Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9124738City of F6rt Collins Memorandum Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 N � % UY 970,221,6605 ., ,/ c 970.221.6378 - fax L fcgov.correngineering To: Jim O'Neil, Director of Purchasing and Risk Management From: Terry Tyrrell, Consultant Project Mane & Erika Keeton, Special Projects Engineer Date: August 21, 2012 i Re: MAX BRT — Requisition Request City of Fort Collins Light and Power Department Relocation of Duct Bank and Provide Power to Proposed Stations including Capacity Fees The City of Fort Collins Light and Power Department (City L&P) must be utilized as sole source for the relocation of the major electric duct bank (Spring Creek to Drake Street) in conflict with the MAX BRT guideway. Additionally, the City L&P will provide power to all of the proposed bus stations as part of the MAX BRT project. All the local power distribution in Fort Collins is owned and operated by City L&P and are obviously the most qualified and familiar with the project parameters. The City L&P Department will utilize their crews, equipment and materials that they typical utilize to implement relocations and new services. The City L&P ' Department began the electric duct bank relocation effort in 2011 based on pre -award authority from the FTA to do early utility relocation efforts in support of the Project. The pre -award authority authorized the City to incur costs for early utility work and request reimbursement once the Project Construction Grant Agreement (PCGA) was authorized. In May of 2012, the PCGA was awarded to the City by the FTA. As such, the City L&P Department is requesting reimbursement for their costs to date and the needed costs to complete the electric connections to the stations as estimated in the their original proposal from 2011. The City's L&P Department cost estimating systems are proprietary based on the City's usage, fees and previous project data. As the City is a public agency, the Light and Power Department has low overhead costs and are ultimately responsible for the maintenance of the infrastructure and public safety. I have included the cost estimates for the duct bank relocation and power connections to the stations provided by the City's L&P Department in support of the Independent Cost Estimate (ICE). A breakdown of costs was prepared by the City L&P Department in 2010 and is attached. In reviewing the City's L&P work necessary for the BRT Project and their initial estimate and discussing their estimating procedures and support documentation we found the proposed cost to be reasonable. NO LIGHT HERE NM 250 I/OT 2* :# 6D. J-I/UP 4' IN CONCI I/OT a, II AnRIGATICI By jCjCONTROL FrED, LEE E C. C 1250 HPS/X \HFS 250 3-1 1/0 MHOO IN CONC O 3-1/0P 4- j." 1000 MH MH 1/OP 4- sc L, >-�IL7A 46955 150 AIWAY SP46951 Fort Collins I recommend that the requested budgets of $400,000.00 for the relocation of the duct bank and $250,000.00 be approved as project expenditures, which total $620,000.00 for the City L&P Department purchase order relative to the MAX BRT Project. Gwof Fort Collins Independent Cost Estimate City of Fort Collins Utilities Two Way Conversion Signing and Striping Date of Estimate: 1-Nov-11 Contract Type: T&M Existing Contract or PO (Y/N): Y Descriptlon of Goods (A) or Services (B): Work Includes relocation of the utility duct bank from Spring Creek to Drake Road that is conflict with the BRT proposed infrastructure and providing power to the proposed station and does not include capacity fees. Areas are in the City rights of way and and these utility improvements are and will be owned and operated by the City Light & Power Department therefore they must be utilized as sole source for this effort. As the City of Fort Collins Light and Power Department costs are proprietary, we have included the cost estimates for the duct bank relocation improvements and providing power to the bus stations provided by the Light and Power Department as part of this ICE provided by the City's L&P Department. I have obtained the following estimate from; Published Price List / Past Pricing (date) Engineering or Technical Estimate (performed by) City of Fort Collins Light and Power Department Independent Third Party Estimate (performed by) Other (specify) Cost Estimate Details: (Estimate calculated in US Dollars) Cost of Services, Repairs, or Non -Standard Items Itemlfask: Materials or Work Description Other Direct Costs Labor Rate ($) Labor Hours Labor Class Allocated Overhead SG&A' Profit TOTAL Duct Bank Relocation $ 400,000.00 $ 400,000.00 Station Relocation including Ca acit fees $ 220,000.00 $ 220,000.00 ota f'�cOiM1J, tieneml ene P4mYnMmirve Espenses Signature of Preparer: t C�f3t Estimate Summary Workorder Number: Workorder Title BRT Duct Bank Estimate Material Added (WO) $ 173,134.19 Total Material + 15% Warehouse $ 199,104.32 Total Material Returned (WO) $ Total Direct Charge Materials $ 104,465.13 Labor Costs $ 194,058.58 Total Labor + 48.43% Benefits $ 288,041.15 Total Equipment Costs (WO) $ 19,301.73 Total Labor, Extemal,WhseMaterial & Equip $ 610,912.31 Total + 15% Contingency $ 702,549.16 Total Cost + 15% ES & GA $ 807,931.53 Labor Cost/$28.44 (WO)Hrs 6,823.44 Z/ Estimate Summary Workorder Number: Workorder Title BRT Stations Material Added (WO) $ 28,050.98 Total Material + 15% Warehouse $ 32,258.62 Total Material Returned (WO) $ Total Direct Charge Materials $ 477.00 Labor Costs $ 68,379.26 Total Labor + 48.43% Benefits $ 101,495.34 Total Equipment Costs (WO) $ 9,195.32 Total Labor, Extemal,WhseMaterial & Equip $ 143,426.28 Total + 15% Contingency $ 164,940.22 Total Cost + 15% ES & GA $ 189,681.25 Labor Cost/$28.44 (WO)Hrs 2,404.33 �vY et � , av-- ) SP �4508 3 /Lao \WS rP4 m 1/07 F-I cr\l �,D 204 202 E :> �110 s -1 3-1 3/OP 4' 45812n2 3-1 it LAUREIII ST - A-L - 6 ' ' 1 4} I � i I o 7 A' x Z � pPtiAf� ip�• �'>_'_ _ Ytw 0 I M 19 117 isY°P®� II I= tot HOWES sr a 117 ST 13E �h( 138 Y