Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (3)of 12g6 1? 9 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL THOMPSON DATED: August 10, 2012 - 400gowoo Wo•k Order Number: 01-404943492-12 Project Title: Troutman Underpass Project Coin mencementDate: July 15,2012 Completion Date: January I, 2012 Maximum Fee: (time and reimbursable direct costs): not to exceed $ 19,390 (quoted price minus rebar inspection fee r 10% contingency) Project Description: Provide Material Testing for Troutnnn-Underpass Project. Scope of Services: Perform all items as priced on attached quote dated 7/23/2012. Set -vice Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provider Date: q -\ D - 12 Approved By:. — Purchasing Agent over $60,000 The attached forms consisting of three (3) pages me hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collin By` Date: 3-to-I Z CTL.I THOMPSON C>t1':t fJ'i t )`,fad r c Cl�:l t7 1 a_i ,t1 July 23, 2012 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Mark Laken Subject: Fee Estimate for Construction Observation and Materials Testing Services Troutman Parkway Bicycle/Pedestrian Underpass Under BNSF Railroad Federal Aid Project No. AQC M455-089 Construction Project Code 16526 Fort Collins, Colorado Proposal No. FC-12-0258 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Troutman Parkway Bicycle/Pedestrian Underpass Under BNSF Railroad project located at Troutman Parkway and Mason Street in Fort Collins, Colorado. We reviewed the plans prepared by the City of Fort Collins dated January, 2012 in preparation of our proposal. We anticipate that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for culvert subgrade, culvert backfill, headwall/wingwall backfill, retaining wall backfill, sidewalk subgrade, ramp subgrade, stair subgrade, and bike trail subgrade. We estimate a total of 40 site visits will be necessary for this project. We further estimate 4 proctors and 20 gradation/atterbergs will be necessary. Engineering Technician 40 days x 2 hrs/day x $60/hr $4,800.00 Modified Proctor 1 tests x $80/ea $80.00 Standard Proctor 3 tests. x $80/ea $240.00 Atterberg Limits 20 tests x $60/ea $1,200.00 Gradation 20 tests x $70/ea $1A00.00 Subtotal: $7,720.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Reinforcina Steel Observation: Reinforcing steel observation may be required for the culvert, ramps, headwalls/wingwalls, retaining walls, and stairs. We estimate 36 site visits will be necessary for this project. Engineering Technician 36 site visits x 1.5 hr/visit x $50/hr 0 .A6 Subtotal: ,$00. 0", Concrete Testing: Concrete testing will be required for the culvert, sidewalk, ramps, headwalls/wingwalls, bike path, retaining walls, and stairs. We estimate 52 concrete tests consisting of 5 cylinders each will be necessary, We further anticipate that we will be requested to test the percent air content for approximately 26 additional trucks during concrete placement. Concrete Cylinders 52 tests x $160/test $8,320.00 Additional Cylinders 52 tests x $10/test $520.00 Testing of Additional Trucks 13 hours x $50/hr $650.00 Subtotal: $9,490.00 ]AT: We understand that the City will use CTL Thompson for the IAT for this project, which will I nclude the following tests. Concrete Cylinders Additional Cylinders Soil Compaction Testing Atterberg Limits Gradation 1 test x $160/test $160.00 1 test x $10/test $10.00 1 day x 2 hrs/day x $60/hr $120.00 1 test x $60/ea $60.00 1 test x $70/ea $70.00 Subtotal: $420.00 Ir TOTAL ESTIMATED FEE: aa3z- .4 l 1 630 + 104 It should be emphasized that this estimate is based upon assumptions of actual quantities and Car+rlri�.,�., contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for i� tests and observations requested by the owner, contractor or subcontractors who schedule the ° 'Iq�3?q services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CITY OF FORT COLLINS TROUTMAN PARKWAY SICYCLFIPEDESTRIAN UNDERPASS. CTL I T PROPOSAL NO. FC•12.0268