Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7273 N COLLEGE IMPROVEMENTS PROJECT - VINE TO CONIFER (6)I - I Flirt of Englneerin �, Planning, Development & Transportation Engineering 251 North College Avenue P.O. Box 580 Fort Collins, CO 80522-0560 870.221,6605 970.221.0378 - tax Change Order Form PROJECT TITLE: N. College Rd. Improvements PROJECT NUMBER: 400903900.6 (Bid #7273) CONTRACTOR: Connell Resouces, Inc. (PO 49116026) CHANGE ORDER NUMBER: 9 n preparing c ange orders show in order as separate -numbered paregrapris the following: 1. Reason for change.' 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1 &2. See attached sheet for detail. 3. The contract cost vAll increase by $1,769.66 4. There will be no change In contract time. ORIGINAL CONTRACT COST $6,111,000.00 TOTAL APPROVED CHANGE ORDERS $53.880.64 TOTAL PENDING CHANGE ORDERS WOO TOTAL THIS CHANGE ORDER $1,769.56 TOTAL % OF THIS CHANGE ORDER 0.03% TOTAL C.O. % OF ORIGINAL CONTRACT 0.91% ADJUSTED CONTRACT COST $6,166,650.20 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: I SUBMITTED BY: APPROVED BY: APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File %- 7.7' 0 CHANGE ORDER 9 North College - Vine to Conifer SUMMARY OF WORK Item Quantity Unit $ / Unit Total Bore 2" Electric Conduit 170 LF $ 18A5 $ 3,085.50 2" Electric Conduit Material 190 LF $ 1.21 $ 229.90 Pothole Existing Utilities 3 EA $ 165.00 $ 495.00 Contract Bond 1 LS $ 16.16 $ 16.16 613 Credit - 2' Elec. Conduit (Pedestrian) -170 LF $ 12.10 $ (2,057.00 Total Cost $ 1,769.56 REASON FOR CHANGE Contractor could not trench excavate for 2" conduit installation due to concrete paving in the alley not shown in the plans. Proposed boring 170 LF of conduit under the alley paving. WHEN POSTED Pay Application #7