HomeMy WebLinkAboutCHANGE ORDER - BID - 7366 HARMONY ROAD MAINTENANCE PROJECT - COLLEGE AVE TO TIMBERLINE RDPlanning, Development & Transportation Citt�'7`' of Engineering ®FW 281 North College Avenue P.O. Box 560 Engineering Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax .Change Order Form PROJECT TITLE: Harmony Rd. Maintenance Project (College/Timberline) PROJECT NUMBER: 902310 (Bid #7366) CONTRACTOR: Martin Marietta Materials (PO #9122742) CHANGE ORDER NUMBER: 10 n preparing change orders Show In order as separate numperea paragraphs the rouowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 281,010.43 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) Xv ACCEPTED BY: (Co tr ctoe;,;,n,a,,epe) REVIEWED BY: (Engineer) SUBMITTED BY: (Project Manage)) APPROVED BY: Tart t Head) b APPROVED BY: �/ (Pu7ing Agent over $60,000) cc: Contractor Purchasing Project File 13.73% 18,86 % $2,047,316.21 $105.094.62 $0.00 $281,010.43 $2,433,421.26 DATE: / , / Z-- TE: DATE: I f o ( I DATE: Q-IL-12. DATE: 9 r� Z City of F6rt Collins HARMONY ROAD MAINTENANCE PROJECT (College to Timberline) Change Order #10 Justification City o1 Fort Collins • Capital Projects Tim Kemp 09110112 Change Order #10 Justification -n Contract ltem � Recone :Chan e.Order_ -.... "€.:di;"_„ Item # 202-11 Additional 4" Milling in the Harmony and Lemay area, as directed by the City Item # 202-13 Additional Taper Planing in the College to Boardwalk area, as directed by the City Landscaped Median Backfill at Harmony Road and Union Pacific crossing, as directed by the City due to not Item # 207-02 enough available on -site material Additional Placement of Base Material in the median widening areas (Boardwalk to Wheaton and McMurry to Item # 304-01 Innovation) with soft pavement edges and / or deeply cracked areas, as directed by the City Placed an extra 1/2" of Material from College to JFK, JFK to Boardwalk and Lemay to MCMurry (adding 2,100 Tons). The intersections of Harmony with Boardwalk and Lemay, placed an extra 1"of material (adding 700 Tons), as directed by the City. The material weighed 112 pounds per square yard and was estimated at 108 pounds per Item # 403-01 square yard(adding 670 Tons). Additional Placement of "SG" Material in the median widening areas with soft pavement edges and / or deeply Item # 403-03 cracked areas, as directed by the City Additional Hours, as directed by the City, deemed necessary for the safety of the travelling public, the safety of the Ilom # 630-03 workers and material delivery. A majority of the Hours wme during the tandem paving days. • CONTRACT, SUMMARY. -� Initial Contract Amount $2,047,316.21 Change Orders #1 -#9 $105,094.62 Change Order#10 $281,010.43 Total Adjusted Contract Amount $2,433,421.26 Change Order Percent Difference 18.86% John Stephen From: Jim O'Neill Sent: Friday, August 31, 2012 2:20 PM To: Timothy Kemp; John Stephen Cc: Dean Klingner; Rick Richter Subject: RE: Harmony Maintenance Project Ok then I'm ok with these changes. Proceed to process the change order. From: Timothy Kemp Sent: Friday, August 31, 2012 2:18 PM To: Jim O'Neill; John Stephen Cc: Dean Klingner; Rick Richter Subject: RE: Harmony Maintenance Project That's correct Jim. Tim Kemp Capital Projects From: Jim O'Neill Sent: Friday, August 31, 2012 2:18 PM To: Timothy Kemp; John Stephen Cc: Dean Klingner; Rick Richter Subject: RE: Harmony Maintenance Project How much of the 18.8% of change orders can we tie back to unit prices originally bid by the contractor is that 13.7%? From: Timothy Kemp Sent: Friday, August 31, 2012 1:47 PM To: Jim O'Neill; John Stephen Cc: Dean Klingner; Rick Richter Subject: Harmony Maintenance Project Jim - Per a phone conversation with John earlier this week, I am providing an explanation for the cost overrun on the above mentioned project. The following is a detailed explanation regarding the Contract overrun for Bid #7366 "Harmony Road Maintenance Project" as awarded to Martin Marietta Materials in the amount of $2,047,316.21. Change Orders #1 through #8 were additional work items added to the original Contract. These Change Orders are approved to date and are listed as follows: • CO #1 through #4 $ 80,488.40 Paid with Pay App #1 and #2 • CO #5 through #8 $ 24,606.22 To be paid with Pay App #3 TOTAL $105,094.62 The Total Adjusted Contract Amount was revised to $2,152,410.83. The Change Order percentage for the above items equals 5.1% of the original contract. Change Order #9 was a net zero, administrative Change Order to change $22,274.35 from the Harmony Maintenance Fund to the Street Maintenance Program. Change Order #10 is for the reconciliation of quantity under run and overrun based upon the line item pricing per the original Contract. Item #403-01 "Hot Mix Asphalt Grade S" • The City estimated 13,030 Tons of material at a bid price of $61.45 per Ton. • The post -construction analysis between the City, the design consultant and the Contractor shows that the area on Lemay, north of Harmony, was not included in the bid tab which added 300 Tons • The College to JFK stretch of road was profile milled from curb to curb in both directions because the existing cross slope was flatter than 2%. We placed an average of 2.5" of asphalt back in this stretch, as opposed to the design of 2", which added 400 Tons. • The JFK to Boardwalk stretch of road also had a substandard cross slope. We placed an average of 2.5" of asphalt back in this stretch, as opposed to the design of 2", which added 500 Tons. • The intersections of Harmony Road with Boardwalk and Lemay were constructed with an average of 3" of asphalt to amend existing drainage issues and ride quality issues. This added 400 Tons. • We placed 2.5" of asphalt back from Lemay to McMurry to address various pavement deficiencies; as opposed to a 4" mill and inlay which we used for correction between College and Lemay. This added 900 Tons. • The northern and southern tie-ins at McMurry were extended to rehabilitate areas in need of repair. This added 300 Tons. • The estimated weight of the material (specific gravity) prior to bidding was figured as 108 pounds per square yard. The actual weight of the placed material was 112 pounds per square yard. This added 670 Tons to the total • In total, we added 2,800 Tons to the Contract and an additional 670 Tons due to the weight of the material. The final Asphalt Grade S quantity was 16, 470 Tons. At $61.45 per Ton, the cost overrun was $211,516.43. Item #403-02 "Hot Mix Asphalt Grade SG" • The City estimated 7,000 Tons and the final amount totaled 5,828 Tons. At $56.90 per Ton, the cost under run was ($66,685.09). • The under run for this quantity was offset by additional, City approved "Hand Patching" areas (see below) Item #403-03 "Hot Mix Asphalt Hand Patching' • The City estimated 500 Tons and the final amount totaled 1,618 Tons. At $79.15 per Ton, the cost overrun was $88,458.04. • The additional Tons were approved by the City and deemed necessary to mitigate areas where we had a soft pavement edge and / or deeply cracked areas through the pavement section • The pavement material placed with "Hand Patching" was the Grade SG mix • When combined with Item #403-02 from above, the net difference is $88,458.04 - $66,685.09 = $21,772.95 of overrun Item #630-03 "Flagging' • . The City estimated 1,200 Hours and the final amount totaled 3,418.5 Hours. At $21.65 per Hour, the cost overrun was $48,030.53 • The additional Hours were approved by the City and deemed necessary for the safety of the travelling public, the safety of the workers and to allow material delivery • The City under estimated the number of hours to be used, especially on top mat paving days where the Contractor used tandem pavers When added these four items together the net change order is: ra Item #403-01 "Hot Mix Asphalt Grade S" Item #403-02 "Hot Mix Asphalt Grade SG" Item #403-03 "Hot Mix Asphalt Hand Patching" Item #630-03 "Flagging" TOTAL: $211,516.43 ($66,685.09) $ 88,458.04 $ 48,030.53 $ 281,319.91 (13.7% of the original Contract) All other pay items in the Contract, other than the four listed above, reconcile to a net ($309.48) When the overrun / under run items are combined with the additional work items approved in Change Orders #1 through #8, the project grand total is: Original Contract Amount Change Orders #1 - #8 Change Order #9 Change Order #10 Total Adjusted Contract Amount $2,047,316.21 $ 105,094.62 $ 0 $ 281,010.43 $2,433,421.26 (18.8% of the original Contract) This project was completed using 2 approved pay apps with the third pending the approval of change order #10. Funds are available to cover the overrun expense which consists of Harmony Maintenance Funds and BOB Intersection Funds. Please let me know if you have any questions. 1 will wait for a response to this. j usti ficati on summary before proceeding with Change Order #10. Tim Kemp, PE Capital Projects Engineer City of Fort Collins 970.416.2719 tkemp(@fcgov.com