Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7190 METER DATA MANAGEMENT SYSTEMCHANGE ORDER NO. AMFC Siemens #2 PROJECT TITLE: Advanced Meter Fort Collins' (AMFC) 11190 CONTRACTOR: Siemens Energy, Inc PROJECT NUMBER: NA PURCHASE ORDER NO.: 9113703 DESCRIPTION: Meter Data Management System for AMFC Reason for Change: To support the Aclara Web Portal, application and the Aclara (Calico) Demand Response application (note: Aclara has the lead`contract for Calico Demand Response application) additional work effort is required by Siemens in excess of the existing Siemens scope of work. The specific additional scope of work required by Siemens is (1) Support Aclara requirements workshops, (2) Integrate EIP to the Aclara Web Portal application, (and 3) Integrate EIP to the Aclara/Calico Demand Response application. 2. Description of Change: This change is to do the added scope of work as described above. The exact cost of this work will be based on level of effort (hours), required of Siemens staff to do this work along with related travel and expenses as required. The cost in this Change Order is an ESTIMATED not to exceed price. 3. Change in Contract Cost: $152,616 4. Change in Contract Time: N/A ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O.: TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all change orders approved) 7.5% 19.9% Vosler Marsha= ,.V.. . ACCEPTED BY: f °"` �01210�°545'2"W- DATE: Contractor's Representative: Marsha Vosler, Controller ACCEPTED BY REVIEWED BY APPROVED BV APPROVED BY cc: Purchasing $ 2,035,454 $192,253 $0 $ 152,616 $ 2,380,323 TE 10-25 -ZD 12. TE: TE: kTE: <