Loading...
HomeMy WebLinkAboutRESPONSE - RFP - 7392 CIVIL ENGINEERING DESIGN DRAFTING & SURVEY SERVICES ON-CALLpopry - ISP .00 �j AECOM II. Organization Chart / Resumes Education/Registrations Corey Lang, PE M.B.A., University of Colorado, 2004 Roadway/Civil B.S., Civil Engineering, South Dakota School of Mines and Technology, 1999 PE/Colorado, No. 38117, 2003, and CA, ID, MT, WA Corey has 13 years of progressive transportation engineering experience with federal, state, and municipal clients across the western United States. He has delivered several projects requiring CDOT local agency approvals. Corey has specific experience in roadway design; utility coordination; traffic control plans; traffic signal design, storm drainage design; environmental permitting, public involvement, agency coordination; project management; and construction administration. Simple Complex Project Manager for US 34/47th Avenue In- » Huron Street Widening, Project Manager for recon- tersection Improvements, Greeley, CO (Local struction and widening of two miles of roadway to a Agency project) 6-lane arterial standard. » Project Manager for Arapahoe Road/Clinton » 23rd Avenue, Greeley, CO, Project Manager for wid- StreeUBoston Street Intersection Improvements, ening and intersection improvements for'/4 miles and Greenwood Village, CO (Local Agency project) 4 intersections near Greeley Mall » Project Manager for Belleview/Quebec Street » Jepson Parkway, Solano CA, Project Manager for Intersection Improvements, Greenwood Village, widening and realignment of eight miles of 4-lane CO (Local Agency project) urban arterial. Education/Registrations Lisa Candelaria, PE BS, Civil Engineering, University of Arizona, 2004 Traffic/Planning PE/Arizona, Registration No. 50302, 2009 Lisa is a Traffic Engineer and has seven years of experience in engineering design and analysis. Lisa has worked on various projects involving transportation corridor planning and analysis, traffic modeling, Level of Service analysis, crash analysis, traffic impact studies, traffic design of work zone traffic control, signing and marking design, and roundabout analysis and design. She has worked on projects for various municipal, county, and DOT clients throughout Colorado and Arizona. Simple Mesquite Solar Energy Generation Facilities, Arizona - Traffic impact analysis including pro- jected future site traffic impacts and site con- struction impacts. » City Center Airpark, Arizona - Traffic impact analysis including trip generation, trip distribu- tion, trip assignment, level of service calcula- tions, capacity analysis and signal warrant evaluations Complex » 1-70 Silverthorne/Dillon Interchange, CDOT - Com- pleted total of 9 miles of crash analysis with the results concluding in a Safety Assessment Report. » East Side Mobility Study, CCD - Multimodal transpor tation plan to identify solutions to help overall travel mobility throughout the travel shed for cars, bikes, pedestrians and public transit. » SR 89A/J.W Powell Road Roundabout Feasibility Study, ADOT - Operational analysis of two round- about intersections and one 6-legged roundabout. Proposal No. 7392. 1 Fort Collins. Colorado I Civil Engineering. Design, Drafting & Survey Services On -Call 18 AECOM Education/Registrations BS, Civil Engineering, Brigham Young University, 1986 PE/Colorado, Registration No. 33714, 1999 Professional Traffic Operations Engineer, No. 446, 1999 II. Organization Chart / Resumes Don Holloway, PE, PTOE Traffic/Planning Don is a Technical Leader and has more than 20 years of transportation planning and engineering experience with both public and private sector perspectives. Don is an expert in transportation planning and facilities access planning. He is power user in traffic simulation modeling (VISSIM and CORSIM) and regularly trains and instructs other AECOM modeling staff. He has been a leader in developing innovative transportation analyses techniques and has received Technical Excellence awards for his innovations and has trained AECOM staff all across the United States in his specialized techniques. Simple » New Belgium Brewery Oxbow Expansion, Ft. Collins, Colorado: Provided a multi -modal traffic impact study for New Belgium Brewery expan- sion that included special trip generation. » FM 518 Signal Retiming, The City of Pearland, Texas, Project Engineer, identified a set of traffic operations recommendations for the City and Pearland resulting in cost-effective strategies in- cluding implementation of phased signal timing optimization which significantly reduced peak corridor travel times by 55 percent. Education/Registrations BS, Civil Engineering, Technology, Colorado State Univer- sity, Pueblo, 1977 PE/Colorado, Registration No. 35159, 2001 Certified Floodplain Manager, #US-08-03233 Complex » SH 392/1-25 Interchange, Project Traffic Engineer Developed traffic forecasts for the design from the NFRMPO travel demand model. » Denver Strategic Transportation Plan, vehicle and transit trip forecasts for various travelsheds. Using the DRCOG TransCAD transportation model in sup- port of multi -modal improvements. » Bus Rapid Transit Corridor Pilot Study, Chicago Tran- sit Authority. Traffic Simulation Modeling and Transit Signal Priority Lead for a pilot study to implement four Bus Rapid Transit (BRT) Corridors on critical high -ridership CTA routes. Tom FLlenteS PE Drainage/Utilities Tom has experience in storm drainage design, floodplain hydraulics, bridge scour analysis, and the design of major drainage structures. He has comprehensive knowledge of local, state, and federal design criteria related to storm drainage, the NPDES MS-4 stormwater quality program, and a wide assortment of hydrology/ hydraulic modeling programs. His background includes project management, preliminary and final design, preparation of master drainage plans, utility reports, construction plans, specifications and cost estimates, and design support during construction. Simple » Task order manager for bridge replacement hydraulics analysis, CDOT Region 2, North Engi neering Office. » Drainage design task manager for Colorado Bridge Enterprise, review of several replace- ment bridge designs in the Denver Metro area, CDOT Region 6. » Task manager for CLOMR / LOMR preparation of Metro Wastewater Access Bridge across the South Platte River Complex » Woodmen Road Widening and Safety Improvement Project, El Paso County, Task manager responsible for drainage design for Woodmen Road from Pow- ers Boulevard to State Highway 24, including de- velopment of an urban and rural roadway drainage system. » E-470 / 1-70 Flyby - Drainage task manager, for six new pairs of bridges, UPRR overpasses, and major structure crossing over First Creek Proposal No. 7392. 1 Fort Collins. Colorado I Civil Engineenng, Design, Drafting & Survey Services On -Call 1 9 AECOM II. Organization Chart / Resumes Education/Registrations Charlton "Chuck" Bachelor of Engineering, Civil Engineering, Vanderbilt, 1997 Kennedy, PE, CFM PE/Colorado, Registration No. 36550, 2002 ASFPM Certified Floodplain Manager, No. US-09-04356, 2009!IliqDrainage/ U t l i t i e s CDOT Certified Erosion Control Supervisor Chuck is a hydraulic engineer with AECOM. During his 14 years with AECOM, Chuck has designed hydraulic engineering systems to serve interstate projects, land development projects, park projects, and transit projects. Hi expertise includes 1D and 2D floodplain modeling, major hydrologic modeling, storm system design, floodplain permitting, and permanent and temporary stormwater quality Best Management (BMP) planning and design. Chuck led the drainage design effort to deliver the SH 392/1-25 Interchange. Simple » Roadway Improvements in Huefano County for the Shell Oil Company Performed offsite hydrol- ogy and designed several box culverts. » 1-25 Bridges/Floodplain Evaluation at Pikes Peak International Raceway for CDOT Region 2. Estab- lished existing conditions floodplain in advance of CDOT design build project. Tasks included major offsite hydrology and split ID floodplain modeling. » Colorado Springs Trailhead and Day Use Area. Designed and prepared construction plans for a sedimentation basin in support of Colorado Springs Utilities efforts to keep sediment out of the McReynolds Reservoir. Complex » SH 392/1-25 Interchange, Storm drainage and util- ity task lead. Tasks included storm system design, offsite hydrologic analysis, and stormwater quality BMP design. » Denver Union Station, Designed drainage systems for the bus, street, and pedestrian circulation. » United Avenue Reconstruction, designed drainage and water quality systems for 3 miles of arterial reconstruction in Pueblo Education/Registrations Gary Map, PE BS, Civil Engineering -Structure, University of Nebraska at Structures Omaha, 1988 PE/Colorado, Registration No. 34150, 1999 and MN, MO, UT, VA, WI Gary is responsible for structural task order management and the design, rehabilitation, and inspection of highway and railroad bridges and box culverts built in accordance with AASHTO and AREMA specifications. His project experience includes both steel and prestressed concrete girder structures supported on shelf - type, integral, or mechanically stabilized earth abutments. Simple » Project manager for Rio Blanco County's On -Call contract. » 1-76 Corridor, On -call task order manager for the environmental clearance, design, and construc- tion management of 16 miles of rural interstate for CDOT Region 4. » Structure task manager for the multi -phased improvements along South Academy Boulevard for El Paso County, CO. » Structure task manager for the roadway corridor improvements along Woodmen Road for El Paso County, CO. Complex » SH 392/1-25 Interchange, Structure task manager responsible for the design development of a 2-span U-girder bridge and over 25,000 square feet of re- taining wall structures. » SH 66 Bridge over St Wain River. Project and struc- ture manager responsible for 2.5-miles of highway safety improvements and bridge replacement. » US 34 Bridges over Big Thompson River. Project and structure manager responsible for the design of two bridge replacement projects located within the Big Thompson River Canyon. This project was constructed using accelerated bridge construction methods that built these bridges within a 14-day roadway closure. Proposal No. 7392.1 Fort Collins. Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 1 10 AECOM II. Organization Chart/ Resumes Education/Registrations Joshua Laipply, PE Graduate Certificate, Colorado School of Mines 2002 Structures BS, Civil Engineering, Colorado School of Mines 1997 PE/Colorado, Registration No. 36629: kAS Joshua brings over 14 years of structural engineering experience and has been responsible for project management, design, construction, and rehabilitation of highway and railroad bridges, light rail maintenance facilities, box culverts, drainage structures, and retaining walls. His expertise includes both steel and prestressed concrete girder structures. Bridge projects have included steel super -structure design with complex grillage analysis, pre-cast/prestressed concrete, design for construction phasing, remediation design of historic railroad truss bridges, and construction management. Simple » CR 200 over the Minnequa Canal, project man- ager for rehabilitation of a county bridge with scoured abutments. » Academy Boulevard over B Street, structural engineer for the design and of a 4 span continu- ous precast/prestressed concrete structure. » » On -call contract manager CDOT Region 1,2,4, and 6 design NPS. Education/Registrations BS, Civil Engineering, University of Colorado, 1984 PE/Colorado, Registration No. 23562, 1985 Complex » Colorado Bridge Enterprise (CBE) Program Manage- ment, deputy program manager responsible for as- sisting CBE designated bridge projects that involve repair/reconstruction or replacement of bridges throughout . SH 58 over 44th Ave & BNSF Railroad, lead structur- al engineer for the design and of a two span continu- ous steel structure.. » RTD Light Rail Maintenance Facility Improvements, Project manager for Light Rail facility expansion of Elati and interior use modifications at the existing Mariposa facility. Skip Had, PE Construction Skip is a Project Manager and heads the Construction Management Department in the Rocky Mountain Region. He has extensive experience in civil engineering, including nearly 29 years in planning, design, and construction with the Colorado Department of Transportation. He is a highly experienced manager with an extensive background in directing projects to acceptable and definite conclusions. Construction projects have included complex multi -phase interstate construction, urban interchanges, reconstruction, resurfacing, noise barriers, signalization, landscaping, major and minor structures, hazardous waste remediation, local agency enhancements and safety improvements. Simple » Task order manager for Pedestrian Improve- ments for the City of Boulder » Task order manager for 1-25 North of Mead bridge rehabilitation for CDOT Region 4 » Task order manager for Industrial/Purcell inter section signalization for Pueblo County » On -call contract manager for City of Boulder, CDOT Regions 4, 1 and 6 Complex » Project Manager for the Broadway, Pine to Iris re- construction project in the city of Boulder including multi -phased utility replacements, concrete roadway and multi -use pathways » 1-25 at 104th, 84th, Speer Boulevard, Bronco Bridge and Alameda interchange reconstruction projects for CDOT » Quebec Street over C-470 pedestrian and vehicle bridge construction for Douglas County Proposal No. 7392, I Fort Collins, Colorado I Civil Engineering, Design. Drafting & Survey Services On -Cal) 111 AECOM II. Organization Chart/ Resumes Education/Registrations Steve Wilensky, RLA B.L.A., Landscape Architecture/Urban Design, 1975, Uni- Transit Design versity of Minnesota RLA/ 1981: MN, #15148, 2004, OR, #560, 2006, NM # 393; 2007, CO # 246; 2009, TX # 2615 Mr. Wilensky brings a broad range of urban design experience. Steve has managed and been responsible for design leadership on a variety of multidisciplinary projects involving multimodal, transportation engineering, urban design, landscape architecture, bridge architecture and public process. He understands the complexities involved in working with multiple interests, their differing goals and satisfying at times, conflicting agendas. Additionally, he brings the ability to coordinate and communicate alternative concepts resulting in joint agreement. Steve has focused his career around public projects that provide a quality of life in a sensible, cost effective manner. Simple Complex » Principal in Charge/Urban Designer for 10th and » Project Manager and Lead Urban Designer for 13 Osage Light Rail Station in Denver, Colorado. LRT stations and 19 miles of track geometry for T- » Lead Designer for Englewood Station Area Plans REX Urban Design Improvements in Denver, Colo - in Englewood, Colorado. rado. » Principal in Charge/Senior Designer for Boulder Transit Village Intermodal Transit Facility in Boul- der, Colorado. » Project Director for Boulder/28th Street Corridor Arts and Aesthetics Plan in Boulder, Colorado. » Principal in Charge for Northeast Downtown Neighborhoods Small Area and TOD Planning in Denver, Colorado. » Senior Designer for 14-mile light rail double track Edmonton LRT Extension in Edmonton, Canada. » Principal in Charge/Urban Design and Planning Manager for street -running light rail for Central Cor- ridor LRT in Minneapolis/St. Paul, Minnesota. » Principal in Charge for five -station planning effort for Southwest Transitway Station Area Strategic Planning in Minneapolis, Minnesota. Education/Registrations Rhonda Bell MLA, Landscape Architecture, 2001, University of Minne- Transit Design sota BA, 1994, Bates College, Magna Cum Laude Rhonda is a planner and urban designer with a special interest in transit and transit -oriented development. Her experience includes a range of projects both 'inside' and 'outside' of the transit envelope, working on both transit infrastructure as well as adjacent development. Rhonda's interests lie in creating socially, economically, and environmentally sustainable patterns of living, patterns that take advantage of smart growth tools such as public transit, urban infill, and neighborhood revitalization. She has had extensive experience in all phases of the development process— from initial entitlements and political process to design and construction. Simple Complex » Project Manager for Boulder Transit Village Inter- » Project Manager for 11-acre parcel adjacent to a modal Transit Facility in Boulder. Colorado. new LRT station for Draper Transit Oriented Develop - Project Manager for Northeast Downtown Neighborhoods Small Area and TOD Planning in Denver, Colorado. » Project Manager for commuter -rail TOD for Clearfield Transit Oriented Development in Clearfield, Utah. » Project Manager and Planner for Village Center Improvements in Greenwood Village, Colorado. » Project manager for Southglenn Sub -Area Plan in Centennial, Colorado. ment in Draper, Utah. » Lead Designer for sustainable urban integration of Southeast to West LRT in Edmonton, Canada. » Project Manager for street -running light rail for Cen- tral Corridor LRT in Minneapolis/St. Paul, Minnesota. » Project Manager for five -station planning effort for Southwest Transitway Station Area Strategic Planning in Minneapolis, Minnesota. Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 1 12 No Text Our team's proven experience speaks volumes to differentiate our team. Of specific importance is our demonstrated performance on similar contracts to deliver on -call services throughout the state of Colorado for municipal, county, and state agency clients. The work we have performed for our clients under on -call contracts has ranged from a $2K task Seasoned and Solid I Project Experience order to assess signal timing, to a $600K task order for major arterial design and construction management. The map below and the following project descriptions provide a summary of our on -call contract experience, and the staff on this team who were a part of those services. MAP OF TEAM ON -CALL EXPERIENCE THROUGHOUT COLORADO ................................................................................................................................................................................................... Ft. Collins Downtown Strategic Plan (OV, LLC) •• CDOT Region 4 On -Call Mason Street BRT Rio Blanco County On -Call I Boulder County On -Call City of Boulder On -Call C� of Denver On -Call Coal Mine 5t.; Quincy Ave. Ext.; Denver Union Station Coal Mine Ave. CDOT Region 6 On -Call Arapahoe County (105West) Redev lopment (EES) Co. Rd 73 Jefferson County (10SWest) • • City of Centennial Traffic Engineering Services City of Littleton On -Call Douglas County On -Call CDOT Region 1 On -Call El Paso County On -Call Pueblo County On -Call COOT Region 2 On -Call I Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineering, Design. Drafting S Survey Services On -Call AECOM Task Order Examples Downtown signing plan, $15K 1-70 East Connectivity Study, $35K City Park Traffic Circle, $35K 23rd Avenue Reconstruction, $120K Washington Park Rehab, $60K Colfax Avenue Safety Audit ($30k) Lawrence One -Way Conversion ($25k) Hampden Travel Shed Study ($85k) West Side Travel Shed Study ($65k) Denver Strategic Transportation Plan ($80k) Seasoned and Solid I Project Experience City of Denver On -call services, including studies, roadway engineering, and bridge services Under a tight schedule and quickly evolving project dynamics, AECOM Experience as a Team with the provided services to the 1-70 East EIS process that helped to inform the Same Staff advisory team of the importance of neighborhood connectivity in the A. Eckman context of a major highway project L. Candelaria D. Holloway G. Maji S. Wilensky R. Bell Task Order Examples Intersection feasibility, $10K Mineral Road intersection, $30K Signal design, $15k Signal timing review, $2k The AECOM task manager tracks each task order on a weekly basis to ensure the project team remains on task and budget. All deliverables to the client are subjected to QA/QC through the AECOM Quality Management System. City of Littleton On -call services, including advising the city on traffic - related issues and providing engineering design services Experience as a Team with the Same Staff A. Eckman J.Sabo L. Candelaria Proposal No. 7392, 1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 1 14 T1ix 01UVJ Ll Task Order Examples 14th Street Transit Station Improve- ments, $120K Broadway Pine to Iris CM and Inspec- tion, $350K Pedestrian Improvement CM and Inspection, $80k Folsom & Spruce Intersection Im- provements ($39k) 30th Street, Arapahoe to Pearl Widen- ing and Bridge Replacement ($96k) Our construction management services and working with local contractors was critical to minimizing peak business impacts during construction. Our team is also provides expertise with audit compliance for projects that receive federal construction funding. Task Order Examples Signing condition/retroreflectivity inventory Neighborhood traffic requests School crossing installations Funding grant applications for safety Corridor signal timing plans AECOM services included all of the functions of the city traffic engineering department as a consulted service. Each task work order was tracked through an electronic system that provided performance metrics for responsiveness. Seasoned and Solid I Project Expenence City of Boulder On -call general engineering and construction management services Experience as a Team with the Same Staff J. Sabo J. Laipply S. Hlad D. Miller M. Salek M. Heugh City of Centennial Traffic engineering services Experience as a Team with the Same Staff A. Eckman D. Holloway L. Candelaria M. Heugh Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineenng, Design, Drafting & Survey Services On -Call 1 15 AECOM Task Order Examples South Academy Bike/Ped Trail, $30k ROW plans/monumentation, $21k Wetlands monitoring and LOMR, $45k AECOM provided the County with full service design services and local agency coordination support to gain required project clearances from CDOT for the S. Academy Bike/Ped Trail Project. AECOM worked with local stakeholders included Pikes Peak Community College and Fort Carson to obtain project consensus and required easements were donated to the project. Task Order Examples Traffic Analysis for EA, $75k United Avenue Roadway, $600k United Avenue CM, $500k Purcell Signal Install CM, $15k CR 200 Bridge Rehabilitation, $60k AECOM provided full service for a 3-mile arterial roadway reconstruction project that spanned from project development and environmental clearance to construction management services. Seasoned and Solid I Project Experience El Paso County On -call general engineering services Experience as a Team with the Same Staff J. Sabo T. Fuentes C.Kennedy M. Salek Pueblo County On -call general engineering and construction management services Experience as a Team with the Same Staff A. Eckman J. Sabo D. Holloway C.Kennedy S. Hlad M. Heugh M. Salek H. Mathis Proposal No. 7392, 1 Fort Collins. Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 1 16 w __M�� AECOM 303,376.2979 tel / Oco I 717 17th Street 303,228. 3001 fax Suite 2600 Denver, CO 80202 May 31, 2012 City of Fort Collins' Purchasing Division 215 North Mason St., 2nd floor Fort Collins, Colorado 80524 Re: Request For Proposal; 7392 Civil Engineering, Design, Drafting & Survey Services On -Call Dear Mr Stephen, Mr. Klingner and Selection Committee Members, The key to success for an on -call contract is to select the most flexible consultant team that provides all the resources you need for planned and unforeseen work orders. The team must be knowledgeable, available and responsive, they must have a depth and breadth of resources; they must be committed to the success of every aspect of your projects; and most importantly, they must serve as your partner in project delivery. Together with our DBE subconsultants, the AECOM team is the most qualified and committed to successfully work with you and your staff in meeting and exceeding your goals for this contract. Consider the following highlights of our proposal: Skillfully Balanced I Team and People The AECOM team is organized so that any task order can be quickly assigned and executed by the right people. This team brings together local motivated and available engineers and planners, backed by a full service office of roadway, transit design, structural and construction management and inspection staff. Our contract manager Alan Eckman and the entire team have worked together on all types of on -call contracts throughout the state of Colorado. We also bring so much more with innovative capabilities that go beyond what most firms can provide. Seasoned and Solid I Project Experience This team provides demonstrated performance for on -call contracts with municipal, county, and state agency clients. The work we have performed range from a simple $2K task order to assess signal timing, to a more complex $600k task order for major arterial design. Customized Quality I Management Approach Our approach is to be responsive and efficient in what we do. We have a proven 9-step process to initiate, execute, and close task orders all within an ISO 9001 certified quality program. This means the City will receive quality deliverables, that are accurately estimated, and that meet tight schedules of delivery. We appreciate the opportunity to present our Qualifications, and look forward to furthering our relationship with you. Alan Eckman is the individual to contact if you have any questions or comments on our submittal. He can be reached by phone at 303.376.2979 or email via alan.eckman@aecom.com. Sincerely, R.A. Plummer, PE, AICP Vice President, Officer In Charge Alan Eckman, PE, PTOE Associate Vice President, Contract Manager Task Order Examples CR 14 Bridge over White River, $125K Bridge Guardrail Rehabilitations, $15K CR 27 Bridge over Douglas Creek, $195K CR 5 Bridge Load Ratings, $10K CR 122 Roadway Guardrail Improve- ments, $19K On -call transportation services contract for Rio Blanco County included structural condition assessments, construction cost estimating, preliminary and final design, environmental permitting, coordination with state and federal resource agencies, floodplain evaluation and permitting, bridge and structural design, development of funding grants, and preparation of PS&E packages for low -speed, low -volume roads in mountainous terrain. Task Order Examples CR-16 Over Plum Creek Bridge Re- placement, $120k AECOM provided full service preliminary and final design of bridge, roadway, hydraulics and environmental clearances. Design required NWP 404 and floodplain development permit submittals. Seasoned and Solid I Project Experience Rio Blanco County On -call general engineering services Experience as a Team with the Same Staff G. Mail J. Sabo A. Eckman D. Holloway C.Kennedy M. Heugh J. Laipply J. Sabo Douglas County On -call general engineering services Experience as a Team with the Same Staff J. Laipply S. Wilensky T, Fuentes M. Salek Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineering, Design. Drafting & Survey Services On -Call 1 17 AECOM Task Order Services Project management Utility coordination Permitting Project controls Scheduling FTA reporting Value engineering Oversee all design functions Management Consultant to the City of Fort Collins, Colorado for the Mason Corridor MAX bus rapid transit program. This project is highlighted because it demonstrates AECOM's commitment to the City of Fort Collins to deliver high profile projects, by providing the resources and expertise needed for both planned and unforeseen circumstances. Task Order Examples SH 392/1-25 Interchange Bridge and Retaining Wall Design, $199k SH 115 Gate 6 Road Design, $45K- SH 115 Gate 6 Geotechnical Slope Analysis, $35k SH 115 Gate 5 North H&H, $52k US 24/Elbert Road, $194k 1-25 Hydraulics/Stormwater, $52K Seasoned and Solid I Project Experience Mason Street BRT Project management and support services Experience as a Team with the Same Staff R.A. Plummer T Tyrrell CDOT Regions 1,2,4,6 On -call general engineering and construction management services AECOM works with CDOT throughout Colorado and specifically in Experience as a Team with the Region 4 with an on -call contract. We have conducted a full range of Same Staff services for CDOT on state highways within the context of local A. Eckman D. Holloway communities. J. Sabo S. Hlad C. Lang D. Miller T. Tyrrell M. Salek G. Mali H. Mathis J. Laipply Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineering, Design. Drafting & Survey Services On -Call 1 18 AECOM REFERENCES The following references can team's ability to complete the address our management types of projects required for the Fort Collins On -Call protect: Dennis Barron Paso County, El Project Manager 719-520-6832 dennisbarron@elpasoco.com Roger K. Mutz, PE. Chief Civil Engineer 201 West Colfax Ave Capital Project Management, Department 506 Denver, Co 80202 720-913-4512 roger.mutz@ci.denver.co.us Arthur Griffith P. E. Douglas County Capital Improvements Project Manager P.O. Box 1390 Castle Rock, CO 80104-1390 303-660-74907 ext.317 agriffit@douglas.co.us Stephany Westhusin City of Boulder - Public Works Transp. Project Management Coord. 1739 Broadway, 2nd Floor P.O. Box 791 Boulder, CO 80306 303-441-4274 WesthusinS@bouldercolorado.gov Corey Stewart, North Program Engineer CDOT Region 4 North Program Engineering 1420 2nd Street Greeley, CO 80631 970-350-2104 Corey Stewart@DOT.STATE. CO. US Seasoned and Solid I Project Experience Proposal No. 7392. 1 For[ Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 1 19 Customized Quallsty Management Approach Customized Quality I Management Approach PROJECT Responsive and Efficient Task Order Execution UNDERSTANDING AND OBJECTIVES This contract will the 1Ft. Collins Initiation Ft. Collins contacts ContractManagerAlanEckman with provide task order opportunity. additional staff needed to serve i 2. AECOM Contract Manager Within one week Alan identifies a Task Order Manager necessary many different types of projects. Alan Eckman subconsultants. He then works with the proposed team to draft the scope, These projects could range from a schedule, and estimate, as appropriate, small turn -key project design where . Task order Discuss:o" Alan and Ft. Collins' Project Manager meet to finalize the Task Order. AECOM provides all engineering with Ft. Collins design to a project that needs only a 4, Cost Worksh eel Alan submits the final scope of work and work plan detailing labor certain discipline by the consultant submittal categories, hours, milestones, and deliverables. such as drainage engineering. The 5. Notice to Ft. Collins gives AECOM the Notice to Proceed. Our staff will be on the AECOM team will provide a Proceed project the next day. Task Order Manager will contact subconsultants and initiate work. responsive staff and deep team AS the project progresses. Alan and the Task Order Manager will update you 6. Project with month/ experience that can serve your Work monthly of the scope and fee schedule We will work with you projects, whether they be planned throughout the project to ensure quality and responsiveness. Capital Improvement Projects, or z Project At project completion, we will work quickly to produce final plan documents planning projects that require Complete and close the task. a. Final Final Invoicing. Ft. Collins will receiveAECOM's final invoice within one preliminary engineering and cost estimate advisory services. A Invoicing week or completion. sample of the potential projects and g. Task order Close ; Task Order Close Out and Unencumber Remaining Funds. Once the Unencumber project is closed and AECOM's final invoice is processed, Ft. Collins can services where AECOM has Remaining Fords unencumber the remaining funds for the next project, extensive experience are discussed below. �— pie Types of Projects/ a AECOM Te Intersection design identified AECOM has designed all types of intersections under on -call contracts, and can provide all the through the Intersection disciplines required to provide a complete package of plans, specifications, and estimates. Prioritization Study Roundabouts and/or AECOM has designed and constructed roundabouts in Colorado and in Arizona. We have unique safety or bike/ experienced staff with the delicate design of roundabouts that reduces speed and redirects ped improvements at traffic, and properly positions the pedestrian and bicyclist to minimize conflicts. Our team intersections includes Chris Vogelsang who is an expert who designs bicycle facilities and is currently working with the city on the bike share program. Project special provisions AECOM provides a team that is experienced in all types of innovative contracting and and innovative delivery specifications. Our work as the Program Manager for the Colorado Bridge Enterprise has lead to accelerated delivery through CM/GC, Design/Build, A+B bidding, and many different forms of incentive/disincentive and performance specifications. Data collection and This team provides a comprehensive team that has prepared ROW and ownership mapping, land title investigations and property rights, water rights and easements. 105 Wesl, and H.C. Peck both provide all types of land, ROW, and surveying data collection. Neighborhood traffic Many of the staff on our team have worked on a city traffic engineering team or as an on -call mitigation traffic consultant. We understand that traffic on city streets is one of the most visible aspects of the city. Our staff has provided traffic calming, school crossing assessments, signal warrant analysis, development traffic reviews, parking and circulation studies, and sign reviews for all types of community scale traffic concerns. Signal design, signing and Out of the AECOM Denver office, our team has designed over 50 signal installations over the last striping 8 years. These signals have included everything from mid -block pedestrian crossings to six -lane fully actuated and advance dilemma zone detection. We have also prepared many signing and striping plans that have included one-way to two-way conversions and unique plans such as cycle tracks in a park setting. Proposal No. 7392. 1 Fort. Collins, Colorado I Civil Engineering. Design, Drafting & Survey Services On -Call 120 Customized Quality I Management Approach Sample Types of Projects/ Why the AECOM Team? Services Advisory services for Our team includes a full compliment of engineers and planners who have experience working together planning projects This balance of talent provides your team with the type of expertise that can be helpful when exploring new projects and programs that have been ident fled in the transportation planning process. Whether it be design standards modifications or transit oriented development opportunities, this team has all the resources and expertise you will need. Support for presentation, We are very familiarwith your process at the City, including City Council work sessions through the meetings, and funding preparation of Agenda Item Summaries, supporting hand-outs and response memo's. We have also applications assisted the City with funding applications where more specialized resources can be applied to help make your projects more competitive at the state and national level. Public and stakeholder AECOM regularly prepares high -quality public meeting exhibits and materials. Our team also meeting support includes Beth Vogelsang who can provide meeting facilitation services. AECOM and Beth have worked together most recently at the 1-70/Silverthorne interchange that included an extensive public outreach effort. Managing Cost, Schedule and Quality .w.i*1.9.....9........................................................................................... You will hire us as much for our project management capabilities as our technical capabilities. AECOM has demonstrated our commitment to the city by delivering solid project management and support services that provide the results you need, on -time and within budget. Accurate Construction Cost Estimatjn9 ..................................................................................................... The importance of accurate construction cost estimating cannot be understated. It is important to have a consultant who will provide you with cost estimates that account for the project - specific site conditions and incorporate the current market Vends and material costs to minimize changes during construction. Schedule ................................................................................................. The AECOM task manager vnll track the schedule on a weekly basis. We use all types of software to create a critical path schedule, with Microsoft Project being the likely software for less complex assignments. Our attention to the project schedule not only delivers the service when you need it, but also helps to control projects costs by focusing on completing the work in a timely fashion. Our Attention to Critical Path Helps Fort Collins Succeed! Project AECOM Timeline Our Cost Control Flelps Fort Collins Succeed!' We track our project budgets using AECOM Project Information Center (APIC) software. This program enables us to generate real-time and earned -value financial reports at the task and sub -task levels, directly aligning with Fort Collin's performance metrics. AECOM°s performance on bid estimates is on target. Engineer's Bid Range Estimate AECOM offers a parametric cost estimating software (TRACER) to prepare construction packaging estimates. This tool was developed by AECOM with AASHTO and RS Means. Proposal No. 7392, 1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call AECOM Quality Control .................................................................................................... AECOM's quality management system (OMS) is proven effective in delivering high -quality plans and analyses that meet stakeholders' expectations and result in very accurate forecasting of construction bids. Our ISO 9001:2008-certified system defines the steps and checking processes required before deliverables are released. In addition to these formal processes, we recognize that a key component in delivering top quality is the depth of knowledge in interchange design, applying practical lessons learned and effective constructibility analysis that yields a comprehensive, accurate design package. Moreover, our team's demonstrated ability to communicate with stakeholders and to gain consensus on design concepts and solutions is a critical ingredient in delivering top quality, conforming to Ft. Collins procedures, and providing best value for Ft. Collins' investment. I� %ado" Amcor on of w.mba 3 E-- This :1 word is Presented to El Paso Count},, CO for its program South Academy Improvement Project in recognition of an eReetive and innovative program wbkh ".tribal. to and cahaneta county "veramant in the United Stater. Innovative Ideas: South Academy Blvd — from concept to comple- tion in 12 months! An intersection improvement that was far less expensive, provided a compromise of operational improvements, and achieved stakeholder consensus... plus an award. Customized Quality I Management Approach Efficiency through Software Availability and Capability................................................................................................. Our team is supported by advanced technology, a wide area computer network for the efficient transfer of data and information, and a world class IT -department. Our staff is proficient with the newest versions of state -of - the -practice software. These include but are not limited to: » CADD modeling software, such as Autodesk Civil 3D, and Bentley MicroStation with InRoadS » Hydrologic/hydraulic software, such as InRoads Storm and Sanitary, FLO-21D and PondPack. We also have extensive experience delivering projects with freeware from the U.S. Army Corps of Engineers such as HEC-RAS and HEC-HMS. » GIS software from ESRI, including advanced add- ons. » Traffic Simulation Software, such as VISSIM, Syn- chro, and CORSIM. » Structural Software, including SAAP2000, ConSpan, Leap, STAAD, ETABS, GT Strudl, MathCAD, PCA Column and Virtis. » ProjectWise, Microsoft Project, Primavera, SiteMan- ager » Having used these software tools on many differ- ent projects throughout the state, we will be able to quickly and efficiently determine the right software for the task and provide the results you need. "The City of Fort Collins and Town of Windsor would like to thank you and the AECOM team for your excellent work and contribution to the SH 39211-25 Interchange. The coordination of this project involved a number of complex interagency activities and your ability to navigate this context sensitive process and to help deliver the project to a successful outcome is appreciated. The full services capabilities of AECOM spanning from project concept to final design and funding provided an excellent resource to allow this project to stay on track." Rick Richter, City of Fort Collins .............................................................. Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineenng, Design. Drafting & Survey Services On -Call 122 About AECOM AECOM is a global provider of professional technical and management support services to a broad range of markets, including transportation, facilities, environmental, energy, water and government. With approximately 45,000 employees around the world. AECOM is a leader in all of the key markets that it serves. AECOM provides a blend of global reach, local knowledge, innovation and technical excellence in delivering solutions that create, enhance and sustain the world's built, natural, and social environments. A Fortune 500 company, AECOM serves clients in more than 130 countries and had revenue of $8.2 billion during the 12 months ended March 31, 2012. More information on AECOM and its services can be found at www.aecom.com. Alan Eckman, PE, PTOE 717 17th Street Suite 2600 Denver, CO 80202 D 303.376, 2979 C 303.590.5966 F 303.228.3001 alan.eckman@aecom.com r -I Team and People The AECOM team is organized so that any task order can be quickly assigned and executed by the right people. The team of AECOM professionals and subconsultant partners provides a balanced and deep bench of top -tier talent and a commitment to customer service. Our team staff has worked with the City of Fort Collins on a number of complex assignments such as the SH 392/1-25 Interchange and the Mason BRT project, which demonstrates our ability to help you with specialized capabilities. Our team is equally motivated on smaller task -order contracts as demonstrated through the number of on -call task orders we have completed for municipal and county clients throughout the state of Colorado. Please read the resumes found later in this section that highlight our task order manager's experience for both simple and complex assignments. Being available and flexible is a key component to successful on -call contract service. AECOM provides availability in multiple ways. Our depth of resources and staff means we can provide the people and tools you need for any engineering and support task, both planned and unforeseen. Please refer to the following pages for the Organization Chart (page 2) and Key Staff Qualifications (page 3). Our task order managers' expertise in all disciplines translates to quick response by the people with the skills you need for any task order. As the contract manager, Alan Eckman can draw on all of AECOM's Colorado, Regional, and National resources as necessary to minimize the duration from the initial task request to the staffing of the project. We have included subconsultants that expand this flexibility with firms that we have trusted working relationships and that bring the type of talent that will fit the services your program will need over the life of the contract. AECOM has successfully partnered with all of the DBE subconsultants on the team, and all have been a part of an AECOM team in the last year. .............................................................. Skillfully Balanced I Team and People AECOM has demonstrated our commitment and flexibility to the city by providing unique and specialty services. » For the SH 392/1-25 Interchange, AECOM had a small task order under a short timeframe to prepare a TIGER grant application that helped galvanize support for fund- ing the project. » For the Mason BRT project, AECOM provided project management services for design coordination, right-of- way acquisition, financial administration, internal City Department synchronization, railroad agreements, PUC Filings, FTA Compliance and safety/security compliance and reporting for the design phase. Technical Colorado Staff Disciplines/Key Team Member Size/Total Staff Capabilities Proposal No. 7392. 1 Fort Collins. Colorado I Civil Engineering, Design. Drafting & Survey Services On -Call 12 Support Resources Roadway Engfheeffing Matt Salek. PE Chris Lisberg, El Structural Engineering Dave Hoist, PE Chuck Agins, PE Survey/ROW/ Investigations Robert Masters. PLS (105) Michael Anders (HCP) City of Fort Collins Tast, ^-'er Managers Roa Cor E Traffic/Planning Lisa C�delaria, PE n-- u-11 ........ nr r Drainage/Utilities Construction Transit Design Bike/Ped/Roundabouts Chris Vogelsang, PE (OV) Lisa Candelaria, PE Signals/Signing/Striping Michael Heugh, PE Heath Mathis, PE Safety/ Neighborhood Traffic Michael Heugh, PE Derek Lahusen, PE Construction Inspection Rich McLead, PE Dary Miller Drainage/Utilities Amanda O'Connor, PE (EES) David Center. PE Graphic Support/ Web Sites Allison Graham, RLA, LEED AP Skillfully Balanced I Team and People The AECOM team provides a depth of task order managers that have experience in all the areas of service the City may need — ranging from smaller and simple task orders to more complex assignments Environmental Services Brian Kennedy, AICP FTA Compliance/Specs/ Estimates Terry ryrell, PE 10 CDOT/FHWA Liaison Alan Eckman, PE, PTO Eai Public Involvement Support The AECOM team is complimented by internal specialty staff and subconsultant partners that provide expertise that the city can rely on for unique and unforeseen assignments. 105 105 West I HCP HC Peck I OV OV Consulting I EES Engineering and Entitlement Services Proposal No. 7392.1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 13 AECOM ABOUT OUR FIRMS The AECOM practice offers a comprehensive approach to guide responsible and productive use of transportation assets and public right-of-way, and includes: roadway/civil, traffic/planning, bridges/ structural, transit bus/rail design, and construction management/inspection services. We also offer a depth of resources in other complimentary services such as urban design, master planning, environmental assessments, environmental and ecological planning, strategic planning and economic development. AECOM's engineers, planners and other professionals have assisted public and private clients to create places that are healthier, more vibrant, better connected and with more efficient transportation systems. AECOM's professionals are constantly looking for more acceptable, safer and sustainable ways to move people across cities, countries and continents. The primary contract management and production will be performed by the AECOM Transportation Denver office. OV Consulting, DBE Firm Ordonez and Vogelsang, LLC, is a transportation planning consulting firm that specializes in transit planning, the integration of multi -modal solutions, and the interface between land use and transportation planning in solving unique problems. OV, LLC has over 26 years of combined experience in these areas for local municipal agencies. EES, DBE Firm EES has extensive experience in all facets of civil engineering, in both the public and private sectors. They provide land development consulting for a wide variety of property uses ranging from small grading projects up to 200-acre multi -use developments, and from local roadway realignments to highway interchange and park -and -ride designs. Skillfully Balanced I Team and People "EES has worked with AECOM for over 3 years on the Denver Union Station project. The assignments given to us are always meaningful pieces of the overall design. AECOM has been there for us as a strong business partner and helped us grow our firm and our stature in the business community." —Amanda O'Connor - EES 105 West, DBE Firm 105 West, Inc., is a Denver based consulting firm offering professional land surveying services to clients in both the public and private sectors. Founded in 2006, 105 West, Inc., specializes in providing professional surveying and mapping services to the transportation engineering industry. H.C. Peck and Associates, DBE Firm H.C. Peck & Associates, Inc. is a full service national right-of-way company founded in 1988 to provide professional land services to both private industry and government agencies. A woman owned and operated company employing approximately 40 right-of-way specialists, HC Peck is certified as a UDBE by the States of Colorado, North Carolina and Washington, the City and County of Denver, and the City of Tucson. Proposal No. 7392. 1 Fort Collins. Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 14 nSKHdJ Skillfully Balanced I Team and People About Our Experience ......................................................................................................................................................................................................T........................... Our team is comprised of individuals who have a history of working together as a team on similar on -call contracts. Key-Staff/Years Experience/Years with Firm(Time Commitment Unique Qualifications 0011";Van Similar Experience as a Team' Eckman, PE, PTOE Experienced as a project manager over multiple City of Denver On -Call; Contract Manager disciplines. Project manager skills span planning to City of Colorado Springs On -Call 14 Years/13 Years 1 75% design to implementation. Committed to achieving City of Centennial On -Call success for all projects. City of Littleton On -Call Pueblo County On -Call CDOT On -Call R.A. Plummer, PE, AICP Manages AECOM Denver Transportation Group. Principal for all On -Call contracts OIC Multiple concurrent project principal assignments. 20 Years/5 Years 1 25% Rick Romig, PE Quality manager responsible for various projects CDOT On -Call Quality Manager concurrently including multi -million dollar projects. 28 Years/14 Years 1 25% John Sabo, PE Roadway design task manager for multiple projects, City of Boulder On -Call Roadway/Civil from small to large in scale and cost. Roadway task Rio Blanco County On -Call 1 14 Years/11 Years 1 60% manager for design and post -design projects. Corey Lang, PE Experience roadway design task manager having CDOT On -Call Roadway/Civil delivered on a variety of sizes of task order projects. 13 Years/2 Year i 60% Lisa Candelaria, PE Experience working on traffic and planning for small City of Denver On -Call Traffic/Planning to large scale projects. City of Centennial On -Call 7 Years/5 Years 1 75% City of Littleton On -Call Don Holloway, PE, PTOE Strong traffic/planning background with experience City of Denver On -Call Traffic/Planning as a City traffic engineer and possesses and traffic City of Centennial On -Call 25 Years/13 Years 1 60% simulation expertise. CDOT On -Call Tom Fuentes, PE Extensive knowledge in drainage design, water CDOT On -Call Drainage/Utilities quality, floodplains, SWMP plans, stormwater and Pueblo County On -Call 35 Years/8 Years 1 60% more. Chuck Kennedy, PE Experienced with utility agencies in the Fort Collins CDOT On -Call Drainage/Utilities area and with specialized water quality design. Pueblo County On -Call 16 Years/14 Years 1 75% Gary Maji, PE Strong background in managing engineering and CDOT On -Call Structures construction projects. Structures project manager for City of Denver On -Call ® 24 Years/13 Years 1 60% numerous projects throughout Colorado including Rio Blanco County On -Call lead Bridge engineer for over 17 bridges in CDOT R4. Joshua Laipply Structures project manager with design, rating and CDOT On -Call Structures inspection experience. Innovative project delivery City of Boulder On -Call 42 16 Years/6 Years 1 30% through Colorado Bridge Enterprise. Pueblo County On -Call Skip Hiad, PE Extensive experience as construction manager and CDOT On -Call Construction inspection task order manager. Responsible for over 70 City of Boulder On -Call 38 Years/5 Years 1 30% transportation infrastructure projects with up to 50 staff. Pueblo County On -Call Steve Wilensky, RLA Transit station and TOD design manager on multiple City of Denver on -Call Transit Design major transit corridors including T-REX. 37 Years/6 Years 1 30% Rhonda Bell Experience in creating detailed, action -oriented small City of Denver On -Call Transit Design area plans and station area design for communities 11 Years/6 Years 1 60% located near transit. Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineenng, Design, Drafting & Survey Services On -Call Is AECOM Skillfully Balanced I Team and People Innovative Capabilities In addition to sTandard services tfiai miisffirms can provide, AE�OM offers unique capabilities shown below We understan you vnll not need allof this expertise over the life of this contract, but with AECOM you will know that you have what you need within a phone call away, no matter the complexity of the issue to be solved. Alternative Delivery Asset Martaement Value Engineering ............................................... Through the Colorado Bridge Enterprise, AECOM helped the client introduce the CM/GC delivery method with four under alternative delivery in one year. Traffic For Virginia DOT, AECOM provides TMC field maintenance, design and construction of 288 CCTV cameras, 244 VMS's, and 552 miles of fiber optics. ITS Using Cartegraph Software, AECOM is preparing a reflectivity inventory for over 20,000 signs —prioritizing to meet 2009 MUTCD requirements Multimodal Integration AECOM is working with Kiewit & RTD to design the hub of FasTracks, at Denver Union Station. AECOM performed value engineering on SH-392/1-25, saving the project hundreds of thousands of dollars. Transit Signal Priority ........................ a In Washington D.C., AECOM implemented a transit priority system of 33 intersections using 20 GPS transmitters communicating to Type 170 controllers. Grants/Special Finance Districts ............................................. TIER AECOM worked with the Florida DOT AECOM offers an economist team AECOM provided VISSIM® demand and to develop a masterplan and design for that prepares economic cost/benefit operational modeling for the US 50 Over their "SMART Sunguide Transportation analyses and finance advisory services the River project. Management Center." to position projects for funding and finance opportunities. Proposal No. 7392. 1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 16 AECOM ll. Organization Chart / Resumes ABOUT OUR KEY STAFF This team offers outstanding people who are committed to the success of each and every project. The following brief resumes highlight the experience of the key staff on this team on the types of projects you may need help with, ranging from simple to complex assignments. Education/Registrations Alan Eckman, PE, P I E M.B.A., University of Colorado, 2004 Contract Manager B.S., Civil Engineering, Colorado State University, 1998 PE/Colorado, Registration No. 37584, 2003 Professional Traffic Operations Engineer, No. 1781, 2005 Alan is a Project Manager and Associate Vice President. Alan has managed many different on -call contracts and task orders for various municipal, county, and DOT clients throughout Colorado. Hi expertise includes management of transportation planning and design, site assessments, private development reviews, and projects requiring multidiscipline project teams, public process, and agency coordination. Alan has been a strong partner with the City of Fort Collins to deliver the SH 392/1-25 Interchange with multiple task orders throughout project development, design and construction support services. Simple » Task order manager for Colfax Safety Audit in Denver Colorado. » Task order manager for City Park Traffic Circle in Denver Colorado. » Task order manager for Hancock Re -Alignment Study for City of Colorado Springs. » On -call contract manager for City of Littleton, City of Centennial, City of Denver, and City of Colorado Springs Traffic Services. Complex » SH 392/1-25 Interchange, Project Manager spanning a 4-year period which started at the concept level and continued through funding and construction contract documents. » Denver Union Station, Multimodal operations and traffic manager for the bus, street, and pedestrian circulation. » United Avenue Reconstruction, On -call task order manager for environmental clearance, design, and construction management of 3 miles of arterial re- construction in Pueblo. Education/Registrations John Sabo, PE BS, Civil Engineering, University of Colorado, 1997 "n. Roadway/CivilPE/Colorado, Registration No. 36790, 2002 John is a Project Manager with extensive experience managing on -call contracts and task orders for clients throughout Colorado including El Paso County, City of Boulder and CDOT. His expertise includes managing multidiscipline project teams on transportation projects from the conceptual analysis/planning phase through completion of the constructed project. His projects have included feasibility studies, safety improvement projects, local and arterial rural and urban street projects, highway, interstate, and interchange projects involving stakeholder coordination, public process, and agency coordination. Simple » On -call Task order manager for S. Academy Trail for El Paso County. » On -call Task order manager for Mineral Blvd, turn lane improvements for City of Littleton. » On -call Task order manager for Bemis/Court Place re -alignment concept study for City of Littleton » On -call Task order manager for SH 115 Gate 6 for CDOT Region 2. » On -call Task order manager for SH 115 Gate 5 North for CDOT Region 2. » On -call contract manager for Boulder County, City of Boulder, El Paso County and CDOT NPS Complex » US 24/Elbert Road Improvements, On -call Task order manager for survey, ROW plans, environmental clear- ance, lighting, hydrology/hydraulics, signing and pavement marking, and construction phasing plans for CDOT in Colorado Springs. » 14th Street Transit Station Improvements, On -call Task order manager for urban design, lighting, util- ity coordination, and roadway, drainage and traffic design on 14th Street for the City of Boulder. » SH 392/1-25 Interchange, Deputy Project Manager. » 1-76 Fort Morgan to Brush, Deputy Project Manager Proposal No, 7392. 1 Fort Collins, Colorado I Civil Engineering, Design, Drafting & Survey Services On -Call 17