HomeMy WebLinkAboutCHANGE ORDER - RFP - 7190 METER DATA MANAGEMENT SYSTEMCHANGE ORDER NO. AMFC Siemens #2
PROJECT TITLE: Advanced Meter Fort Collins' (AMFC) 11190
CONTRACTOR: Siemens Energy, Inc
PROJECT NUMBER: NA
PURCHASE ORDER NO.: 9113703
DESCRIPTION: Meter Data Management System for AMFC
Reason for Change: To support the Aclara Web Portal, application and the
Aclara (Calico) Demand Response application (note:
Aclara has the lead`contract for Calico Demand Response
application) additional work effort is required by Siemens in
excess of the existing Siemens scope of work. The
specific additional scope of work required by Siemens is
(1) Support Aclara requirements workshops, (2) Integrate
EIP to the Aclara Web Portal application, (and 3) Integrate
EIP to the Aclara/Calico Demand Response application.
2. Description of Change: This change is to do the added scope of work as described
above. The exact cost of this work will be based on level
of effort (hours), required of Siemens staff to do this work
along with related travel and expenses as required. The
cost in this Change Order is an ESTIMATED not to exceed
price.
3. Change in Contract Cost: $152,616
4. Change in Contract Time: N/A
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.:
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
7.5%
19.9%
Vosler Marsha= ,.V.. .
ACCEPTED BY: f °"` �01210�°545'2"W- DATE:
Contractor's Representative: Marsha Vosler, Controller
ACCEPTED BY
REVIEWED BY
APPROVED BV
APPROVED BY
cc: Purchasing
$ 2,035,454
$192,253
$0
$ 152,616
$ 2,380,323