HomeMy WebLinkAboutCHANGE ORDER - BID - 7405 TURNBERRY ROAD IMPROVEMENTS PROJECTCity of F,6 rt Cot -tins Engineerinn ` Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6606 970.221.6378 - fax Change Order Form PROJECT TITLE: Tumberry Rd. Improvements PROJECT NUMBER: 400901718 (Bid #7405) CONTRACTOR: Connell Resouces, Inc. (PO #9124395) CHANGE ORDER NUMBER: 1 n preparing change orders show In order as separate numbered paragraphs the toiiowmg: 1. Reason for change. 2. Description of change. 3. Change in contract cost 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will decrease by-$66,011.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL 0/a OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTEO BY:. kN REVIEWED BY: SUBMITTED BY: APPROVED BY: -2.83% -2.83% $2,329,248.20 $0.00 $0.00 ($66,o11oo) $2,263,237.20 DATE: / O/f Z TE: (ol5/IZ DATE: ( 0 _S " I Z DATE: Co ,-R-- l• Z-- APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File CHANGEORDERI Tum6orry Road Improvemant Projoct SUMMARY OF WORK riu.Mil I.M. a n,_u 11 Credit Flowfill from Base Bid 1 -1859 -Cy $ 55.00 102 245.00 2 Storm Drain Backfill with Hoe and Wheel Replace Excavated DirtIn Trench 1 1647 CY 1 22 $ 36,234.00 TOTAL REASON.FOR CHANGE Removed Flowfill from Contractfor Pipe Backfill WHEN POSTED Posted to Pay App #2 ($66,011.00) City of F6rt Collins Engineering Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 580 Fort Ca81ns, CO 80522.0580 970.221.6606 970.221,6378 - fax Change Order Form PROJECT TITLE: Tumberry Rd. Improvements PROJECT NUMBER: 400901718 (Bid#7405) CONTRACTOR: Connell Resouces, Inc. (PO #9124395) CHANGE ORDER NUMBER: 2 n prepanng Change orders show In order as separate numbered paragraphs the Touowing: 1. Reason forchange. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $50,324.00 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) $2, 329,248.20 $0.00 ($66,011.00) $50,324.00 2,16% -0.6T/ $2,313,661.20 ACCEPTED BY: V CJ"�-�� ---� DATE: (Contractor's Rebresentative) REVIEWED I SUBMITTED APPROVED APPROVED BY: DATE: (Purchasing Agent over $60,000) ca Contractor Purchasing ProjecLFlle t0' `5 -17— /v - g -CHARGE ORDER 2 Tumbany Road Improvement Protect 8NMMARYOPWORK RAM f! item 0imnlity ❑na III W1 TM.1 1 Install Storm Drain at Richard's lake and Tunrbe 1 LS $ 24,143.00 $ 24143.00 2 Switch Inlet 10C from Type R to Type 13 Inlet 1 LS 1400 $ 1,400.00 3 Connect Pipes to Inlets 1 LS 7568 $ 7,568.00 4 Gas Line Connict Resolution 1 LS 17213 $ 17,213.00 TOTAL $60,324.00 REA80NFORCHANGE Pipe was not shown in the as -bid Turnberry Road Plans. Further research due to a grading Issues at this comer revealed a pipe design that was inteded to be installed with the roadway improvements This inlet was modified to avoid a convict with Xcel high pressue gas line. Connect existing Inlet double 12" DIP storm drain pipe to new Inlets that are 4 feet lower and require 46' elbows and pipe to finish Modify storm drain system to accommodate Xcel high pressure gas line excavation requirements including additional utility potholing to identify conflicts. WHEN POSTED Posted to Pay App #Z