Project Title: Artist Pond outlet repair
Commencement Date: ASAP
Completion Date:
Maximum Fee: (time and reimbursable direct costs): $28,748.19
Project Description: Install outlet pipe and water control structure as designed by Interwest
Consulting Group (attached)
Scope of Services: See attached quotation from Connell Resources dated 6.29.2012
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In
the event of a conflict between or ambiguity in
the terms of the Professional Services
Agreement and this work order (including the
attached forms) the Professional Services
Agreement,sltall control.
WOPSA 05/01
L4a 3 �
The attached forms consisting of _ U
pages are hereby accepted and incorporated
herein, by this reference, and Notice to
Proceed is hereby given.
CIV of Fort Collins
By:,
Date: ' 2 L
By:
Director of Purchasing and Risk
Management (over $60,000.00)
Date:
Connell Resources, Inc.
2673 Jacob Circle
Steamboat Springs, CO 80487
Phone: (970) 870-0200
Fax: (970)870-0290
Estimator: Roland Tremble
QUOTATION Date: 6/2912012
Submitted To:
City Of Fort Collins - Natural Resources
Bid Title
Artist Pond
Address:
Fort Collins, CO _
"Bid Number: -.
Project Location: -
Cottonwood Hollow
Contact:
Daylan Figgs -
Project City, State:.
Fort Collins, CO
Phone:
970-416-2206 Fax:..970-416-2211
Engineer/Architect:..
Interwest Consulting Group
We offer for your consideration the following Quotation which, if accepted, shall constitute a contract between us.
Item # Item Description
00-100
00-110
00-185
00-190
02-110b
02-200
02-204
02-3116
02-308
23-500
29-108
29-114
02-306
Mobilization / Permitting
Dewatering --
Geotechincal Testing Allowance
Seeding. Allowance -
15" PVC Storm Drain Full Replacement
PipRapD50=9", Type L
Place Rip Rap Bedding
Backfili End Structures
Install Agri Drain 15" 12 Ft Tall Inline Water Level
Control Structure -
Finish Grading
Concrete Washout -
Erosion Log (9" Diameter)
Install RCP Flared End Sections
Estimated Quantity Unit Unit Price
1.00
EACH
$1,947.55-
- $1,947.55
1.00:
WK. -
$2,674.54 -
- $2,674.54
—1.00
LS
- $550.00
$550.00
1.00
LS
$1,190.10
$1,190.10
120.00
LE
- $g9.00
$11,880.00
12.00
CY
- $78.04
,$936.48
4.00
CY -
-' $76.01
-- $304.04
2.00
EACH
$749.99
- $1,499.98
1.00
EACH
$4,739.64
$4,739.64
-533.00SY
$1.5o
$799.50
- -1.00
EACH
$641.36-
--$641.36
100.00
LF
$7.05
$705.00
2.00
EACH
$440.00
_ $880.00
Total Bid, Price:
$28,748.19
Notes:. -Pricing is. based upon plan entitled "Artist pond outlet improvements' dated 06-21-12, as prepared by Interest consulting.
And Geotechnical engineering report not provided - - - -
• The following are excluded from this proposal: Construction layout and engineering; Drainage facility certification; Warrantee period In
_ excess of one year; Street cleaning for work performed. by others; Permits: Including. but not limited to; city building, development
construction, wastewater discharge, storm water discharge (NPDES), air quality, etc.; Fees, Including but not limited to, for developement,
Inspection, u01ity connection, meters, etc.; Maintenance of erosion control devices for others; prairie dog removal, relocation, or
extermination; landscaping, seeding, or revegetation bid as allowance only .
• Material Prices for pipeline Items are guaranteed for a period of 30 days from the Date shown on the top of this quote. After 30 days the
material prices may change the unit prices quoted. -
• All work is contingent on the availability of construction water, access to the work, negotiation of acceptable contract terms, a mutually
agreeable schedule, and verification of financing.
• Please provide a minimum of 2 weeks advanced notification of work requests to allow for scheduling the work. No work will be completed
without a signed Contract Agreement.
• Frost removal or winter protection is not included. If requested, it will be billed either on a time and material basis or a Jump sum amount
that is mutually agreed apon.
• Environmental site assesment / Mitigation of hazardous or contaminated materials is excluded.
• Performance and Payment bond is excluded but can be included for 1% of Contract value
Artist Pond Page i of 2