HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICESPROFESSIONAL SERVICE AGREEMENT
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CTL THOMPSON, INC
DATED: JANUARY 04, 2012
Work Order Number: CTL - Sheely - 2012
Purchase Order Number:
Project Title: Sheely Subdivision Water and Sewer Improvements — Phase I
Commencement Date: September 3 2012
Completion Date: November 1 2012
Maximum Fee: Not to exceed Eighteen Hundred Thirty Dollars and Zero Cents ($1830.00)
(time and reimbursable direct costs)
Project Description: Geotechnical Services
Scope of Services: See Attached Scope of Work
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions contained
herein and in the Professional Services Agreement
between the parties. In the event of a conflict
between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the Professional
Services Agreement shall control.
The attached forms consisting of two (2) pages are
hereby accepted and incorporated herein, by this
reference, and Notice to Proceed is hereby given.
Professional:
By:��(
Title: — tl c
stdwopsa rev 3/12
CITY OF FORT CO LINS
Approved By:
t�aSaye, S cial Njects Manager
Date:
Reviewed By:
Date:
Approved By:
Jon Haukaas, Water Engineering and
Field Operations Manager
Date:2-
7
•'•� I N� O i V O Y A T i D
August 28, 2012
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
Fort Collins, Colorado 80522-0580
Attention: Mr. Dean Saye
Subject: Fee Estimate for Construction Observation
and Materials Testing Services
Sheely Subdivision Water and Sanitary Sewer Improvements
Whitcomb Street, south of Prospect Road
Fort Collins, Colorado
Proposal No. FC-12-0285
At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction
Observation and Materials Testing services for the Sheely Subdivision Water and Sanitary Sewer
Improvements project located on Whitcomb Street south of Prospect Road in Fort Collins, Colorado.
We appreciate your time spent on the phone to discuss the scope of the project.
We anticipate that the city will use our estimate for the basis of establishing a budget for the project
and to issue a purchase order for our services. Our estimated scope of services and associated
fees were prepared according to the terms and conditions of our professional services agreement
with the City of Fort Collins and are presented below.
Earthwork: Compaction testing will be required for utility trench backfill. We understand the project
will last approximately 5 days. We estimate two site visits per day for a total of 10 site visits.
Engineering Technician 10 days x 2 hrs/day x $60/hr $1,200.00
Standard Proctor 3 tests x $80/ea $240.00
Atterberg Limits 3 tests x $60/ea $180.00
Gradation 3 tests x $70/ea $210.00
Subtotal: $1,620.00
TOTAL ESTIMATED FEE: $1,830.00
It should be emphasized that this estimate is based upon assumptions of actual quantities and
contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for
tests and observations requested by the owner, contractor or subcontractors who schedule the
services.
351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524
Telephone: 970-206-9455 Fax: 970-206-9441
T
If we can be of further assistance, please contact us at your convenience.
Very truly yours,
CTL I THOMPSON, INC.
Heather Grubb
Field Department Manager
CITY OF FORT COLLINS
SHEELY SUBDIVISION WATER AND SANITARY SEWER IMPROVEMENTS
CTL I T PROPOSAL NO. FC-12-0285