Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9125332FACILITIES REQUISITION FORM �\2533 L VENDOR Acoustics & Interiors Inc. REQ BY: Ron Kechter Work Order# 448276 DATE 10/1/12 ANDING CONTRR WO # CHARGE# 510108.535010 TOTAL COST: $25,013.00 - BUYER: John Stephen OTY DESCRIPTION COST Provide all labor, materials & equipment for the procurement and installation of the acoustic wall panels for 1 the Digital Dome at the Museum of Discovery, per your Proposal dated 9/27/2012; cost plus NTE. $25,013.00 Installation October 15-19. 2012. COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: Proposal Acoustics & Interiors, Inc. 1414 Blue Spruce Drive, Unit E Fort Collins, CO 80524-5424 Phone (970)493-3660 Fax (970)224-1568 Email Jim@Aandt.us City of Fort CollinsProject: Museum of Discovery Dome (Estimator: limi F Ron Kechter !Start Date: il: Address: iCompletion: 11/1/12: 9/27/2012 City / State: iPlan Date: 'Spec Date: - Section(s): Acoustical Wall Panels Addenda_ _ Scope: Provide labor, material, supplies and equipment necessary / or as stated herein, according to plans and specifications ' referenced above. ' Units Description Total' 1,118 ISF Wall Tech Custom Curved Wall Panels - Momentum "Hue" color Black - $25,013 Base Bid: $25,013 Alternate(s): Alternate Total: ,Including: :Excluding: 'Notes: Seller: Acoustics & Interiors, Inc. By. �.�..-. Yvv •-za Jim Mitts, President Buyer:- City of Fort Collins Date: September 27, 2012 Date: www.AandLus Sole Source Justification for Procurement of the Acoustical Wall Panels for the Digital Dome @ FCMOD Acoustics and Interiors Inc. was chosen for this procurement because of past experience with them in installing fabric covered acoustical panels at the Police Services Facility. A&I was chosen also because they are local and could spend the time in performing actual exceptionally detailed measurements of the curved walls and soffits that require acoustical panels. Additionally, these measurements had to be done in a very short timeframe while the knee wall was being constructed in the Digital Dome by Hensel Phelps Construction Company before September 6`", so the long lead fabric could be ordered. Additional precise measurements had to be taken after the knee wall and soffits were complete so that the curved panels themselves could be ordered so they could be on site for installation October 15-19, 2012. This installation date is critical to the Grand Opening date of the Museum of Discovery on November 10, 2012. The Proposal had to come after all of the precise measurements so A&I could get a final quote from Wall Tech for production of the panels. Accordingly, request your approval of this request for sole source procurement of these acoustical wall panels from Acoustics and Interiors Inc.