HomeMy WebLinkAboutBID - 7382 MAX BRT SOUTH TRANSIT CENTER (3)Addendum 3 – 7382 MAX BRT South Transit Center Page 1 of 3
ADDENDUM No. 3
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7382: MAX BRT South Transit Center
OPENING DATE: 3:00 PM (Our Clock) May 24, 2012
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Revised Bid Schedule
Please note that the Bid Schedule has also been attached as a separate
Microsoft Excel file.
Please contact John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 3 – 7382 MAX BRT South Transit Center Page 2 of 3
EXHIBIT 1 – REVISED BID SCHEDULE
TOTAL COST
South Transit Center ls Fixed Price
South Transit Center - Park and Ride CDOT Project # - STL M455-103; Code - 18325
ITEM # PAY ITEM Item CONSTRUCTION DESCRIPTION QTY UNIT UNIT PRICE TOTAL COST
620.01 Field Office 01A General Conditions 1 ls
626.01 Mobilization 01B Construction Service Fee 1 ls
202.01 Removal of Structures & Obstructions 02A Selective demolition 1 ls
201.01 Clearing & Grubbing 02B Site excavation 1 ls
203.03 Retention Pond 02B Retention Pond (1/2) 1 ls
208.01 Silt Fence 02B Silt Fencing 458 lf
208.02 Erosion Log 02B Erosion logs (1/2) 320 lf
206.01 Storm Drainage Excavation 02B Storm Drainage (1/3) 150 cy
206.02 Storm Drainage Backfill 02B Storm Drainage (1/3) 150 cy
624.01 18" Inch Drainage Pipe - On-Site 02C Storm drainage - 18" RCP (1/2) 351 lf
624.01 18" Inch Drainage Pipe - Off-Site 02C Storm drainage - 18" RCP (1/2) 241 lf
604.02 Manhole 02C Manholes, vaults and lids 1 ea
604.03 Manhole Ring & Cover 02C Manholes, vaults and lids 1 ea
604.04 Drop Box Outlet 02C Drop Box Outlet (1/2) 1 ea
623.01 Sprinkler Irrigation System 02D Sprinkler Irrigation 1 ls
212.01 Seeding & Landscape Acessories 02D Seeding & landscape acessories 1 ls
214.01 Shrubs & Plants 02D Shrubs & Plants 1 ls
214.02 Tree- 2.5" Ornamental 02D Ornamental trees - 2.5" 2 ls
214.03 Tree- 3" Shade 02D Shade Trees - 3" 42 ls
215.01 Transplant Tree 02D Transplanted conifers 5 ea
608.01 Pipe Bollards 02D Pipe Bollards 4 ea
506.01 Riprap 02D Rip Rap at storm drainage pond (1/2) 150 cy
403.01 Hot Mix Asphalt- Grading SG (top) Parking 4" 02E Asphalt Paving 4" 1,177.2 ton
304.01 Aggregate Base Course 8" Compacted 02E Aggregate Base Course 8" Compacted 5,450 sy
403.02 Hot Mix Asphalt 9" Patching 02E Paving & patching on Fossil Blvd (1/2) 137.3 ton
608.01 Concrete Sidewalk 03A Sidewalks 617 sy
608.02 Concrete Curb Ramp 03A Curb Ramp 78.5 sy
609.01 Curb & Gutter 03A Curb & gutter 1,970 lf
613.01 Site Lighting 16A Site lighting 1 ls
Emergency Phone 16B Emergency Phone 1 ls
CDOT Project # - 7PT SW00-720; Code - 17295
Park and Ride Total
Addendum 3 – 7382 MAX BRT South Transit Center Page 3 of 3
ls Fixed Price TOTAL COST
Alternate No. 1 Add
Alternate No. 2 Add
Alternate No. 3 Add
Alternate No. 4 Add
Alternate No. 5 Add
Alternate No. 6 Deduct
Alternate No. 7 Add
In
Words
Item Unit Price
1 sf
2 sf
3 cy
Asphaltic Concrete Pavement, 4" Thick
Imported Structural Fill Material, Placed and Rough Graded
South Transit Center Unit Prices - Specification Section 01022
Description
Reinforced Portland Cement Concrete Pavement, 9" Thick
South Transit Center Alternates - Specification Section 01030
South Transit Center, Park and Ride and Alternates BASE BID TOTAL
Alternates Total