HomeMy WebLinkAboutBID - 7382 MAX BRT SOUTH TRANSIT CENTER (5)ADDENDUM No. 5
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7382: MAX BRT South Transit Center
OPENING DATE: 3:00 PM (Our Clock) May 31, 2012
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Revisions to the Specifications
Exhibit 2 – Revisions to the Plans
Please contact John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 5 – 7382 MAX BRT South Transit Center Page 1 of 4
EXHIBIT 1 –REVISIONS TO THE SPECIFICATIONS
1. Section 01030 ALTERNATES
Paragraph 1.02 Description of Alternates.
Make the following corrections to Alternate No. 1 (Add):
1. All surrounding wall construction, including the sliding glass service window,
Door 106A, temporary infill wall construction where the future glass display case
is located.
2. Aluminum counter shutter #106B.
3. Remove this item from work to remain in the base bid as the stainless steel hand
sink is intended to be a part of the alternate.
2. Section 07610 PREFINISHED MECHANICALLY-SEAMED METAL ROOFING
Paragraph 2.01 Prefinished, architectural mechanically-seamed metal roofing, Part G
Add: Metal Sales Manufacturing Corporation as an approved manufacturer
3. Section 07432 TERRA COTTA FACADE PANEL SYSTEM
Paragraph 2.01 Exterior Terra Cotta Facade Panel System, Part M
Add the following to the list of approved manufacturers:
a. Terreal North America
b. Cladding Corp
c. Avenere Cladding LLC
It is the responsibility of the contractor to ensure that products bid for this project will
meet the Federal Transportation Administration's Buy America requirements. All design
and engineering costs and/or additional materials associated with substituting the
specified product/ system shall be the responsibility of the contractor.
4. Section 02755 DETECTIBLE WARNING STRIPS
Add the attached specification to the construction documents.
Addendum 5 – 7382 MAX BRT South Transit Center Page 2 of 4
EXHIBIT 2 – REVISIONS TO THE PLANS
1. Sheet P1.1 – Change lavatory L-1 to L-2 in TOILET 116 and TOILET 117.
2. Sheet P3.1 – Add Lavatory L-2 to the plumbing fixture Schedule. L-2 shall be a Kohler K-
2196-4, white countertop mounted lavatory. The faucet and notes (less note 7) shall be the
same as L-1.
3. Sheet P3.1 – Delete the verbiage in keynote 8 (Meet ASTM E-84) on the Plumbing Fixture
Schedule.
4. Sheet P3.1 – Revise the verbiage from 12 second to 10 seconds in keynote 11 for LEED on
the Plumbing Fixture Schedule.
5. Sheet A8.0 and Sheet A8.1 - Reference the attached sheets for corresponding keynote
legends.
6. Sheet A8.0 Detail B2 - Remove 'MAX' from the dimension string. Finished counter top height
to be 2'-10" above finished floor.
7. Sheet A8.0 Details A2, and A3. The countertops in rooms TOILET 116 and TOILET 117 are
to be positioned such that the top of the sink rim (not the countertop) is located at 2'-10"
after finished floor.
ATTACHMENTS
Sheet A8.0 and A8.1 Keynote Legends
Addendum 5 – 7382 MAX BRT South Transit Center Page 3 of 4
Addendum 5 – 7382 MAX BRT South Transit Center Page 4 of 4