Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P1116 SH 392 I25 INTERCHANGE (3)9-- City Qrt • (Tf pLmpppv®�� ®L`t �� Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 680 Engineering Fa Collins, CO 80522.058O 970.221.6605 970.221.6378 -fox Change Order Form PROJECT TITLE: 1-25 & SH392 Interchange & Improvements PROJECT NUMBER: 400901900.0 CONTRACTOR: AECOM, Inc. (PO #8855819) CHANGE ORDER NUMBER: 6 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change In contract time. 1 &2. See attached sheet for detail. 3. The contract cost will Increase by $ 9,766.12 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved_) APPROVED BY: AECOM, Inc. APPROVED BY: 11.22% 165.83% $87,031.50 $134,559.00 $0.00 $9,766.12 $231,356.62 DATE: F/1y/2-0i L DATE: ' I Ul/Y u FL. UU111113 -- G1l I10011nd F II UjGuL wlgpoac, APPROVED BY: DATE: e—Z4 12— Town of Windsor APPROVED BY: DATE: Purchasing Agent over $60,000 w: Contractor Changs'Ofde'8 CPurchasing lry C Project File .183.01 To W Wso AECOM Mr. Rick Richter City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Dennis Wagner, P.E. Director of Engineering Town of Windsor 301 Walnut St. Windsor, CO 80550 AECOM 303 376 2900 tel 71717° Street, Suite 500 303 376 2999 fax Denver, CO 80202 www.aecom.com Subject: SH 39211-26 Interchange LandscapinglSigns Dear Rick and Dennis, February 1, 2012 Enclosed is the final invoice for AECOM services that are split between the City of Fort Collins and Town of Windsor. This invoice covers services for this project as follows: Median Landscaping/Irrigation, and Entry Sign Concept Design We have completed the following work under this funding: • Prepared sign concept plan, character images, birds eye sketches, powerpoint presentation, and cost estimate for entry sign concept. 2 Wall Design and Interchange Ramp Landscapingllrrigation • Potential Landscaping Enhancements — Prepared birds eye sketches, cost estimate, supporting images, and powerpoint presentation outlining potential additional intersection improvements • Prepared open house boards • Construction support activities regarding contractor coordination regarding the wall and median construction including, working with wall contractor to review acceptable stone type, colors; reviewing a list of and visiting stone quarries with the contractor; and follow-up documentation with contractor with preferred images of stone samples and shapes. Any further construction support will be provided through CDOT. Yours sincerely, Alan Eck an, P.E., PTOE Project Manager 303-376-2979 ASCOM 717 Seventeenth - Suite 500 Denver, Colorado 00202 Phone: 1303376.2900 Federal Tax ID:95-2661922 Remittance Address: AECOM Technical Services, Inc. 1178 Paysphere Circle Chlcaao. IL 60674 Invoice Attn: Mr. Rick Richter City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80621 60194659 AECOM INVOICE NO: 37205448 Company Name: AECOM Technical Services Inc. Work Order Numbers: 01.400901900.11 Address: 71717th Street, Denver CO 80202 Invoice Date: February 1, 2012 Project Location: SH 39211-26 Interchange Landscape Coordination Progress Recort pate: February 1, 2012 %Completed: 110.79% BASIC ANDIOR TASK CONTRACT TOTAL S 90 629.00 Prior Period Billing Amount JTD : $ 87,069.11 Current Billing Period: October 1 2011 Through December 30 2011 Current Period Total Amount Job To Date DIRECT LABOR b 11,649.57 S 98,060.32 OTHER DIRECT COSTS E 1,677.40. $ 2,234.75 SUBTOTAL k 13,226.97 6 100 295.07 OUTSIDE SERVICES SUBCONSULTANTS ONLY) 5 9 TOTAL CURRENT PERIOD is 13.226.97 s 100,286.07 I certUy that the billed n a a t I and In agreement with the contract terlila. Project Manager . Z 2=o r Z Signature Title Data Federal Tax ID: 95-2861922 717 Seventeenth - Suite 500 Remittance Address: AECOM Technical Services, Inc. Denver, Colorado 60202 1178 Paysphere Circle Phone: 1403. TO.2900 Chicago, IL 60874 Project Number: 60194669 Work Order Number: 01-400901900-11 October 1, 2011 Through December 30, 2011 City of Fort Collins Engineering Current Period DIRECT LABOR - - 6 6,824.79 OTHER DIRECT COSTS 788.70 SUBTOTAL f 8,013.49 OUTSIDE SERVICES SUBCONSULTANTS ONLY) S TOTAL CURRENT CHARGES DUE BY CITY OF FORT COLLINS ; 9,613.49 Town of Windsor Current Period DIRECT LABOR E 5,02A.79 OTHER DIRECT COSTS S 786,70 SUBTOTAL .E 9,913A9 OUTSIDE SERVICES SUBCO SULTANTS ONLY) $ TOTAL CURRENT CHARGES DUE BY TOWN OFWINDSOR $ 6,913AS