i. Reason fordlange: Please reference Classic Contractors C.O.R. dated June 10, 2012.
2 Desciipbon of change:Add an electrical outlet and hose bibb to the north exterior :Nall.
3. Change in contact cost: This % ill increase the contract cost by $808.
4. Change in contract time: No.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST'
__- S_13s,870.00
TOTAL APPROVED CHANGE ORDERS
_ Ss,nso.on
TOTAL PENDING CHANGE ORDERS
SO.00
TOTAL_ THIS CHANGE ORDER
S808.00
TOTAL % OF THIS CHANGE ORDER 0-59%
Total C.O. % of Original Contract 4.29%
ADJUSTED CONTRACT COST
_ S142,738.00
all
ACCEPTED BY:
ACCEPTED BY: _t2!�
Project
:a/all �-
Representative t/-
a:
Date
Print M'imo ate
APPROVED BY: _
Print Name
cc: City Cled< Project File
Contactor Purd-osing
Engineer
Date
P.O. I 3ox 2 79S
Lovodmd. C.0.80531)
97(6227-295 1
970 37 1 - 100-1
Junc 10 201-'
0" 4 Fmi (VHW,
73 12 Rosckm n 011 - icc 13 It i ld i
E'diall cozzcll>
( "mys:
I , Ntki 01COMMI 111"10 io muh Wo CXL Olt& All S 195 Mo
2. Acid WISC hillb to 1101111 NiLIC Of [Mildillct. Add S 613.00
Add w:111: oll, c;!I I)CI at cillry. III:Iit:ri:il lle
Ov. nt.I: ix, I ct,;l