Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9124718Work Order Number: Purchase Order Number: _ Project Title: r_' Commencement Date: n Completion Date: i2 Ll EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND DATED: Gr\ 1`1a�S i 2 Maximum Fee: (time and reimbursable direct costs): 5 2 5 �' ( v Project Description: C^� =T1^� Cr-�r�re�c.. , -� %.�. �• — 91zq-7 W c �? Scope of Services: CC�n 5�w 0-C tbr,c� Q-A C, }� . ;,' r T -Tr, I % C � ^ Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibits _, _ _ consisting of _ U pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins s Submitted By: I� CVA Q L I P oje t Mama qer Date: el ! Ct 1 Z Reviewed by: Senior Utility Engineer Approved by: Utilities General Manager Date: Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 ■ Phone: (970) 223-3151 Fax: (970)223-3191 Estimator: RolandTrembte BUDGET FOR COST Date: 8/1/2012 Submitted To: City Of Fart Collins - Natural Resources Budget Title: Pelican Marsh Trail Connection Address: Fort Collins, CO Budget Number: Project Location: Pelican Marsh Open Space Contact: Ryan Kogut Project City, State: Fort Collins, CO Phone: 970416-2206 Fax: 970-416-2211 Engineer/Architect: We have prepared for your information the following items for budget evaluation purposes for the referenced project This budget Includes conceptual quantities, resource casts, scope -of -work and schedules and therefore may not completely represent all items of work or cost ultimately necessary for completion of the project This budget was prepared using reasonable skill and judgment, buys not an offer to perform the Work described. Item # Item Description Estimated Quantity Unit Unit Price Total Price A. General Conditions 00-100 Mobilization / Permits Fees 00-110 Dewatering If Needed 00-175 Pothole Existing Utilities If Needed 00-180 Surveying Allowance (may Be Included In Design Services) 00-185 Geotechlncal Testing (Allowance May Be Covered Under City Contract With CTLThompson) 1.00 EACH $3,520.00 $3,520.00 0.25 WK $2,260.00 $565.00 4.00 HR $182.00 $728.00 1.00 LS $825.00 $825.00 1.00 LS $1,100.00 $1,100.00 Total Price for above A. General Conditions Items: $6,738.00 B. Removals 22-205 Remove Concrete Flatwork 6" To Allow For Grade Changes On The Existing Trail C. Erosion Control 29-100 Silt Fence 29-102 Straw Bale Dike 29-106 vehicle Tracking Control If Needed 29-108 Concrete Washout 29-200 Seed And Mulch Allowance D. Earthwork 160.00 SF $5.95 $952.00 Total Price for above B. Removals Items: $952.00 600.00 LF $1.30 $780.00 1.00 EACH $135.00 $135.00 1.00 EACH $735.00 $735.00 1.00 EACH $1,050.00 $1,050.00 0.25 ACRE $2,750.00 $68750 Total Price for aboveC. Erosion Control Items: $3,387.50 23-101 Strip And Stockpile Topsoil (assumed Double Width Of Trail At 6" Thick, All Material To Be Replaced On Slopes 23-130 Unclassified Excavation Assumed Double Area Of Trail At 1 Ft Depth Cut To Fill Onsite Only 23-175 Muck Excavation Assumed For 20 Ft X 40 Ft X 2 Ft Deep Remove Muck Replace With Road Base For Stable Subgrade 23-215 Fine Grade Concrete Sidewalks 27-150 Replace Strippings On Sides Of Trail F. Storm Drain 02-128 24" RCP Storm Drain 02-129 24" RCP FES 02-200 Rip Rap D50=9", Type L Includes Bedding Not Fabric Assumes The Rip Rap Is Buried Color Is Red 02-201 Rip Rap D50=12", Type M Includes Bedding Not Fabric Assumes Rip Rap Is Buried Color Is Red 190.00 CY $4.15 $788.50 380.DO CY $4.15 $1,577.00 60.00 CY $40.70 $2,442.OD 5,110.00 SF $0.58 $2,963.80 190.00 CY $4.15 $788.50 Total Price for above D. Earthwork Items: $8,559.80 84.00 LF $58.70 $4,930.80 4.00 EACH $575.00 $2,300.00 5.00 CY $77.10 $385.50 37.00 CY $79.50 $2,941.50 Total Price for above F. Storm Drain Items: $10,557.80 Pelican Marsh Trail Connection Page 1 of 2 Item * Item Description Estimated Quantity Unit Unit Price Total Price I. Concrete Flatwork 608-08 Colored Concrete Bike Path (5" Fibermesh) (Yosemite 5,270.00 SF $4.30 $22,661.00 Brown) Total Price for above J. Concrete Flatwork Items: $22,661.00 Total Bid Price: $52,856.10 Notes:. Pricing is based upon plan entitled "Pelican marsh trail connection exhibit" . The following are excluded from this proposal: Drainage facility certification; Warrantee period in excess of one year; Street cleaning for work performed by others; Maintenance of erosion control devices; prairie dog removal, relocation, or exterminator. • Material Prices for pipeline Items are guaranteed for a period of 30 days from the Date shown on the top of thls quote. After 30 days the material prices may change the unit prices quoted. . Please provide a minimum of 2 weeks advanced notification of work requests to allow for scheduling the work, No work will be completed without a signed Purchase order. Frost removal or winter protection Is not included. If requested, It will be billed either on a time and material basis or a lump sum amount that is mutually agreed apon. • Environmental site assesment/ Mitigation of hazardous or contaminated materials is excluded. • Performance and Payment bond is excluded but can be Included for 1% of Contract value Pelican Marsh Tall Connection Page 2 or 2