Change Order Form
PROJECTTITLE: N. College Rd. Improvements
PROJECT NUMBER: 400903900.6 (Bid 07213)
CONTRACTOR: Connell Resouces, Inc. (PO #9116026)
CHANGE ORDER NUMBER: 10
n preparing change orders show in order as separate numbered paragraphs the tollowmg:
1. Reason for Change. 2. Description of change.
3. Change In contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will increase by $14,540.50
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$6,111,000.00
TOTAL APPROVED CHANGE ORDERS
$56,650.20
TOTAL PENDING CHANGE ORDERS
$0,00
TOTAL THIS CHANGE ORDER
$14,640.60
TOTAL % OF THIS CHANGE ORDER
0.24%
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
$6,182,190.70
(Assuming alf change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
North College - Vine to Conifer
x.+
t_
U�tS�MMAOWM,.M.x.
,
`;{-
Item
Quantity
Unit
$ / Unit
Total
Contract Bond
1
LS
$ 133.00
$ 133.00
202-00200
Removal of Sidewalk
2
SY
$ 120.00
$ 240.00
203-01597
Potholing
4
Hr
$ 135.00
$ 540.00
206-0000
Structure Excavation
5
EA
$ 60o.00
$ 3,000.00
206-00200
Structure Backfill (Class 2)
5
EA
$ 445.00
$ 2,225.00
601.
Concrete Class D - Footing, Re -Steel, Anchor Boll
5
EA
$ 1,210.00
$ 6,050.00
608-0006
Concrete Sidewalk (6 Inch)
2
SY
$ 33.00
$ 66.00
613
1" Electrical Conduit Sweeps
5
EA
$ 135.30
$ 676.50
626
Mobilization
1
LS
$ 1,610.00
$ 1,610.00
Total Cost
$ 14,540.50
REASON P.Q21CHANGE a s -' ;' f {` — q
�?f a �. .. »35ifr _r€uP kl a's:::?Y,...m.°.�'!.3zdk%-S
Foundations for the APP - Special Pedestrian Lighting were not included in the contract because the APP monuments
had not yet been approved for construction by CC. The design for the foundations had not yet been completed.
Planning, Development & Transportation
�/
G1t,7 p�
Enjlneering
Forf '®pins
281 North College Avenue
P.O. Sox 580
_
nglneering
Fort Collins. CO80522.0680
970.221.6605
970.221.6378 - fax
Change Order Form
PROJECT TITLE N. College Rd. Improvements
PROJECT NUMBER: 400903900.6 (Bid #7273)
CONTRACTOR: Connell Resouces, Inc. (PO#9116026)
CHANGE.ORDER NUMBER: 11
n preparing change orders show in order as separate numbered paragraphs the Tonowing
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change In contract time.
1&2. See attached sheet for detail.
3. The contract cost will Increase by $3,709.80
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
0.06%
1.23
$6,111,000.00
$56,650.20
$14,540.50
$3.709.80
$6,185,900.50
ACCEPTED BY: ^' c� --� DATE: 1 / L I l
(Contractor's Repre entative)
REVIEWED BY: DATE:
(Engine f1
SUBMITTED BY:
APPROVEDBY: UN11111LL DATE:
1(f5epartment Head)
APPROVED BY:
(Purchasing Agent over $60.000)
cc; contractor
Purchasing
Project He
DATE:
alx�-�v".,,.� .a�.=...•� �=GHANGE;ORDEFi11���t: _�'>`. r.��� ���"ar�s�.`�..-�
North College - Vine to Conifer
F�z'a.>SUMMARY.,OFVYOFtK
Item
Quantity
Unit
$/Unit
Total
1
Roy's Quick Lube Sign Light Repair
1
LS
$ 861.30
$ 861.30
2
Trouble Shoot Zalli Motors Lighting
1
LS
$ 638.87
$ 638.87
Non -returnable waterline lowering
3
materials(12")
1
LS
$ 1,265.00
$ 1,265.00
Survey Request for as -built west
4
control and gutter lip
1
LS
$ 944.63
$ 944.63
Total Cost
$ 3,709.80
_ v
'
st2 PA
��
1. Lighting at Roy's Quick Lube was disconnected for unknown reasons. Project will pay to trouble shoot and
reconnect lighting.
2. Zalli Motors stated that parking lot lighting failed due to construction. Contractor was directed to inspect and
trouble shoot the issue. Inspection determined it was not project related, no repairs completed.
3. A 12" waterline lowering was shown in the plans and Connel ordered materials. The waterline turned out to be
an 8" line. Connell could not return the modified pipe casing, insulators and end seals for restocking.
4. City directed ConnelVKing Survey to shoot control elevations on the west side sawcut line and prepare asbuilt
info on the gutter lip for redesign by Stolfus.