HomeMy WebLinkAboutCHANGE ORDER - BID - 7273 N COLLEGE IMPROVEMENTS PROJECT - VINE TO CONIFERI FCitv Oort Collins Planning, Development & Transportation 28gNorth College Avenue P.O. Box §80 Engin Bering Fort Collins, CO 80522.0580 910.221.8805 970.221.6378- fax Change Order Form PROJECTTITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid 07213) CONTRACTOR: Connell Resouces, Inc. (PO #9116026) CHANGE ORDER NUMBER: 10 n preparing change orders show in order as separate numbered paragraphs the tollowmg: 1. Reason for Change. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by $14,540.50 4. There will be no change in contract time. ORIGINAL CONTRACT COST $6,111,000.00 TOTAL APPROVED CHANGE ORDERS $56,650.20 TOTAL PENDING CHANGE ORDERS $0,00 TOTAL THIS CHANGE ORDER $14,640.60 TOTAL % OF THIS CHANGE ORDER 0.24% TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $6,182,190.70 (Assuming alf change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File North College - Vine to Conifer x.+ t_ U�tS�MMAOWM,.M.x. , `;{- Item Quantity Unit $ / Unit Total Contract Bond 1 LS $ 133.00 $ 133.00 202-00200 Removal of Sidewalk 2 SY $ 120.00 $ 240.00 203-01597 Potholing 4 Hr $ 135.00 $ 540.00 206-0000 Structure Excavation 5 EA $ 60o.00 $ 3,000.00 206-00200 Structure Backfill (Class 2) 5 EA $ 445.00 $ 2,225.00 601. Concrete Class D - Footing, Re -Steel, Anchor Boll 5 EA $ 1,210.00 $ 6,050.00 608-0006 Concrete Sidewalk (6 Inch) 2 SY $ 33.00 $ 66.00 613 1" Electrical Conduit Sweeps 5 EA $ 135.30 $ 676.50 626 Mobilization 1 LS $ 1,610.00 $ 1,610.00 Total Cost $ 14,540.50 REASON P.Q21CHANGE a s -' ;' f {` — q �?f a �. .. »35ifr _r€uP kl a's:::?Y,...m.°.�'!.3zdk%-S Foundations for the APP - Special Pedestrian Lighting were not included in the contract because the APP monuments had not yet been approved for construction by CC. The design for the foundations had not yet been completed. Planning, Development & Transportation �/ G1t,7 p� Enjlneering Forf '®pins 281 North College Avenue P.O. Sox 580 _ nglneering Fort Collins. CO80522.0680 970.221.6605 970.221.6378 - fax Change Order Form PROJECT TITLE N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO#9116026) CHANGE.ORDER NUMBER: 11 n preparing change orders show in order as separate numbered paragraphs the Tonowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $3,709.80 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) 0.06% 1.23 $6,111,000.00 $56,650.20 $14,540.50 $3.709.80 $6,185,900.50 ACCEPTED BY: ^' c� --� DATE: 1 / L I l (Contractor's Repre entative) REVIEWED BY: DATE: (Engine f1 SUBMITTED BY: APPROVEDBY: UN11111LL DATE: 1(f5epartment Head) APPROVED BY: (Purchasing Agent over $60.000) cc; contractor Purchasing Project He DATE: alx�-�v".,,.� .a�.=...•� �=GHANGE;ORDEFi11���t: _�'>`. r.��� ���"ar�s�.`�..-� North College - Vine to Conifer F�z'a.>SUMMARY.,OFVYOFtK Item Quantity Unit $/Unit Total 1 Roy's Quick Lube Sign Light Repair 1 LS $ 861.30 $ 861.30 2 Trouble Shoot Zalli Motors Lighting 1 LS $ 638.87 $ 638.87 Non -returnable waterline lowering 3 materials(12") 1 LS $ 1,265.00 $ 1,265.00 Survey Request for as -built west 4 control and gutter lip 1 LS $ 944.63 $ 944.63 Total Cost $ 3,709.80 _ v ' st2 PA �� 1. Lighting at Roy's Quick Lube was disconnected for unknown reasons. Project will pay to trouble shoot and reconnect lighting. 2. Zalli Motors stated that parking lot lighting failed due to construction. Contractor was directed to inspect and trouble shoot the issue. Inspection determined it was not project related, no repairs completed. 3. A 12" waterline lowering was shown in the plans and Connel ordered materials. The waterline turned out to be an 8" line. Connell could not return the modified pipe casing, insulators and end seals for restocking. 4. City directed ConnelVKing Survey to shoot control elevations on the west side sawcut line and prepare asbuilt info on the gutter lip for redesign by Stolfus. 1�M =-Mlhl POSTED "� a Fa p )I a"tioni#8tg = 3 f