Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7289 FOSSIL CREEK TRAIL AT STANTON CREEK (2)PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: 2. Description of Change: CHANGE ORDER NO.2 Fossil Creek Trail at Stanton Creek Walsh Construction, Inc. 7269 9116848 Description of change ,,7 Restabiliization of subgrade under proposed trail due to unforeseen wetland subgrade material and bridge changes that required Removal and replacement of concrete at bridge #3, due to changes in #3 bridge elevation. 1) Remove and Replace of Concrete North of Bridge #3 $ 5,296.00 2) Added 201 SF of Wall $ 3,553.68 3) Additional Stabilization Work Sta.11+00-26+00 $ 18,188.40 4) Added 1' Additional Height to Privacy Fence $ 500.00 5) Added Sub Drain and Rock Mulch Behind Concrete Wall $ 1,500.00 North of Bridge #3 3. Change in Contract Cost: $ 27,016.08 4. Change in Contract Time: 15 Days TOTAL APPROVED CHANGE ORDER $ 46,13228 TOTAL PENDING CHANGE ORDER $ - TOTAL THIS CHANGE ORDER S 27,016.08 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 5.82% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 15.77% ADJUSTED CONTRACT COST S53T,088.36 (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative }{�.t T V4M%Ah ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc City Clerk acNW Contractor Ergkxw Prolect FIk Pumhasing DATE: Fs, C' jZo t z DATE: Aa /Z DATE: DATE: DATE: CITY OF FORT COLLINS REQUISITION VENDOR: Walsh Construction Inc. VENDOR #: 05c)55E,& ADDRESS: 8139 Open View Place PHONE #: DATE ENTERED: 8/6/2012 REQ #: _jzd52-, FOR: FC Trail at Stanton Creek BID #: Loveland, CO 80537 INSTRUCTIONS: 970-622-8227 FAX #: 970-278-9396 VENDOR CONTACT: MattWalsh QUANTITY DESCRIPTION TOTAL PRICE CHARGE NUMBER 1 See Attached Change Order $27,016.08 271700700.563040.6 Proposal AUTHORIZED SIGNATURE / 7 Project Manager John Stephen From: Craig Kisling Sent: Monday, August 20, 2012 10:40 AM To: John Stephen Subject: Fossil Creek Trail at Stanton Creek Over 15% John, Here is an email in regards to Change Order #2 and for the overrun of 15% of the total cost of Fossil Creek Trail at Stanton Creek Project. The cause for the large amounts in the Change Orders is due to the unforeseen amount of stabilization of wetland material encountered with the project. The original contract has a line item for stabilization that we tried to anticipate for, but unfortunately the construction excavation ran into bad areas well outside those anticipated areas . The contract line item is for $50/CY of material removal and placement of structural material. Matt Walsh of Walsh Construction Inc. charged $40/CY to do the work covered in the Change Orders, giving the City a reduced cost because of the amount of unforeseen material encountered. Let me know if you need any more information or have any additional questions, Thanks so much, Craig Craig M. Kisling, ALA City of Fort Collins 0:970.221.6367 C: 970.222.5933