HomeMy WebLinkAboutCHANGE ORDER - BID - 7287 ADDITION & RENOVATION TO MAIN BRANCH LIBRARY (6)Fcltryf c ollins gy m. Viz: �..•'.`= i on Services Change Order Form PROJECT TITLE: Poudre Library PROJECT NUMBER: PO# 9116852 CONTRACTOR: Heath Construction CHANGE ORDER NUMBERChange Orde OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 Fort Collins, CO 80522-0580 970.221.6610 970,221.6534 - fax In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1 &2 See attached sheet for detail. Changes compensation from fixed fee to time and direct cost basis with a not to exceed. 3 The contract cost will not be effected. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) $2,620,200.00 $283,437.53 $0.00 - $'TZ90630? 0.54 % 11.36% $2,917,844.03 ACCEPTED BY: ,%r / � Z4,1. ) DATE -;;�,-R 7, l2 REVIEWED BY: APPROVED BY: H th Constructi n P%Kct Repentative r d Library District (CFC Facilities) Project Mgr PRPLD Library Director DATE: � /7 DATE: cc: Contractor Purchasing Project File Poudre River Library District Open Items List Date: May 30, 2012 127 IPR - 31 - Handrail @ Rear Exit Landing Closed lPer City & Code Requirements 127a - D&E Steel 1 LS ! 0,00 To be done thru Citymaintenance 1276 - Heath Construction 1 LS 0.00 Open item 127 Total I I atto I 2A 128 Blank off existing mechanical room louvers I I I Closed I Blank off mechanical room louvers 1128a - Lind's Plumbing 1 LS 0.00 1128b - Heath Construction 1 LS 0.00 Open Item 12a total 1 0.00 2A I I 129 (Provide & Install domestic water pump I I I I I Closed domestic water um 1129a - Lind's Plumbing1 1 LS 0.00 !Done !Done thru City maintenance 1129b - Heath Construction 1 1 LS 1 0.00 1 Open Item 129 10181 1 1 I 0.00 1 2A 130 (Provide & Install outdoor air sensors I I Closed I (Boiler Outdoor Sensors 1130a - Lind's Plumbing1 LS 0.00 ME Group has stated this should have been 11301b - Heath Construction 1 1 1 LS 1 0.00 in the scope of the work. Open t�Tola 0.00 ! 2A 131 IRe ro ram Boilers once sensors are installed Closed Boiler reprogram after sensor installation 131a - Lind's Plumbing1 LS 0.00 ME Grouphas stated this should have been 131 b -Heath Construction 1 LS 1 0.00 in the scope of the work. pen Item 131 Tota 0.00 2A 132 IPR - 30 - 4' % 8' Tackboard outside circ room Approved Additional tackboard 132a- Specialties Contracting1 LS 509.00 Material on order 132b -Heath Construction 1 LS 144.94 _ ._ cw pen Item 132 total 41 1 .15, 133 IRemove & reinstall green table for graphic Approved PS remove &-reinstall green table `l 133a - AZARS 1 LS 400.00 Work done'&`A roved b Owner 133b -Heath Construction 1 LS 0.00 k' �"T'^^1 [7 -�. 1 pen item 133 iota l'� ' 424.00_SK 2A I Ri 134 IChiller/Pump Control Closed AddIllonalcMNer.conlrols. 2T 134a-JCI 1 LS 0.00 To bedone.thru maintenance 134b - Heath Construction 1 LS 1 0.00 _ Open Item 139 Total I I 0.00 I 2A I 135 Repair damage caused by movers, eta. - ' -' Open - '. . ": Damage caused fryov mers - 135a - Maximum painting 1 LS 1 000.00 / (' -7 Work done on verbal approval of ovmer 134b - Heath Construction 1 LS 1 159.52 r F! 7� J 5 S' pP . Open Item 135 Total - - �'?{Lg 2A 136-,- Credit for Soffit DetailOpen t><'Original Men's'FIR soffit v�as.not installed - 136a-Phase2_. 1-LS- (400.00)- . Open Item 136 Total .. 3(400.66) -2A 137 PR 29 - Add blinds in Jeans Office I I Approved Add blinds to office 215 137a - Blind Shine 1 LS 450.00 1371b - Division ten 1 LS f 140.001 `- I I Fl- Open tern 137 notai I 1- -625.40 1 2A I Vi 15. ! 138- PR 32- HVAC Modifications- "' ' : . Open HVAC Modifwation5 by ME Group r13Ba-PVA' - 1 LS 1916.00 � 137b =JCI - � - 1- LS 0.00 137c - Heath Construction 1 LS 1 159.52 ' Open Item 138 Total ,a .3,260.05 2A' '139: -New Building Signege-- Open' J' u�IwdTwm3ricaLdgn.jtlarge enough 139aNew - Building Division ten �"�"' �'� . 1' LS 501.00 � rrequested-k nage + Open item 139 Total' - l:!`W 6'J ' 2A 140 ; Additional GC's eno'"+�� *�' For work not complete as information or - s-d;?140a- Heath . +;' .1 LS 5,606.48 s,;, �"'�'W9ta.�-, Lim/,. 113 directlonwas not received in order to complete Open Item 140 Total 5, .87 - 2A '. b a reed to end date of 5/15/12 141•:- Missed PR 6 Scope - 6'T°,� Open Missed Scope of PR 6 '�-147a.-D&E Steel-LS LS 00 i, N ,14/b=Dee 7 �S�i816•'9g m-141.Totel_,_'. ..�--... _. .,_ _�_�'"'"-�__ - 2,459.20-.-.-2A'-- I I I I I I I I Potential Additional Cost Items !'G' 1 _ ! -_- Civil issues???____ (Blinds issues 79? - PROJECT TOTAL OPEN ITEMS Phase 7A Total Chances � ! �5736,371.32 305,128.58 $136,311.3 (Phase 18 Total Changes I $101.635.83 1 (Phase 2A Total Chances I 558,391.69 I I 1Phase 2B Total Changes 1 $6,340.54 1 I 5302.669.38 I I I I I I I Poudre River Library District Open Items List Date: May 30, 2012 I I IJ I I I OPEN ITEMS - I I (Project Name: Poudre River Library �1 l Project Number:1280507 IPro'ect Manager: Paul L. Ehrlich Jr. (Date: 6129/12 ! Open items of phase 1A and portions of IS were approved by the Poudre Library team prior to execution of the change order request approval in order to meet Phase 1A schedule of completion. Open .. Item .: Approx. 'Approx. Status / CDR k / Owner CO Number Description of Open Item OTY UNIT Unit Cost Total Cost Phase Pay App It a . - Comments 1 1 FOB System Re -Location to 2ntl Floor. I Closed 0 1 0 INo Cast Impact (Colorado Doorways I I I LS 1 0.00 0.00 i 1 1 2 1 Johnson Panel Relocation I I I i I Closed 1 0 1 0 INo Cost Impact !Johnson Controls 1 1 LS 1 0.00 1 0,00 1 1 1 1 3 1 Existing Roof Drain Relocation 0 1 0 1 0.00 1 0.00 1 Closed 1 0 1 0 (Drains shown on Plumbing Drawings 4 1 Tree Protection & Mulch Roads I I I I Aloproved 1 1 1 (City Requirement 4a-Martin& Sons 1 1 I LS 11,793.00 (Work Com tared lob -Tem labor 1 1 LS 1,a21.97 14C - Heath 1 1 LS 850.33 _ 10 n Item 4 Total 1 4,309.22 1 IA I PA 4 2 6 Complete Fire Alarm System I Approved 2 Stuxisrgeon to price additional cost of maintaining etin system, 5a-Sturgeon cost to maintain existing system through phase I 1 LS 3,721.SO I I IWork Completed (Open Item 5 Total 3.945.00 1 1 A I 1 8 1 6 1 Temporary Light Fixture Package Approved 3 1 IFixture Package not here 1/23/12 16a - Sturgeon 1 LS 17.275.00 1 _ I (Work Completed (Open Item 6 Total 1 18,312.00 1 1 A 7 7 I Cut electrical in floor Approved 10 1 1Unfomeen Condition 17a-Sturgeon 1 LS 7.688.94 1 i i _ I (Work Com letetl !Open Item 7 Total 1 8,150.28 1 1 A 1 1 7 1 8 1 Additional Drywall Restroom 2ntl Floor I I I I I Approved 1 11 1 1Unforseen Condition 18a-Phase 2 1 1 1 LS 1 2,930.00 1 1 1 _ 1 Work Completed 18b-Slur eon 1 1 1 LS 1 0.00 1 1 1 I lOpen Item 8 Total I I 1 1 3.105.80 1 1A I PA 4 1 2 1 9 1 Change Exterior Glazing to Solar ban 70XL I 1 I 1 I Approved 1 4 1 IAs directed by Architect i9a- Commercial Glass 1 1 LS 11.270.83 1 1 1 _ 1 (Work Completed (Open Item 9 Total I 1 1,347.08 I to I PA 4 1 1 1 10 1 Cable Tra Connection 1 II I Closed 1 0 1 0 IThis item was also PR-12. 1(p -Stu eon 1 1 1 LS 1 0.00 1 !en Item 10 Total I Op I I 1 0.00 1 _ 11 2" Sprry Foam in Lieu of 1 1/2" Spray Foam I I 1 Approved 6 As directed b Architect 11a-Technical Foam I 1 I LS 1 1,700.00 1 1 1 Work Completed j0pen Item 11 Total I 1 1,802.00 1 1B PA4 1 1 12 1 Moisture Mitigation @ Entry & vestabule I I I I I Approved 1 7 In order to maintain Flooring Warranty 112a - AFS I 1 I LS 1 3,455.19 1 (Work Completed 112b - Red Willow 1 LS 0.00 112C - Aggragate Industnes 1 LS 0.00 !Open Item 12 Total 1 1 1 3.662.50 1 1A 12 13 ! Project Delays - Permits I Closed 67 11 3a - Heath 1 1 LS 0.00 1 1 (Open Item 13 Total 1 0.00 1 26 1 1 Add Temp Walls @ Entry Not Shown on 14 Drawings I I i Approved 8 I (Missed Coordination 114a- Phase 2 1 1 LS 1 736.00 1 (Work Completed ]Open Item 14 Total I I 1 1 780.00 1 1A I PA a I 2 15 Additonal Requirements by FO to Get TCO I i I I I Approved 1 12 1 (City Requirements 15a - Sturgeon - Add Frog eyes and exit signs I 1 LS 1 2,777.82 1 1 1 1 INeed sub COR ]Open Item 15 Total I 1 1 2.94449 1 1A 1 _ 1 2 IWcrk Completed Relocate 1 1/2" HWSR Line discovered in 16 demoed wall I Approved 13 Unforseen Conditions 116a-Linds Plumbing1 1 LS 11,216.00 1 1 [Work Completed !Open Item 16 Total 1 1,288.96 1 1A 1 1 17 Delete MSB - 1 & Faucet 2ntl Floor I I Approved 1 14 1 IAs directed by Architect 17a-Linds Plumbing I I I LS 1 (231.00) 1 (Work Completed ;Open Item 17 Total ! 1 (231.00) 1A 1 Po0dre River Library District Open Items List Date: May 30, 2012 18 I Provide HWC - 3 Heating Coil 118a - Linds Plumbing I I 1 LS 5,938,00 I 1 Approved �_ (Missed Scope From Addendum 1 1181b-PVA 1 I LS 1,014.00 I I !Open Item 18 Total 7,369.12 1 2A I 10 1 19 I Move existing Piping for new Wall Construction I Approved 15 IUnforseen Conditions 119a - Linds Plumbing 1 LS 1,018.00 1 1 Work Completed, Call Mark (Open Item 19 Total 1,079,08 1 1A I 1 12 1 20 1 Grout Selection fI Closed 1 16 0 As selected by Architect 120a - Phoenix Masonry 1 1 1 LS 1 0,00 ! (Work Completetl !Open Item 20 Total I I I 1 0.00 1 16 1 1 1 21 1 Stem Wall Elevation Bust I I I I I Closed 1 17 0 (Drawing Conflict between Sruc. & Arch. .21a-Aly Construction I 1 I LS i OAO ! (Work Completed ;Open Item 21 Total I I I 1 0.00 1 16 ! 1 22 1 1 at Floor Restrooms i I i I Approved 1 18 Un(Wotorseen Condition 122a - Phase 2 1 1 1 LS ! 1,618.00 rk Completed pen Item 22 Total 1,715.08 1 to 1 23 1 Take Exterior Walls of Elect. 251 to Deck I I I I I Approved 1 19 1 1Unforseen Condition 123a - Phase 2 - 1 LS 1,442.27 Work Completed Open item 23 otal I 1 1,528.81 1 1A I I 1 I 24 Janitor's Closet # 228 Walls & Coiling Approved 1 - 20 Field Condition 2da -Phase 2 1 LS 942.17 Work Completed pen Item 24 ota 998.70 1 1A 1 25 Ki[chen # 223 Atlditional Patching & Finishing Approved 21 Field Condition 125a -Phase 2 1 LS 729.00 (Work Com feted pen Item 25 Total 1 772.75 1 to I 1 5 1 26 Tem Wall by Drop Box Area I' I Approved 22 (Field Condition 125a - Phase 2 . 1 LS 295.50 1 (Work Com feted Open Item 26 Total 313.23 1 1A 1 1 5 27 1 Changes to Door Hardware Schedule I Approved 43 Per Architect Returned red line submittal 127a - F&C Door 1 LS 4,910,00 1 Work Completed Open Item 27 ota 1 5,204.60 1 to I 1 11 1 28 Additional General Conditions Phase 1A Work Approved I lextension Added 's due to additional vmrk and no of schedule 28a - Heath Construction 1 1 LS 11,595.20 I l pen Item 28 local I 1 1 11,595.20 1 to 1 54 9 1 29 ASI.1 1 1 LS 0.00 1 1 Closed 0 0 !Not Issued 10pen Item 28 Total 0.00 30 1 ASI-2 I Approved 1 23 1 Building Department Comment [Turn Copy Room 22290 degrees I (Work Com leted 130a - Gorilla 1 1 ! LS 353.00 1 1 130b- Phase 2 1 1 LS 11,228.48 130c - Sturgeon 1 LS 0.00 130d - Maximum Painting 1 LS 50.00 1Open Item 30 Total 1 1,729.37 1A 1 31 1 ASI-3 I I Closed 1 24 1 I Work was under scope of the work I Restroom Tile Changes I 1 1 1 (Work Completed 131 a - Colorado Floonnorks 1 LS 0.00 I f I I I lOpen Item 31 Total 1 0.00 1A 1 1 1 32 I ASI - 4 Closed 0 1 0 INo change to contract ILi ht Lauver Locations 1 132a. Light Lower 1 LS 1 0.00 1 1 I Open Item 32 Total I I 0.00 I 33 1 ASI - 5 1 1 I I 1 Closed 0 I 0 I Work done prior to pour of grade beams (Heath - Adjust 100 A to bottom of Waffle Slab 1 0 1 0 1 0.00 1 1 !Open Item 33 Total 0.00 1I ! 34 1 ASI-6 I I I Closed 1 0 1 0 (Work done prior to concrete pour. (Door - 160 A clarification I I ( I I I 134a - Aly Construction 1 1 LS 1 0.00 1 1 1 (Open Item 34 Total 1 O.00 35 1 ASI -7 I 1 Approved 1 32 1 IRFID Gate Locations IRFID Gate Pouch In Conduit I I I (Work Completed 135a - Stur eon I I I LS 1 1,237,32 1 135b - Heath 1 1 1 LS 1,068.50 1 1 I 1 Open Item 35 Total I 1 2,444.17 1 1 A I I 1 36 1 ASI -8 - R 1 I ! Closed 1 0 1 0 (For Information (Critical Shelving Dimensions 1 1 1 LS I 0.00 I I I I I 'Open Item 36 Total I 1 0.00 1 1 1 1 37 1 ASI-9 1 1 1 Closed 1 0 1 0 Not Issued 1Open Item 37 Total I I I LS I 0.00 I 0.00 I I 1 1 38 1 ASI-10 1 1 1 1 1 Closed 1 0 1 0 INot Issued !Open Item 38 Total 1 1 1 LS ( 0.00 1 0.00 1 Poodre River Library District Open Items List - Date: May 30, 2012 I I I I I I I ASI - 11 f I 1 Approved 1 45 1 1Dimension bust between Arch 8 Struct o entry vestibule 8 ASI -7 T 1 1 IWork Completed se2 1 1 LS 9,3t0.85 I I I geonS810.0mercial Glass I I LS 1 0.00 1 I i39d-CS Metal Inc. 1 1 1 LS 15,357,00 1 1 1 1 139e- Insulation 1 1 1 LS I 0.00 I T I I 139f - S ray Foam 11 1 LS 1 700.00 1 I 1399 - Masonry 1 1 1 LS 1 224.00 I 1 1 (Open Item 39 Total 1 1 17.385.96 1 to 1 6 1 40 I ASI - Door Hardware I ApprovedAppntvedT 46 1 Rated Corridor Issue lAdd doors 115, 227A and 2276 I II !40a-F8C Door 1 1 LS 1 5,321.00 1 I I I 40b-Door Zone 1 1 LS 1 420,00 1 Open Item 40 Total I 1 1 6,085.46 1 1A I 1 11 41 i ASI- 13 1 1 Closed 0 1 0 [ASI 13 issued 1/26/12 Mason wall to recast alignment issues I I I ASI 13 is not an owner cost item. 41 a - Heath Construction I LS 1 0,00 I Open Item 41 Total 0.00 42 1 ASI- 14 1 1 Closed 1 0 0 IASI 14 issued 1/26/12 Revised Children's area floor pattern !No cost impact to project 42a - AFS 1 LS 1 0,00 Open Item 42 Total 1 0.00 43 ASI. 15 1 1 Approved 1 47 1 IASI - 15 issued 1/30/12 (Comer Guards Room 222 corners 143a - Specialties Contracting 1 1 LS 1 75.00 (Open Item 43 Total 1 1 79.50 1 1 B 1 1 5 43 1 PR - 1 I Aperoved 1 9 1lst Floor IT room Zew IT Closet Work Completed a - Phase 2 1 1 LS 1 1,154.00 [ 441b - Sturgeon 2 1 LS 1 2.983.00 I 1 [ 144c-AFS 1 1 LS 1,562.60 44d - Maximum Painting I I I LS 1 175.00 1440 - Heath Construction - Locks 1 LS I 71.15 I I [ Open Item 44 Total 1 6.302.50 1 to 1 5 I I 1 I I 45 1 PR - 2 f Approved 1 33 12nd Floor IT Room ITem IT Room for MIS - Work Completed 45a-Phase 2 1 LS 1 928.66 145b-Sturgeon 1 LS 1, 1 45dc-Co'4Door De I LS 03.0109 1 1 LS 0.00 lOpen Item 45 Total 1 2,184.21 1A 4 1 46 1 PR-3 i Approved' 42 1 IConflicts Resolution Radiator / Casework Conflicts 146a-Azars 1 LS I 0.00 1461b - Linds 1 1 1 LS 110.790.00 146c-JCI I 1 LS 1 1,700,00 46d-PVA 1 LS 2,102.00 46e-Slur eon 1 1 LS 1 0.00 146f - Phase 2 1 1 1 LS 1 704.03 (Open Item 4 Total 1 16,213.79 1 1B 4 477FF PR-4 A roved 1 34 [Overhead Or 8 Rated Cooridor Doors e gaynor I LS 0.00 Work Compl ted 1 1 LS 1 814.00 1 1 1 LS 1 2.025.00 I -oorone I I I LS 1 1,680.00 1 147e - PVA 1 1 1 LS 1 72.00 1 I 147f - Linds 1 1 1 LS 1 4.528.00 1 I 147 - Slur eon I / I LS 1 1,784.79 1 147h - Phase 2 1 1 1 LS 1 1.971.31 1 I I (Open Item 47 Total 1 13,647.61 I 1 B 1 1 3 1 48 1 PR-5 I I I Approved 1 35 Ceiling, Vanity, 8 Elect. Changes [Ceilinq Coordination Work iI 148a -Han em High 1 ! LS 1 651.08 1 [ !481b - Azars 1 1 LS ! 0.00 1 148c-Sturgeon I LS 1 7,517,00 1 148d - Linds 1 1 LS 0.00 148e-PVA 1 I LS 1 0,00 [Open Item 48 Total ! 8.658. 16 I 1 B 1 1 4 1 I I I I I I I I I 1 I I I I I I I I I I Po4dre River Library District Open Items List Date: May 30, 2012 I I 1 1 49 1 PR - 6 1 Approved 1 73 1 [Wood Trash Enclosure (Construct trash enclosure per City, requirements IPR - 006 issued 2117/12 19a -Dean Contraclin 1 LS 1 4,760.00 49b - Heath Construction 1 1 LS 453.64 (Open Item 49iotal 1 5,525A6 1 26 1 1 10 1 50 I PR -8 1 1 Approved 1 36 1 (Building Department Comments Building & Fire Department Comments Rated Corridor j ,Work Completed ISOa-Gorilla I I 150b- Phase 2 1 1 LS 11,071.25 1 I I 150c - F&C Door 1 1 LS 1 0.00 1I I50d - Door Zone I / I LS 1 0.00 ! I 150e - Division Ten 1 1 1 LS 1 356.00 1 1 1 1 1 150f - Sturgeon 1 1 1 LS 1 383.42 1 1 1 I50 - PVA 1 1 1 LS 1 0.00 1 I50h- Dean Contracting I I I LS 1 0.00 1 I (Open Item 50 Total 1 ( 1 12,519.31 1 1A I PA 4 1 2 1 51 1 PR - 9 1 1 1 Approved 1 68 1 IElecincal Plan Revisions Electrical Plan Revisions I IPR revision 2.21.12 151a-Sturgeon 1 1 LS 111,465.87 I (Open Item 51 Total 1 12.153.82 1 1 B 1 ! 8 I I I I 52 1 PR -10 A22roved 37 Multi Pu ose Room (Modifications to Multipurpose North 152a-Azars 1 LS 2,500.00 I 52b-Stu eon 1 LS 0.00 Open Item 52 Total I I 1 1 (2.500.00) 1 1 B 1 1 5 53 1 PR-11 1 Closed 1 74 0 10 erable Wall Structural Changes O erable wa11 and soffit changes 1 No additional cost to the owner. 53a - D&E Steel 1 LS 0.00 531b - Phase 2 1 LS 0.00 53c - Maximum Paintin 1 LS 0.00 53d - Heath Construciton 1 LS 0.00 pen Item 53 1 otai 0.00 2A 54 PR - 12 Approved 1 5 IT -Cable Tray IT Racewa Work Completed 154at1tem Electric 1 LS 4,072.00 OpTotal � 4,316.32 I � to 5 55 PR - 13 A roved 75 AMH Modifications (Mo exterior for AMH Machine 55ar - 1 LS 770.00 175.00 155b - Gonlla Demo 1 LS 1 1,171.00 55c - Heath Layout & Supervision 1 LS 516.70 1 55d - Phase 2 1 LS 842.00 55e - Azars 1 1 LS 110.00 55f - Specialties Contracting 1 1 1 LS 1 153.00 55 - Linda 1 1 LS 600.00 1 800.00 1 ISSh - Slur ecn 1 LS 450.00 0.00 1 pen Item 55 ota 4.889.46 1 2A 1 1 10 1 56 1 PR - 14 I I Approvedl 76 1 Additional Si na e !Addition of Lh,l; and k si na e 156a - Division Ten 1 I LS 1 1.927.00 1 ;Open Item 56 ota I I I 2,042.62 1 2A 1 10 57 1 PR-15 1 Approvedi 48 1 IPR 15-WC-issued 1127/12 !Wallcovenn Graphics changes I I I 157a - Hang am Hi h 1 1 1 LS 1 0.00 1 1 157b - Maximum Painting - WC 1.3 & 6 1 1 1 LS 4,600.00 1 9,200.00 1 I 157c - Division Ten Si na e I I I LS 116.970.00 1 1 1 I (Open Item 571 atal I I 1 1 13.342.20 1 1 B I i 9 1 58 1 PR-17 I I Approvedi 49 1 IPR-17-Ext. Wall -issued 1/12/12 Perimeter Wall 2nd Floor Exterior I Option 1 1 1 1 1 158a - Phase 2 1 1 1 LS 9.918.61 11 158b - Maximum Painting 1 1 LS 651.00 1 11.203.79 1 1 1 1 1p tion 2 1 I I58aa - Phase 2 1 1 1 LS 1 0.00 1 0.00 )Open Item 58 Total 2A 1 1 3 1 59 I PR- 19 I Approved 1 25 1 l8ack Flow reventor& FS4 (Change Specified Back Flow Preventor I !Work Completed 159a - Linds I I I LS 767.00 1 1 Open Item 57 Total (774.67) iB IPA4 2 60 1 PR-20 I A roved 69 i !PR -20- issued 1/30/12 IConnectrac and Wiremold Systems ! IAwaiting CAD files from arch. 160a - Stur eon Elecmc I 1 1 4,048.00 Need subcontractor price. 1 Open Item 60 Total 4,290.88 1 1 B i 8 1 Pdudre River Library District Open Items List Date: May 30, 2012 I 61 1 PR - 21 _ I Ap2roved 1 77 PR - 021 -Interior Sill racing (Provide Conan sills 61a-Azars 1 LS 10,940.001 [61b-Heath 1 LS 154.35 lO tion 2 161AA-PVA -metal Ca 1 LS Open tem 61 ota 11,760.01 iB 6 62 1 PR-22 1 A roved! 78 !PR - 22 - issued 2/17112 ]Clean columns and drywall wrap (1) column ]Clean Columns 162a - Heath Construction 1 1 LS 0.00 !62b - Phase 2 1 LS 495.00 162c - Sturgeon 1 LS 0.00 162d - Maximum Painting 1 1 1 LS 1 0.00 1 162e - Specialties Contracting 1 1 1 LS 224.00 (Open Item 62 otal I 762.14 16 1 7 63 1 FIR -004 1 1 1 1 Closed 1 56 1 0 IThis became PR-021 (Provide low profile metal ca - Prefinished I I I 163a-PVA I I I LS I 0.00 I I 163b - Maximum Painting 1 1 1 LS 1 0.00 1 1 163c - Heath Construction 1 1 LS 0.00 1 1 1 1 1 (Open Item 63 Total 1 0.00 1 18 I 1 1 64 1 RFl-006 l 1 Approved 57 1 IVAV's to be new IVAV Boxes 01-08&02-07 I I (Work Completed 64a- PVA I 1 I LS 1 794.00 [64b-JCI 1 LS 0.00 Open Item 64 Total 1 841.64 1 1 B 1 5 65 1 RFI-009 1 1 Approved1 25 I Unforseen Condition IRe-Route Comcast Exterior Work Completed 165a-Sturgeon I 1 I LS 1 1,114.42 165b- Martin & Sons 1 LS 0.00 I I !Open Item 65 Total 1 1,181.29 1 1A I PA 1 1 fib 1 RFl-015 Approved 1 27 (Drawn s IHi Abuse Gypsum Work Completed 66a- Phase 2 1 LS 2,468.43 [ Open Item 66 Total 1 2,616.53 1A I PA 4 2 67 1 FIR -016 1 APproved 1 28 IDrawin s Deletel/2'G Sheath! (Work Completed 67a - Phase 2 1 LS 776.35 [ Open Item 67 Total (776,35) 1A 1 68 RFI 021 Approved 29 1 1 Drawings Conflict Delete new baseboard ® new Casework 1 i i i I 168a. Lind's Plumbing 1 LS 0.00 1 1 1 1 Baseboard will become Owner stock [Open Item 68 Total 1 0.00 1 18 I 1 1 69 1 RFI-023 A22roved 38 IDraw n s I Exhaust Ductwork Restrooms & Elect/Jan Closets Work Com leted '69a-PVA 1 1 1 LS 1 4,463.00 69b - Linds 1 1 J LS 1 385.00 Open Item 69 Total 5,138.88 1A 11 1 11 1 70 ' RFI 025 Approved 50 Drawin s Schedule Door 171 A - Add EPT 10 Power transformer Work Com feted 70a - FF Door 1 LS 1 804.00 (Open Item 70 Total 1 1 852.24 1 1A 1 1 5 1 71 1 RFI- 027 1 1 Approved 30 1 1 UL Code Requirement Overhead Coiling Door Safety Ede Work Completed 71 a- Front Ran a Ra nor 1 LS 665.00 I Open Item 71 Total 1 704.90 1 1 A I 1 1 1 72 1 FIR .035 1 Approved 1 31 IField Condition I Different Coiling Elevations 2nd Floor RR Work Completed 172a - Phase 2 1 1 1 LS 1 973.00 1 1 1 ! I 1 Open Item 72 Total I I 1 1 1.031,38 1 1A I 1 1 1 73 1 FIR -039 1 1 Closed 1 58 1 0 (Owner to perform at a later date I Room 191 Ductless AC I 173a-PVA - maintain exist!ng system I LS 0.00 I 173b - Heath Construciton 1 1 LS 0.00 I I73aa- ,new PVA - Option to remove system and install I duct 1 LS 0.00 )Open Item 73 Total I I I 0.00 2A I I 74 1 RFI-042 1 1 1 Approved 1 39 1 (Drawings Conflict IVAV 02-07 Access I I I I I !Work Completed 174a - PVA I I I LS 1 250.00 174b - Phase 2 1 LS 1 711.50 I 1 I [Open Item 74 Total 1 1 1.019.19 1 1A I 1 5 1 I I I I I I I I 'Poudre River Library District Open Items List Date: May 30, 2012 75 RFI-043 11 (Approved 1 40 1 1 Drawings Conflict IVAV 02-10 Access ( 1 (Work Completed i75a - PVA I I I LS 1 0.00 175b - Phase 2 1 1 LS 1 711.50 1 1 �I (Open Item 75 To I1 1 754,20 1 I A 1 1 5 1 I I I I I I I 76 1 RFF 053 Approved 41 1 1Drawing Clanfication (Head Condition @ Exterior Windows I Work Completed 176a - Heath 1 LS 2,211.23 i 76b-Commercial Glass 1 LS 1 000 1 Open Item 76 Total 1 1 2,211,23 1 18 1 1 5 77 1 RFF 056 1 1 1 1 Approved 1 70 1 (Roof Drain/Mech Conflicts I Root drain / mechanical conflict resolution I I I 177a-PVA 1 t t LS 1 473.00 1 1_ 177b - Heath Construction I I LS 1 0.00 1 1 Open (Item 77 Total I 1 1 501,38 1 1 B 1 12 1 78 1 RFI- 057 1 1 1 1 Approved 1 51 1 IField Condition Change 78a - Lind's Plumbin 1 1 1 LS 973.00 I I I Work Completed Open Item 78 Total I I 1 1 (973.00) 1 1 B 1 5 1 79 1 RF4061 1 1 1 1 1 Approved 1 52 IDrawin s Conflict Circ Room 120 Exterior Walls I I I 179a - Phase 2 1 LS 1 2,885.13 Work Completed 179b - Maximum Painting 1 1 LS 1 0.00 i i I (Open Item 79 Total I 1 1 3,058.24 I 18 1 1 5 1 80 1 RFI-062 Closed 1 53 1 IExtenor Window Flashing_ IModify Exterior window Hashing details i i i Option not accepted 180a - CS Metal Inc. 1 I LS 1 0.00 1 I 80b - Heath 1 LS I 0.00 I Open Item 80 Total 1 0.00 1 1 B 1I 81 1 RFF 066 1 Approved 1 59 1 (Power for Secunty Doors I Provides power to doors 171 and 171 A I 181a-Sturgeon Electric 1 1 1 LS 1 1,850.00 _ I (Open Item 81 Total I 1,g61.00 I 1B 8 I 82 1 RFF 068 I 1 Approved 60 1 lAdd switch to room 226 I Provides switch for room 226 I 82a - Sturgeon Electric 1 1 LS 1 779.79 1 jOpen Item 82 Total I 1 826.58 1 1 B 1 1 12 1 83 1 RFF 069 I 1 Approved 1 61 1 IFixture 8 pipe Conflict (Pipe & 2 X 4 1rouNer Conflict 1 I 183a - Sturgeon Electric 1 I LS 1 1, 159.50 1 I (Open Item 83 Total I I T 1 1,229,07 1 1B I8 84 1 RFF 070 1 1 IA roved) 62 1 I Exterior Light Sensor (Relocate existingexterior light sensor I I 184a - Sturgeon Electric 1 LS 708A3 1 1 )open Item 84 Total 750,62 1B 1 1 7 85 1 RFF 077 1 ! Approved 63 1 (Office Circ roam 119 & 120 Ceiling type duct design issues Cedin a conflicts on mech vs arch drawings 185a - PVA 1 1 1 LS 1 2.558.91 1 1 1 1 pen Item 85 Total I I 1 1 2,712.44 1 1 B 1 9 1 _ 86 1 RFF 080 ( ( 1 Closed 1 64 1 0 IProposed Electrical Room i Proposed electrical roam requirement I I I Subcontractor to perform at no cost I86a - Stur eon Electric I 1 I LS 1 0.00 to owner 1 Open Item 86 Total I I I 1 0.00 1 B I Z ! 87 RFI- 087 1I Approved 65 1 Duct/lighting conflict room 110 Proposed solution to move lights 187a - Sturgeon 1 1 LS ! 443.39 .1 !87b Maximum Painting 1 1 1 LS 1 0.00 1 ! ! 1 1 Open Item 87 Total 470.00 1 I B 1 12 ! 88 1 RFI-088 Ap roved 1 66 11st Floor Wallcovering issue !Proposed solution to stri & skim coat wall 1 1 t- 1 I 188a- Phase 2 1 1 1 LS 1 648.00 1 1 1 IBudgel Number 188b - Maximum Paimfing__F 1 1 LS 0.00 1 1 1 1Budget Number ! Open Item 85 Total 686.88 ! 1111 7 1 89 1 RFI-089 ! I Approved !Repair leak in phase 28 HWC piping )repair leak in heat piping discovered during demo 1 1 ! 1 189a - Lind's 1 1 1 LS ! 768.00 1 1 1 )Open Item 89 Total 2B 71 8 I ' 1--1 Pabdre River Library District Open Items List Date: May 30, 2012 I 90 Atltlitional work as directed by Library District 90a - Stur eon Electric 7 I LS I-7,475.76 _ A proved I Additional vrork not on contract documents Open Item 90 Total 7,924.31 1 is 72 12 91 1 PR-23 1 1 1 1 1 Approved I IAn Wall (Provide An Wall 2nd floor location I I I I I I I (Owner decided to not move forward with the 191 a - Division Ten Signs I 1 1 LS 385.00 Iscope of the work. 191b-Heath 1 1 [ LS I 0.00 191c - Not Used I 1 I LS 1 0.00 1 1 1 191d -. Not 1 1 LS I 197 a -Maximum Maximum I I LS 18.0O.GO 118.00 iI I ]Open Item 91 role 1 (267.00) 1 2A 79 1 14 1 92 1 RFI - 094 Approved Exit Sign Relocation I Relocate exit sin per fire authority direction 192a - Sturgeon 1 LS 670.58 Open Item 92 ota 1 647.21 2A 80 1 12 1 93 1 RR - 090 1 1 1 1 Approved 1 Infill of Material ® dock area Infill of material 0 dock area inside waffle I I 193a- Commercial Glass 1 LS 232.81 10 tion 193aa - Phoenix Mason 1 LS I Open Item 93Fa 1 246.78 1 2A 1 81 1 12 1 94 1 PR - 24 1 1 Approved I Credit for Alt. 9 not installed I Deletion of Alt. 9 2nd floor non yet installed 94a - Stur eon 1 1 1 LS 4,312.16 Open Item 94 ota (4,312.16) 1 2A 1 82 1 12 1 95 (Additional Areas of 1 B Strip & Skim Coat 1 I I A roved I IStriand Skim Coat Exterior walls 195a - Phase 2 1 LS 1,184.00 I Open Item 96 Total 1 1,255.04 1 2A 1 83 12 96 1 ASI - 019 I 1 Approvedl (Delete Sinks in Multipurpose rooms (Deletion of sinks 8 piping in multipurpose rooms 196a - Lind's Plumbin 1 LS 4,778.00 pen Item 96 ota 1 1 1 1 (4,778.00) 1 2A 1 84 1 13 1 97 1 Credit for Storm Drain I I I Appmved I I ICredit for Storm Drain 197a - Martin & Sons 1 1 LS 1,845.00 )Open Item 97 Total 1 (1,845.00) 1 2A 1 85 1 13 1 98 1 PR - 6 - Staining Fence I I Approved I Slain fence as directed by pain review 198a - Maximum Painting 1 1 LS 1 126.00 1 pen Item 98 ota I1 133.56 I 2A t 85 1 13 1 99 1 PR-26 I Approved I Additional Lansca in 199a - Nero Landscaping 1 LS 3,227.00 1 199b - Heath Construction1 I 1 LS 1 579.76 Open Item 99 Total I 1 I 1 4.035.17 1 2A 1 87 1 13 1 100 1 PR- 18 I I I I I Closed I (Room 117 TV & Casework Changes I I00a - Team Linx 1 1 LS 1 0.00 1 IPR - 27 makes this item Mute 1100b - Sturgeon 1 1 1 LS 0.00 1100c - Azars I 1 I LS I 0.00 Open Item 100 Total I 1 0.00 1 2A I 88 101 1 RFI- 103 1 1 Approved I I (Additional Wall Protection 1101a - Specialties Contracting 1 LS 1.500.00 pen Item 101 1 otal I I 1,590.00 I 2A 1 89 it 13 it 102 1 RFI - 118 1 1 1 A22roved I IMedia 112 - Top out Existing walls 1102a- Phase 2 1 1 1 LS 11,051.00 1102b - Phase 2 Voluntary Credit 1 1 1 LS 526.00 Open Item 102 Tota 556.50 i 2A 90 13 1 103 1 PR-25 I Approved Extenor Window Sill Options I Option A 1103a - CS Metal 1 1 1 LS 1 1,000.00 103b - Heath I I LS 1 2,539.00 1 1 1 1 Option 8 I1 1 1 1 I IU3 a- CS Metal l LS I 1 91 1103bb - Heath I I I LS I ] ]Open Item 163 Total I 1 3.751.34 2A 1 13 1 104 1 RFI 92 & RFI 100 1 1 1 Approved I (Lack of Return Air Path & Sub Responses 1104a- PVA I I I LS 1 2.403.00 11046- Heath 1 1 1 LS 1 144.94 1 Open Item 104 Tota I I 1 2,700,82 2A 92 1 13 1 105 1 RFI 102 & RFI 106 Response Questions I I I i Approved I 1 ;Conflicts, walls, ducts and ceilings 1105a-PVA 1 1 1 LS 11.031.00 1 1 Open Item 105 Total I I I 1 1,092. 66 2A 1 93 13 106 ] RFI - 108 I Ap rp oved I iRemove & Cap Pipe & vent in Phase 2a 1st floor 106a-Lfnds 1 LS 547.00 )Open Item 106 Total 57346 1 2A 1 94 1 13 1 poudre River Library District Open Items List Dale: May 30, 2012 107 RFI - 114 i I i Approved -Provide & Install Vent for Water Heater 707a - PVA 1 LS 456.00 pen Item 107 Iota 1 '483.36 1 2A 1 95 14 106 RFI- 122 1 1 Approved Existin IT Condensate Drain 708a - Linda 1 LS 590.00 Open Item 108 loial 1 625.40 2A 1 96 1 13 1 109 1 Removal of Mulch Roads I Closed Item was taken out of contract 109a - Martin & Sons 1 1 LS 1 0.00 1 1 _ 1109b - Nero - Tud Seeding 1 LS Nero option B - Sodding 1109aa - Martin & Sons 1 I LS 1091bb - Nero - Sodding 1 1 LS I I 1 pen Item 109 iota 1 0.00 1 2A 1 97 110 1 PR - 27 4 Approved I I IProvide credit for Tv's in teen & storytime rooms 110a - Team Linx I LS (2,62i00)- -- 110b-Sturgeon 1 LS 948.47 I` 1 pen Item 110 Tota -- - ,' (3,573.47) .I 2A 1 98 1 14 Ill Multi Room 107 Additional Temp. Walls I Approved Additional tam walls 2115112 111a-Phase2 1 LS 776.00 -" "- --- Open tem 111 ota ! 822.56 2A 1 99 1r 14 112 12" ressure reducin Valve Approved Add 2' Pressure reducingvalve . 11 Pa-Linds 1 LS 1,088.00 - - - - pen Item 112 Iola —1,153.28 ) 2A 1 1 14 113 Re lace 2nd Floor Men's Urinal Approved Existin urinal is to high ' 173a -Linds 1 LS 599.00 - - -- - pen item 113 Iota 634.94", 2A I 1/ 14 114 IRe lace Mortise Lock Set room 225 A2eroved iTo be com atable with electronic device for FOB 114a- F&C Door 1 LS 575.50 pen Item 114 total 610.03 1 2A I 1 14 115 Re air & Reinsulate ExistingRoof Drain Approve IOn Ist Floor Phase 2A 115a -Linds 1 LS 464.00 - pen Item 115 lotal 421 2q 2A 14 116 1 AV - Lens & Speakers Approved Revised AV Scope of the Work 116a-Team Linx 1 LS 3,232.53 11 6b-Heath 1 1 LS 1,159.52 . 1 pen item 116 Total 1--4,655.57 2A 1 1 14 117 IExterior Book Drop SS trim - A roved Fabrfcate & Install trim 0 Book Drop 1117a - CS Metal 1 LS 438.00 pen Item 117 I cal —4-64-2-8--1 2A 1 14 118 IDelete Piping for 2nd Floor Men's RR Approved 1 Credit for Scope of the work pipin5 i 118a-Linda 1 LS 1,321K00 tI ---- 1 pen Item 118 Total 1 1 0.328.00) 1 2A 14 119 htin Control Location Change Approved W htln control change location 119a. Sturgeon 1 LS 968.52 Work Complete Need Approval' 1 pen Item 119 1 otal 1 .-1,026.63 2A I JW;15'B'.. s * 120 21 A - Connectrac Revisions Closed Work was stopped as decision was made to 1SI20a- Stur eon 1 LS 0.00 - not to perform the work by owner pen Item 120 I ota '..,U.UU , \ I 2A 121 (Back laces for Si na e I Approved 1111akiplates forsigarrae'added'per submittal 12la - Division Ten 1 LS 228.00 (Open Item 121 ToTal --,t "l 241:5h 1 2A 1 14 122 PR -28 Modi Radiator Cover — I Approved I I 'IModl radiator. cover,% 122a -Linds Plumbing 1 LS 876.00 1122b - Maximum painting 1 LS 196.00 122c -Heath Construction 1 LS 434.82 122d -Phase 2 1 LS 770.00 pen Item 122 TotalJ"-2,413.43—j 2A I I 14 123 Change Mechanical room VFD's to 3HP Open Change VFD's for new boiler pumps _ 123a- JCI _ _ _ _ 1 LS2,805.00 Contractor responded to request. Now in ME 123b- Sturgeon: 1 -BLS 792.40 - Groups herds for decision. - - Open Item 123 Total - 3,597.40 - 2A _124_..IPaint Exterior Waffle Ceiling @Entry ..... _ L_. J _- I_— — __I_ . _—. _. I -Approved I -_ . __. `IPaint Exte tor-Waffle.Coilin ®-Entry- 124a -Maximum Painting1 LS 597.00 pen Item 124 Total 1 -' 632.82 2A 1 I 14 125 IMulti ur ose Room - Cut Back Ductwork I I I I Approved I I `IDelete duct to accommodate AV a ui ment- 1125a - PVA 1 1 LS 573,0a--I— — I I Work done need approval )Open Item 125 Total \1 607.38 2A I- 15.` FI - 115 Media Room 112 1 Ao roved I ISub Designed to cat CO 6a - PVA 1 LS 599.00 jm_ I (Work done need ap roval P Item 126 Total 1 '+4.94. -. 2A 1 ----ri— 15 —j- I I I I I I I I