HomeMy WebLinkAboutWORK ORDER - RFP - P1123 GENERAL CONTRACTOR FOR FIRE STATION EXPANSION AND RENOVATION PROJECT (2)EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
ACTING AS AGENT FOR
POUDRE FIRE AUTHORITY
AND
DRAHOTA COMMERCIAL, LLC
DATED: September 26, 2012
Work Order Number: Admin; 2012
Poudre Fire Authority Board Resolution Number: 12-19
Project Title: PFA Admire Remodel
Commencement Date: September 26, 2012
Completion Date: December 26, 2012
Maximum Fee: (time and reimbursable direct costs): $31,716.00
Project Description: Administration remodel of fast floor entry and Fire Marshall office.
Scope of Services: As defined in the attached Standard Estimate Report from Dralnota dated 9/25/2012 w/o full time
superintendant
Exhibits part of this Agreement:
Exhibit B: List of Drawings and Specifications
Exhibit C: Standard Estimate Report from Drahota dated 9/25/2012
Exhibit D: Short Interval Schedule
Acceptance
Poudre Fire thorny /r
Service Provider agrees to perform the services reference, and Notice to Proceed is hereby given.
identified above and on the attached forms in
accordance with the terms and conditions contained
herein and in the Services Agreement
between the parties. In the event of a conflict between
or ambiguity in die terms of the Services Agreement
and this work order (including the attached forms) the
Services Agreement shall control.
Service Provider
By:--- -
Date:_-LqZ I /12-
The attached fors consisting of four (4) pages are
hereby accepted and incorporated herein by this
4/2001
Date: -42LA
Exhibit B
List of Drawings and Specifications
10/2/12
POUDRE FIRE AUTHORITY HEADQUARTERS REMODEL
FORT COLLINS, COLORADO
IDENTIFICATION
DESCRIPTION
DATE
Drawings
ARCHITECTURAL
A1.01
A1.02
A1.02
A1.03
Partial Floor Plan
Partial RCP
Partial RCP with Mechanical and Electrical Revision Notes
Service Counter
07.25.2012
07.25.2012
07.25.2012
07.25.2012
SPECIFICATIONS
Not Applicable
Page 1 of l
Exhibit C
PFA Station Headquarters
Base Bid
DRAHOTA
ESTIMATE
DATE:
9/25/2012
PROJECT :
PFA Station Headquarters
SIZE:
C -� [
LOCATION:
Fort Collins, CO
BLDG. TYPE:
Fire Station
ESTIMATOR:
Ashley Cooper
DESCRIPTION
QUANTITY UNITS
UNIT COST
TOTAL COST DIV.TOTALS
DIVISION
1 GENERAL REQUIREMENTS
4,640
Superintendant
40 HE
76.00
3,040
Project Engineer
20 HR
55.00
1,100
- Bond s Insurance
1 LS
500.00
500
DIVISION 2 DEMOLITION F SITE WORE
2.142
Interior Demo (labor)
24 MR
58.00
1,392
Dumpsters
1 LS
750.00
750
DIVISION 3 CONCRETE
0
N/A
0 CY
0.00
0
DIVISION 4 MASONRY
0
N/A
0 SF
0.00
0
DIVISION 5 METALS
NOTES
Based on a part time superiutendant, assuming station 6 kitchen
remodel will take place simultaneously
Fire marshal and lobby reception (walls, doors, frames, flooring,
ceiling tile, etc)
N/A
0 TN
0.00
0
DIVISION 6 CARPENTRY
5,8B9
New custom curved
reception
desk, relocate service counter over
Base Cabinets
1 LS
5,121.00
5,121
drawing rack, and
install 2
niches
Relocate existing
doors and
hardware, built in cabinets, and
Finish Carpentry
16 ER
48.00
068
drawing file.
DIVISION 7 THERMAL 6 MOISTURE
PROTECTION
0
N/A 0 SF 0.00 0
DRAHOTA ESTIMATE DATE:r 9/25/2012
PROJECT : PFA Station Headquarters SIZE: ram
LOCATION: Fort Collins, CO BLDG. TYPE: Fire Station
ESTIMATOR: Ashley Cooper
DESCRIPTION
QUANTITY UNITS
UNIT COST
TOTAL COST
DIV.TOTALS
NOTES
DIVISION B DOORS E WINDOWS
960
New door frame and reusing existing door and hardware at lobby.
Reinstall existing door frame, door, and hardware at fire
Doors, Frames,& Hrdw
1 EA
200.00
200
marshal's office.
Special Doors
16 HR
48.00
768
Remove and reinstall existing security overhead coiling door
DIVISION 9 FINISHES
10,248
New paint at all Fire marshal's Office walls, lobby/reception
walls, and new soffit. Price includes painting of new lobby door
Paint
1 LS
1,225.00
1,229
frame. Excludes painting of door..
Repair and replace suspended acoustical ceilings to match existing
Ceilings
1 LS
1, 200.00
1,200
as required at new and demo'd partition locations.
New walls at fire marshal office and lobby. Includes new soffit to
Drywall Partitions
1 LS
3,900.00
3,900
contain relocated overhead coiling door.
New rubber base at marshal office (all walls), lobby (walls North
Vinyl Base
1 IS
289.00
289
of stairs), and reception (all walla)
New walk -off carpet tile, based on C&A Abrasive Action, at lobby
Walk off Cpt Tile
1 LS
864.00
864
per plan
New carpet tile at Fire Marshal's office, based on Cambridge
Matrix, color Harmonic. New carpet tile at reception per plan,
Carpet Tile
1 LS
2,766.00
2,066
based on Cambridge Matrix, color Evolution.
DIVISION 10 SPECIALTIES
500
Signage 1 EA 500.00 500
DIVISION 11 EQUIPMENT
N/A 0 LS 0.00 0
DIVISION 12 FURNISHINGS 0
N/A 0 LS 0.00 0
DIVISION 13 SPECIAL CONSTRUCTION 0
MIA 0 SF 0.00 0
ALLOWANCE: Pin letter signage for above the reception desk
DRAHOTA ESTIMATE DATE: 9/25/2012
PROJECT : PFA Station Headquarters SIZE:;-'-�--i
LOCATION: Fort Collins, CO BLDG. TYPE: Fire Station
ESTIMATOR: Ashley Cooper
DESCRIPTION QUANTITY UNITS UNIT COST TOTAL COST DIV.TOTALS NOTES
DIVISION 14 CONVEYING SYSTEMS 0
N/A 0 LS 0.00 0
DIVISION 15 MECHANICAL 600
H.V.A.C. 1 LS 600.00 600 Balance existing HVAC system to accommodate new configuration.
DIVISION 16 ELECTRICAL 2,107
Electrical 1 LS 2, 107.00 2, 109
TOTALS: DIVISIONS 1 - 16 $27,094 27,094
OH a P 10 & $2,709 $2,709
GRAND TOTAL $29,603
POWER: Demo existing electrical at walls to be removed. Install 2
new outlets at reception desk area, and reconnect coiling door.
LIGHTING: Demo exiting switches at walls to be removed. Install at
new locations, and re -wire lights to be switched with new
configurations. Move 1 recessed can light to new location at
lobby. Provide and install 2 new track light kits (see attached
cut sheet) at lobby. Repair 5 existing fixtures in Reception and
Fire Marshal's office for full operation. Provide and install 2
new 24" fluorescent under cabinet lights at reception counter (see
attached cut sheet).
Estimate based
• Partial Reflected Clg. Plan (with meth and electrical notes), Partial Floor Plan, and Elevation at Service Counter all dated 7/25/12.
• we exclude builders risk insurance (carried by PFA)
We have included general and excess liability insurance
we exclude any building permit or inspection costs (N/A)
* Allowance pricing is indicated under notes
` We exclude any asbestos and lead paint testing, removal, or abatement
Budget assumes use of existing utilities (power and water) at no cost
• New walls and doors are all non -rated assemblies
* We have included sound insulation in the new walls
` We have included a signage allowance for pin letter above the reception desk.
` we exclude any structural demolition
* Estimate assumes all furniture NIC (including part time inspection office cubicles)
* Based on a part time superintendent, assuming station 6 kitchen remodel will take place simultaneously
*, Carpet tile has a 4 week lead time
DRAHOTA ESTIMATE
DATE:
9/25/2012
PROJECT : PFA Station Headquarters
SIZE:
":-
LOCATION: Fort Collins, CO
BLDG. TYPE:
Fire Station
ESTIMATOR:
Ashley Cooper
DESCRIPTION QUANTITY UNITS
UNIT COST
TOTAL COST DIV.TOTALS
NOTES
New North Hallway
OPTION: Install new Carpet Tile, based on Cambridge Matrix, color
carpet tile and
Harmonic, and rubber base at the hallway North of reception,
1)
rubber base ending at
1 LS
$588.00
$588.00
stopping at the expansion joint. Price includes demolition and
expansion joint
necessary transitions.
existing can lights and 1 relocated can light in
Re lampLED
2)
Re -lamp existing
1 LS
$439.00
$439.00
f4
OPTION:obby ods
lobby lights
Electrical hook up in
OPTION: Provide and install a 240 Volt, 30AMP, electrical hook up
3)
lobby for future
1 LS
$305.00
$305.00
for futurepedestalheater by lobby window
pedestal heater
Base board heater
OPTION: Provide and install a 2' electric base board heater with
4)
under reception desk
1 LS
$275.00
$275.00
integrated controller mounted underneath the reception desk
Full Time
OPTION: If the PFA Headquarters is a stand alone project, Drahota
5)
Superintendent
1 WK
$3, 344.00
$3,344.00
will require a full time superintendent.
OPTION: Upgrade to Sclorail light kit, model #LM-KB115, in lieu of
6)
_
Light Kit Upgrade
1 LS
$308.00
$308.00
model #LM-K9415 (included in the base bid). Price includes 2 light
kits and LED lamps instead of halogen
Short Interval Schedule
Exhibit D
Project: PFA Headquarters Remodel Project DATE: 10/2/2012
tvw�F Dcccmbc, 1 December
December
Activity Description
M
T
W
Th
F
IS
r,SrA
M
T
W
Th
F
1S1/
51
M
T
W
Th
Ir
r o, IS�
M
T
W
Th
F
,..�
26
27
28
29
30
3
4
5
6
7
C`j
C_�i
10
11
12
13
14
I_71
r-i
17
18
19
20
21
Sign Contract
Pre- Construction- 1 week
i
._�:�-�
• `Yi
4+
1
I
-
l.� :I
Submittals- 2 Weeks
Material Lead Time- 4-6 weeks after approved shop
drawings/submittals
I i
t
• 1
r =�
r
r 7
_
,
PFA Headquarters
I`=. �
..��
!, " l
r..'�
r.�j
I .�.t
} _7'
"1
�
1
Demo Walls, Ceilings and Floors
I'-�
�'3
'l ''�
r�l
x
x
f°`'�1
v
:'-h
f�.l
��-�
- j-�
Frame new walls and soffits
x
x
Electrical/Mechanical rough
L=:71...]
:'rl
'. 7
x
x
I�
i' .11-7
Ca 11
1
Hang, tape and, finish drywall
x
!-f�
L "
x
x�]r_)
( 1
Paint
A)
x
F I;
'I
Install Casework
Install doors and hardware
U-3
r--9
f'P a
I'1
I : °I
t++.4]
�' _ 1
_^.d
x
x
x
Install coil door
@
; ."i
I. 1
[_,
14=.]
1•
x
x
,. 1
t
M
V
Install carpet
x
x
ry -1EI
Lof
6�^i
Owner Equipment
t J
NZ 1
I
I
J
x
!_:'J
L :]
Final Clean
i'.�i
'a
',-7�'+'—i
C-�JC�`�J
<1C:�5
x
E".fir:-A
PFA Headquarters schedule 10.2.12