Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7107 CARPENTRY CONTRACTOR 2010 (2)q Z WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Geor9e E. Moore, DBA, FINISHING TOUCH DATED: March 1. 2010 Work Order Number: OP-448755 Purchase Order Number: Project Title: Gardens on Spring Creek — Shed Commencement Date: Completion Date: Maximum Fee: (lime and reimbursable direct costs): S11,027.50 Project Description: Provide a turnkev 16'-0" x 24'-0" with 8' tall walls. Scope of Services: Provide all necessary engineering material labor, and permits to buildinn the shed Acceptance User Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached forms consisting of Eleven.(11) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of`FortrtCollins By: Date: CC: Purchasing Service vider BY: EXISTING PUMP Q�oQ HOUSED Full property - NTS Portion is circle is to scale on this page PROPOSED 123'-10" TO EXISTING SHED VISTORS CENTER EXISTING GARAGE PROPERn"UNE ROLLAND MOORE DRIVE N Horticulture Shed Site Plan 10.10.12 sc,us: A"=t'-o' O NOTES: 1. STORAGE SHED 16' WIDE X 24' DEEP WITH 8' HIGH WALLS 2. USE 2x4 CONSTRUCTION WITH SHEATHING AND SIDING 3. SIDING WILL RUN HORIZONTAL AND EXISTING BE PAINTED TO MATCH THE EXISTING PUMP STATION - USE 4" TRIM 4. ROOF WILL HIP FROM EAST TO WEST (LENGTHWISE) 5. DOOR WILL BE AT WEST END 6. EXHAUST FAN / VENT ADDED 7. ELECTRICAL TO BE TIED TO EXISTING GARAGE / OWNER TO PROVIDE MAINTAIN A MINIMUM OF 4'-6" BETWEEN BUILDINGS TO PROVIDE CLEARANCE FOR PALLETS ASPHALT EXISTING 3'X3' FOOTING--� _ BELOW PAD FOR FUTURE ARBOR \ EY�6':S'CID NEW STORAGE 8• . Ramp to I grade -. Slope as needed NOVEHICLESTORAGE'ONLY EQUIPMENT / TOOLS, SUPPLIES AND HOLIDAY DECORATIONS I 24'-0" re Horticulture Shed 10.10.12 SCALE: A"=t'-D' a Shingles to be GAF Timberline Natural Shadow or equivalent. Color to match existing garage. Owner to verify and approve color 30# Felt / " OSB Sheathing — l/ 1x6 Cement Board Fascia! 1x12 Cement Soffit Board Double top plate at all 2x4 Studs ® 16" O.C. I" OSB Sheathing Siding materials to be 12" Hardiplank /Cement Board with an 11" reveal —run horizontally and pointed to match the two existing structures. Roof vents to be installed per building code. 12 5 /— Engineered Header NEW STORAGE " Tong=constructionodhesive Add ramp to grade Screws at the entrance to be used00 wheel stored items 6 gauge corrosion resistant in and out. galvanized steel floor joists ®24"O.C. RAMP SHED TO BE PLACED ON GRADE. 1. Width to exceed Any additional foundation engineering door frame by required will be p6ided by contractor 3" on each at contractors expense. Check with side local building codes. 2. Material to be 24'-0" treated 2x oe7 material and SCALE: "=1'-0" SCALE: }"=V-0' NOTES: 1. All building construction to meet current building codes. 2. Contractor to pull required er i 3. Anchor building per City_ cod Horticulture Shed 10.10.12 Install vents on .North and South 12 Sides per code. .. �5 Pain t to match ing garage and cement board Demers floor joists will above grade. 24'-0" NEW STORAGE SHED North & South Elevations le 18'-4" "L L 16'-0" �, 303-0" EXISTING PUMP STATION NEW STORAGE SHED EXISTING GARAGE West Elevation Horticulture Shed 10.10.12 Scue: A"=t'—o' FACILITIES IZEQUISITION FORM VENDOR Finishing Touch DACE 10/19/12 REQBY: EthanCozzens WorkOrderil 011-448755 91-ANDINGCONIRRWO# U IARGF9� 703320564010 TOTAL COST: S 11,02750 BUYER Jolm Stephen OTY DESCRIPTION COST Provide all material and labor to provide a turnkey 16' x 24' shed with T tall walls per the attached back-up and Finishim-oTouch proposal dated 10/16112. S11,027.50 ADDITIONAL INFO COMPUTER INPUF INFORMATION: N7B\MR# REQUISITION II DATE ENI ERED: Finishing Touch PO Box 1303 Phone: 970-834-1764 Ault, CO 80610 Fax: 970-834-2734 Email: George@Finishingtouchnoco.com Date: 10-16-12 PROPOSAL TO: Ethan Cozzens Re: Horticulture Shed Thank you for the opportunity to bid this project: Below you will find our labor and material scope. Inclusions: 1. 6" corrosion resistant steel floor joists. 2. 23/32 T & G OSB for floor and ramp 3. 2 x 4 exterior walls 4. Engineered roof trusses S. 15/32 OSB for exterior wall sheathing 6. 19/32 OSB for roof sheathing (w/ H-clips) 7. GAF Timberline shingles 8. 30 Lb. roof felt 9. Drip edge 10. Building wrap 11. 12" Hardi siding 12. 5/4" Hardi trim 13. Hardi soffit and facia. 14. One (1) 6o 7o door with hard ware and weather stripping. 15. 2 coats of paint to match existing buildings in the area. 16. Permits (estimated) 17. Recycling and trash removal. Exclusions: 1. Electrical 2. Plumbing 3. HVAC 4. Interior finishes S. Drywall 6. Taxes Materials: 7% on materials (as per contract) Labor: Permit: Total: Add for 3/4" plywood in lieu of OSB: Add Ground treat plywood for ramp: $6,750.00 $472.50 $2,500.00 $1, 200.00 $10,922.50 $80.00 $25.00 Note: Permit cost is estimated and will be adjusted once contract is awarded. Thank you George Moore Date: 10/10/12 2145 Centre Avenue: Horticulture Shed Scope of Work: - Provide a turnkey 16'-0" wide x 24'-0" deep shed with 8' tall walls. - Provide 2-3'-0" x 6'-8" lockable metal doors and metal door frame similar to what is on the existing pump station. - Door hardware to match existing pump station. - Keying to match existing pump station. - Shed to sit directly on asphalt. - Contractor to shim shed, on asphalt, accordingly to provide a plumb/level/square product. - Contractor to match existing pump station and garage paint colors. Ramp to be constructed from 2x material and'/a" plywood and fastened to shed. - No electrical work needed. - Please see drawings for additional details. - Contractor to pull all necessary permits. - Contractor to meet all current City of Fort Collins Building Codes. - Contractor to. provide, at contractor's expense, any required engineering. - Contractor will need to fill out the attached "Tracking Form for Salvaged/Recycled/Waste Materials before final payment can be received. - Low bidder to coordinate starting date with owner. - Attached Drawings / Spreadsheets'provided to be bid from: o Building Department — Shed Requirements o Tracking Form for Salvaged/Recycled/Waste Materials o Horticulture Shed Plan dated 10/1/12 o Horticulture Shed Elevation dated 10/1/12 o Horticulture Shed Section dated 10/1/12 o Horticulture Shed Site Plan dated 10/1/12 Pricing due Tuesday,10/16/12 by 5:00 p.m. Total Cost: In Words: Date: 10/10/12 2145 Centre Avenue: Horticulture Shed Addendum #1: Please see attached revised drawings per our walk-through on 10/9/12. The revisions have been clouded for reference. - Attached Drawings / Spreadsheets provided to be bid from: o Building Department — Shed Requirements o Tracking Form for Salvaged/Recycled/Waste Materials o Revised - Horticulture Shed Plan dated 10/10/12 o Revised - Horticulture Shed Elevation dated 10/10/12 o Revised - Horticulture Shed Section dated 10/10/12 o Revised - Horticulture Shed Site Plan dated 10/10/12 - After further discussion internally, please bid on the drawings as is. A pole barn scenario will not be beneficial for the intended use of the building. - Contractor will not bid on any electrical work. - Soffit and fascia to match garage. - Use all cement board / hardiplank material for siding. - Contractor has the option to install either gable vents or roof vents. Whatever is needed to meet City of Fort Collins code requirements. - Tie -down system to meet City of Fort Collins code requirements. commdly bevrioplmff a servkes 2BlN. CANW Am= -ins, Fait Coffimih CO SOW 97L4"40t RESIDENTIAL DETACHED SHED HANDOUT REVISED IM10 � A PERMIT is REQUIRED FOR SHEDS THAT ARE HIGHER THAN OFT ATTHE ROOF PEAK AND/OR HAVE -A -FLOOR AREA LARGERTHAN 120 SQUARE FEETANDIOR LOCATED LESS THAN 3 FEET FROM PROPERTY LINE.. �- ANCHORALL COMERS TO GROUND FLOOR FRAMING PLAN 12 CLASS W SFJNGLES 16# FELT UNDERIAYMENT 7/16'OSS ROOF DECKING "CKBUILTROOF. RAFTERS 0 24- O.C. SEE SPAN CliART FUDGE BOARD ONE SZE LARGER THAN RAFTER I ER SPAN RAFTER TIES 0 48r O.C. SHOW THE FOLLOWING EXAMPLES: 204 WALL FRAMLNG.011rO.C. . VOS6'ExfERjoikwALiLsHEATHiNr. LAP SOM CONCRETE SLAB FLOW ML MAXIMUM RAFTER SPAN CHART 12" O.C. 16" O.C. 24" O.C. 7'-3" 6'-4" 2x6 12'-7" 11'-5" 9'-7" 2x8 16'-7" 14'-11" 12'-2" 2x10 21'-0" 18'-2" 14'-10" 2x12 24'-4" 21'-1" 17'-3" 2003 IRC table R802.5.1(5), hem fir#2 2x6 10'-0" 9'-1" 7'-11" 2x8 13'-2" 12'-0" 10'-2" 2x10 16'-10" 15'-2" 12'-5" 2x12 20'-4" 17'-7" 14'-4" 2003 IRC table R502.3.1(2), hem fir#2 I 10'-0' PROPERTY LINEZ � 3 �� t?WEE z GARAGE �o 11a-W PROPERTY UNE ° SAMPLE SITE PLAN SCALE 1"--29 Submittal RaclWraments for shaft 1. TWvo sets of plans of the proposed shed. Sea the had page as an ammpie of the plans you will need mit. to subThe plans do not have to be prohmbrg* drawn, nor computer generated, but must be neat. clean and legble. 2. Two sets of sate plans, drawn to scale, on paper no bigger ttran 8 W x 140, see example above. 8. Completed two-part applkation torte, evallable with other Buiidhg Services hen Louis at 281 N. College Ave or on the webstte www.tcAay.corn The ko irdbmu !!on requested on the appAcaffon must be cmWided In Ail 4. Completed Homeowr>el's AfRdrA if applicable (for homacwnem doing the constnrction). The form Is mapat Bulidstg Services, 281 N. College Ave. Rsauhyd hupecdons: Fnai hspsrfion W MAXIMUM JOIST SPAN CHART 12" O.C. 16" O.C. 24" O.C. Tracking Form for Salvaged/Recycled/Waste Materials Recycled or Diverted Material Summary Date Removed 1/1/2000 Material Recycled/ Reused/ Diverted Misc. Metals Amount/ Quantity 30 cu yds Receiving Party ABC Recycling Transportation Cost $100.00 Amount Paid or Received for Material. Total Disposal Cost/Savings (net) ($200.00) ($100.00) Landfill Material Summary ate Hauled Amount (tons orcubic yds) Landfill Tipping Fee Rental/Delivery/ Tax/Container Rental Total Disposal Cosp sal : 1 /1/2000 30 cu yds ABC Recyclina $245.00 $105.00 $350.00