Loading...
HomeMy WebLinkAbout130905 DEIGHTON ASSOCIATES LTD - CONTRACT - AGREEMENT MISC - DEIGHTON ASSOCIATES LTDChristie White From: Jin Wang Sent: Monday, October 15, 2012 10:23 AM To: Christie White Cc: Rick Richter Subject: FW: Sidewalk Attachments: 2012 FTC Sidewalk and Ramp Integration.pdf Importance: High Christie, Please do a work order for Deighton from the ped needs funds. This is for Task 1, 2, 3 and 5 for a total of $ 25,680 Thanks. Jin r, DeAghi ton Sidewalk and Ramp Integration 2012=022 Fort Collins, CO. Prepared by: Gary Ruck, P. Eng. gary. ruck@d eig hton.corn Monday, August 13, 2012 p 0 (19 Deighton Associates Limited I stat-hy e «uot Orraek": ada L 1 IN TN. y>GF 5- O'rlos rot S; f,qf)5" 66 5 666!5 wx4?Wllt.3n cf�m Sidewalk -and Ramp Imcglatioil 2012-022 P,jVr.6;� 2 Of afthton Associates Limited 1 t St: ley Couri. 4r t L� �b'r, on- nu. Ca }ar.3 LPN 54%9 Tei tSD-5; a65 67C5 Fain (9051 6b5 uo :> vv .r. n :v,ntcn.cem Introduction Fort Collins has requested that Deighton Associates prepare a proposal for enhancement and expansion of their cITIMS CT asset management program to include sidewalk and ramp data that was recently collected by the City of Ft Collins. This proposal also includes an estimate to load your recently collected sidewalk data. This data will be reviewed and loaded into your clTIMS CT database. Since sidewalks are already included in your analysis, these analysis parameters will be reviewed and updated as necessary to reflect the new data. The goal of this proposed work is to further the development of dTIMS CT with an objective of expanding the amount of data stored, enhancing the access to that data and the decision support system within clTIMS CT. Another goal of this work is to define a level of service (LOS) for sidewalks and ramps and quantify the current LOS for the City and determine funding requirements to achieve the desired LOS. Figure 1 is a summary of the tasks related to training and the associated cost of each task. 4 5 r % Art ,....Site D`AL, I, :,DAL. , .Consultln , - �Otther -:7ravel rp . f' f 00, . [Totals�: Sidewalk and Ramp Inta ration Create Pers ectixe and Attributes for Sidewalk Data 0.5 $840-001 $840.00 Create Pers ecti%e and Attributes for Ramp Data 0.5 $840.001 $840.00 Load Sidewalk and Ramp Data 4 $6,720.00 $6,720-00 Update SMP Analysis Parameters in dTIMS CT to Incorporate Sidewalk and Rams 3 5 $15,120.00 $2,160.00 $17.280.00 Create Sidewalk Analysis Parameters in dTIMS CT 3 5 $16,120.00 $2,160.00 $17,280-00 Generate and Optimize Strategies for SMP and Sidewalks/Ramps 5 $8,400.00 $8,400.00 Review Program Recommendations 3 1 $8,400.OD $2,160.00 $10.560.00 Total Proposed Costi $61,920.00 Figure 1: Sidewalk and Ramp Integration Cost Proposal Summary SIdewalk and Rarni) lnte ; atior: 20S'-02d Vy(Ji= _ Ji S ❑eighton Ftssoclates Limited I Jtwt-,121 Cc f e; UrR I: WilitbY, Or! a; 1U, -: [130a L_N g!>y Tel. 0351 665 6,V15 =a., 90151665 66a5 .ru:;=.deigh t a n.wnl The above tasks that will be conducted by Deighton are described below. Task - Create Perspective and Attributes for Sidewalk Data This task will involve creating a perspective and associated attributes for the 2012 sidewalk data collected by FTC. Deliverables in this task are a clTIMS CT database with a perspective and attributes for sidewalk data. Task - Create Perspective and Attributes for Ramp Data This task will involve creating a perspective and associated attributes for the 2012 ramp data collected by FTC. Deliverables in this task are a dTIMS CT database with a perspective and attributes for ramp data. Task - Load Sidewalk and Ramp Data This task will involve reviewing the collected sidewalk and ramp data from FTC and then putting it in the format that dTIMS CT requires. Any anomalies will be reported and resolved. This task will require the linear and point feature classes that represent the sidewalk and ramp data respectively to be given route and measure data so that they can be loaded into dTIMS CT. Deliverables in this task is a dTIMS CT database loaded with the 2012 sidewalk and ramp data. Task - Update SMP Analysis Parameters in dTIMS CT to Incorporate Sidewalk and Ramps This task will create the sidewalk analysis parameters such as ancillary treatments and adjust as required prior to the analysis. This will then be used to augment the SMP pavement program. That is, trigger an ancillary sidewalk or ramp repair or replacement along with the pavement program if a sidewalk tripping hazard or non ADA compliant sidewalkkamp or a poor sidewalk/ramp is present. Deliverables in this task is a modified SMP pavement analysis that will help address known sidewalk issues as part of the pavement work program. Task - Create Sidewalk Analysis Parameters in dTIMS CT This task will create the sidewalk analysis parameters such as treatments, triggers, deterioration models and adjust as required prior to the analysis. If the sidewalk data supports this, queries can be created to identify problem sidewalk areas within the City such as tripping hazards or non ADA compliant locations. This task will look at Skdewalk and Romp 11'te ;.trot, 2032-02" Pag'e A of 5 Qeighton A scKiates Limited 11 Staley Cow, U.,!L i, VVMtb:, 'D;mi -:,oa L N SPA Te i. I905'. 665fibre F < 'SP5 6ES-6F•15 the sidewalks and ramps as assets unto their own and create analysis parameters specifically for them. This task will create the parameters to help determine the current Level of Service of the sidewalks/ramps and help determine the funding requirements to achieve the desired LOS for the City. Deliverables of this task are sidewalk analysis parameters and possibly queries to identify potential sidewalk "hot -spots". Task - Generate and Optimize Strategies for SMP and Sidewalks/Ramps This task will involve running the generate strategies and optimization steps in clTIMS using the newly loaded sidewalk and ramp data. Additional budget categories can be created in dTIMS if the City desires that are specific to sidewalk/ramp repairs. This way, during optimization it would be possible to have a budget specific to sidewalk/ramp repair activities. Deliverables in this task are a SMP construction program developed using the new sidewalk data and the City's desired budgets. A sidewalk/ramp work program will also be developed as part of this task and the current LOS along with funding levels will be determined as other deliverables of this task. Task - Review Program Recommendations This task will review the construction program recommendations from the previous step and identify any issues if there are any. These issues will be resolved and the program re -run if required. The program recommendations will be cblivered to the City and a map created showing the work program. Deliverables of this task are a set of program recommendations based on the City's budget scenarios. A map will be created showing the recommended work program. We look forward to your comments and direction with respect to this proposal. Sincerely, Gary Ruck, P. Eng. Engineering Manager. Ski,2waik and Ri nyi> IfAc;:ation 2012.022 Pans 5 o` 5