These personnel are involved in the pre -construction, construction and
on -going services to ensure the proper design and support of the electrical systems at the Transfort
CNG fueling facility. See Exhibit D for additional information.
Combined, the Ward Group member companies bring many years of natural gas, CNG fueling facility,
natural gas vehicle, and electrical systems experience via personnel located along the Colorado Front
Range from Fort Collins to Denver.
Note that copies of certificates of insurance for each member company of the Ward Group are located
in Exhibit G to this Proposal.
Key Personnel Qualifications
Key personnel that work for the members of the Ward Group have a combined more than 50 years of
experience with natural gas compressor systems, 30 years of experience with CNG fueling station
equipment, 30 years of experience with the conversion and service of natural gas vehicles, and 30
years of experience with commercial/industrial grade electrical systems. The table below summarizes
applicable experience of the Ward Group key personnel in accordance with section 2.0 Contractor
Qualifications listed in the City RFP.
Name
Experience with
Capable of
Preparation of
Perform
CNG Systems &
Designing,
Schematics of
Refrigerant Oil
Controls similar
Installing and
Existing
Sampling and
to the Transfort
Calibrating
Systems,
Provision of Oil
CNG Fueling
Retrofits or
Retrofits or
Analysis Lab
Site
Modifications
Modifications
Report
Kris Kielty,
Yes
Yes
Yes
Yes
FuelTek
Mike Goff,
Yes
Yes
FuelTek
Tom Trujillo,
Yes
Yes
FuelTek
Beau Ward,
Yes
Yes
Yes
Yes
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1
WAE
Mark Jopling,
Yes
Yes
WAE/Ward
Dave A uiar
Yes
Yes
Yes
Mickey
Yes
Yes
Woolhether,
Benchmark
Joe Reinhart,
Yes
Yes
Benchmark
Select Resumes
Kris Kielty of FuelTek has 22 years of experience in the CNG fueling station and natural gas vehicle
conversion/service industry. Kris's positions at Natural Fuels Company (1990-2003) included CNG
fueling station maintenance, operation, and State of Colorado weights and measures certification for
public dispensers (48 private and public fuel stations); operations manager for CNG vehicle
conversion/service business; and, dispenser, compressors and controls manufacturing lead. At the
successor entities to various aspects of Natural Fuels Company (Big Clean Service and, currently,
FuelTek), Kris has been the operations manager. Kris holds many certifications and designations
related to CNG fueling stations and natural gas vehicles as follows:
• Ford Motor Company Senior technician
• General Motors advanced electronics technician
• A.S.E. Master technician
• A.S.E. Alternate fuels certified
• A.S.E. Advanced electronic technician
• Fuel Maker (home/commercial UL rated fueling appliance) Certified
• Completed Ariel Compressor school
• Completed Ingersoll Rand compressor school
• Completed Bauer compressor school
• Completed Greenfield compressor school
• Completed Micro motion dispenser flow meter school
• Completed Kraus CNG dispenser calibration school
• State of Colorado alternative fuel certified
• C.S.A America certified fuel system inspector U 4370 A
• Allen Bradley control certified
Beau Ward of WAE has 4 years of experience maintaining, repairing, setting and building natural gas
compressors at MidCon and Ward Compression Services. Beau gained valuable experience with well
head and booster station compression at MidCon for three years. Beau holds a bachelors degree in
Business Administration from Oklahoma State University and has studied engineering at Colorado
State University.
Mark Jopling of WAE and Ward Petroleum is a Professional Engineer (P.E.) with 28 years of
experience in natural gas drilling, completion, gathering, compression and related services at Ward
Petroleum. He graduated from the University of Texas at Arlington in 1975 with a Bachelors Degree in
Physics. Mark was initially employed by Halliburton and worked in Texas and Oklahoma as a field
engineer and district engineer until 1981. He joined Ward Petroleum in 1981. He Received his P.E.
in 1984.
Dave Aguiar of Benchmark has over 20 years in the electrical industry. The majority of his career has
been in the industrial sector with customers like Sun Drop Fuels, Front Range Energy, Range Fuels,
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 4
Anheuser Busch, Amgen Pharmaceutical, Roche Pharmaceutical. Instrumentation and controls have
been a steady part of his career. He also has experience with customers in the commercial markets
including CSU, St Anthony North Hospital, St. Anthony Central Hospital, and CDOT. A good portion
of the projects he has completed have been on a design build or design assist basis. He has spent
much of his career (prior to co-founding Benchmark) as an electrician and project manager for larger
firms based in Denver. Currently he is the President of Benchmark. His current Ft Collins Electrical
License is # ME-1186.
Available Equipment and Tools and Communications Systems
Each of the members of the Ward Group has equipment on -hand to meet the requirements of the
Scope of Work in the RFP. Each of the members maintain a 24/7 communications system in order to
be available and respond to repair needs in the time -frame specified in this Proposal. Specific details
about equipment and support vehicles are as follows:
WAE: The company has purchased a new CNG service truck with fuel download capability
and all the necessary tools for maintaining and repairing a CNG fueling station and the truck is
expected to be in its fleet in June 2012.
FuelTek: The company has 3 service trucks that serve Colorado and are fully equipped with
service equipment and high-pressure fittings and applicable tools. All of these vehicles
operate on compressed natural gas. In addition, fittings and components relevant for CNG
fueling station maintenance and repair are stocked at the FuelTek Commerce City, Colorado,
operations facility. Also, significant metal -working, welding, and other equipment is located at
this facility.
Benchmark: The company has all the necessary tools and equipment to take on any industrial
or commercial electrical project. The company is set up for stationary work or portable work in
different geographical areas. They currently have four service trucks serving the Fort Collins
area. The company operates a fully equipped service facility where components can be
serviced/repaired and the facility is fully stocked with relevant electrical components.
Pricing
Scheduled & Routine Maintenance.
The Ward Group will provide Scheduled Maintenance as described in the RFP Scope of Work and
during normal business hours (as defined in this Proposal). In addition, the Ward Group will provide
routine maintenance visits to the Transfort CNG fueling facility on an at least weekly basis during
normal business hours (as defined in this Proposal) and such visits are included in the annual prices
below. For each scheduled and routine maintenance visit to the facility, the form attached to this
Proposal as Exhibit E will be filled out and one copy will be left at the site in a weather-proof container.
Year One: $48,800 (see note 1 and 2)
Year Two: $51,200 (renewal option, see note 2)
Year Three:
$53,700 (renewal option, see note 2)
Year Four:
$56,400 (renewal option, see note 2)
Year Five:
$59,300 (renewal option, see note 2)
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1
Note 1: For evaluation of this price on a volumetric basis (assuming the current 17 Transfort CNG
buses consume 35 diesel gallon equivalents (DGE) per day, six days per week), the estimated
scheduled and routine maintenance for Year One would be approximately $0.26 per DGE.
Note 2: The prices presented are for scheduled & routine maintenance for up to 20 CNG buses in
revenue service and the Ward Group reserves the right to increase the price by up to 25% once 28 or
more CNG buses are in revenue service at Transfort, which utilize the CNG fueling station.
Parts Inventory
The Ward Group will provide recommendations regarding list of service parts and repair parts (and list
of suppliers) that should be on -hand at the Transfort Shop. The Ward Group will provide regular
communications about when parts are used. In addition, the Ward Group will maintain its own
inventory of various high-pressure gas tubing, fittings, valves and other components it deems
important to support the Transfort CNG station (see Experience as well as Available Equipment and
Tools and Communications Systems sections above).
Response Time:
Trouble call: A technician will respond by phone within 30 minutes of the initial call.
Non -emergency unscheduled maintenance or repairs: a technician will be on -site within one
business day.
Emergency calls: A technician will be onsite within two hours.
Repair Work:
Normal Business Hours: 7:30am-5pm Mountain Time, Monday -Friday except holidays (see
Exhibit F to this Proposal for a list of holidays). Overtime rate applies for time worked outside
of normal hours except on holidays when the Holiday Rate applies. All rates below are for
calendar 2012 and may increase by up to 5% per year beginning in 2013.
Service Technician, Normal Rate: $135 per hour (billed in 15 minute increments)
Service Technician, Overtime Rate: $205 per hour (billed in 15 minute increments)
Service Technician, Holiday Rate: $275 per hour (billed in 15 minute increments)
Services Considered Necessary (but not specifically requested in the Scope)
The Ward Group recommends that the City enable and/or purchase an automated call out system that
would contact the Ward Group in the event of a failure to start for any compressor, loss of electrical
power, key component failure, and for other reasons that would require a response by the Ward
Group and would not otherwise be monitored by City employees, e.g., during fueling hours. The
phone line serving the fueling card access system could be accessed by such a call out system. This
system would improve the operation of the CNG fueling station. The Ward Group stands ready to
assist in the installation/set-up of this system at the rates presented above for Repair Work or as
mutually agreed to by the Ward Group and the City under the terms and conditions of this Proposal
and associated RFP.
In addition, the Ward Group recommends that the City consider purchasing replacement
compressor(s) for the fueling facility prior to when the additional 13 CNG buses (in addition to the
current 17 CNG buses in operation) are planned for revenue service. The compression capacity of all
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1 6
three compressors currently in use at the City CNG station will likely run full time during the daily 5pm-
10pm expected fueling window once all 30 buses are in use and this will not allow for the fueling
window to be met if a single compressor or related component fails. The Ward Group stands ready to
assist in the design of such improvements to the City CNG station regarding these and other retrofits
and modifications at the rates presented above for Repair Work or as mutually agreed to by the Ward
Group and the City under the terms and conditions of this Proposal and associated RFP.
Rating Matrix
The Ward Group acknowledges the rating matrix (see City's table below) that will be used by the City
to evaluate this Proposal and any subsequent interviews between the City and the Ward Group. The
rating scale shall be from 1 to 5, with 1 being a poor rating, 3 an average rating, and 5 an outstanding
rating.
Weighting
Qualification
Standard
Factor
Does the proposal show an understanding of the
1.0
Scope of Proposal
City's requirements?
Do the persons who wi0 provide services have the
3.0
Assigned Personnel
necessary skills. licenses, and certifications?
Can the contractor respond efficientfy to both non-
1.0
Avallabifrty
emergency and emergency service requests?
Is the firm interested In providing the requested
1.0
Motivation &
services? Does the firm and their personnel have
Capability
the experfence needed to complete work ediclently
and expeditiously?
Cost and work
Are hourly rates and other costs reasonade?
4.0
Hours
I have read and fully understand the conditions, specifications and special instructions set forth in the
Request for Proposal and all attached Exhibits for RFP 7384 CNG Site Maint. Contractor 2012 and its
Addendum No. 1. In addition, I hereby state that this document represents the complete and
authorized Proposal being made by the Ward Group.
For Ward Alternative Energy, LLC. (lead/prime contractor for this Proposal and the Ward
Group). See Exhibit B for contac nformation.
By. k�)� C, /i✓lt
Name: Bill Ward
Title: President/CEO
Date: May 16, 2012
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No. 1
For FuelTek Conversion Corp. (member company of the Ward Group). See Exhibit C for
contact information.
By: 4/ _
Name: Wes Biggers
Title: President
Date: May 16, 2012
For Benchmark Electrical Solutions, Inc. (member company of the Ward Group). See Exhibit D
for contact information.
By: '�\
Name: David Aguiar
Title: President
Date: May 16, 2012
Ward Group Proposal to 7384 CNG Site Maint. CNG Contractor 2012 RFP & Addendum No.1