Loading...
HomeMy WebLinkAboutBID - 7382 MAX BRT SOUTH TRANSIT CENTER (5)ADDENDUM No. 5 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7382: MAX BRT South Transit Center OPENING DATE: 3:00 PM (Our Clock) May 31, 2012 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revisions to the Specifications Exhibit 2 – Revisions to the Plans Please contact John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 5 – 7382 MAX BRT South Transit Center Page 1 of 4 EXHIBIT 1 –REVISIONS TO THE SPECIFICATIONS 1. Section 01030 ALTERNATES Paragraph 1.02 Description of Alternates. Make the following corrections to Alternate No. 1 (Add): 1. All surrounding wall construction, including the sliding glass service window, Door 106A, temporary infill wall construction where the future glass display case is located. 2. Aluminum counter shutter #106B. 3. Remove this item from work to remain in the base bid as the stainless steel hand sink is intended to be a part of the alternate. 2. Section 07610 PREFINISHED MECHANICALLY-SEAMED METAL ROOFING Paragraph 2.01 Prefinished, architectural mechanically-seamed metal roofing, Part G Add: Metal Sales Manufacturing Corporation as an approved manufacturer 3. Section 07432 TERRA COTTA FACADE PANEL SYSTEM Paragraph 2.01 Exterior Terra Cotta Facade Panel System, Part M Add the following to the list of approved manufacturers: a. Terreal North America b. Cladding Corp c. Avenere Cladding LLC It is the responsibility of the contractor to ensure that products bid for this project will meet the Federal Transportation Administration's Buy America requirements. All design and engineering costs and/or additional materials associated with substituting the specified product/ system shall be the responsibility of the contractor. 4. Section 02755 DETECTIBLE WARNING STRIPS Add the attached specification to the construction documents. Addendum 5 – 7382 MAX BRT South Transit Center Page 2 of 4 EXHIBIT 2 – REVISIONS TO THE PLANS 1. Sheet P1.1 – Change lavatory L-1 to L-2 in TOILET 116 and TOILET 117. 2. Sheet P3.1 – Add Lavatory L-2 to the plumbing fixture Schedule. L-2 shall be a Kohler K- 2196-4, white countertop mounted lavatory. The faucet and notes (less note 7) shall be the same as L-1. 3. Sheet P3.1 – Delete the verbiage in keynote 8 (Meet ASTM E-84) on the Plumbing Fixture Schedule. 4. Sheet P3.1 – Revise the verbiage from 12 second to 10 seconds in keynote 11 for LEED on the Plumbing Fixture Schedule. 5. Sheet A8.0 and Sheet A8.1 - Reference the attached sheets for corresponding keynote legends. 6. Sheet A8.0 Detail B2 - Remove 'MAX' from the dimension string. Finished counter top height to be 2'-10" above finished floor. 7. Sheet A8.0 Details A2, and A3. The countertops in rooms TOILET 116 and TOILET 117 are to be positioned such that the top of the sink rim (not the countertop) is located at 2'-10" after finished floor. ATTACHMENTS Sheet A8.0 and A8.1 Keynote Legends Addendum 5 – 7382 MAX BRT South Transit Center Page 3 of 4 Addendum 5 – 7382 MAX BRT South Transit Center Page 4 of 4