HomeMy WebLinkAboutCHANGE ORDER - BID - 7222 ASPHALT OVERLAY (2)Collins Planning, Development & Transportation streets [�Ciityq$of ` s 625 Ninth Street $treats P.O. Box 560 Fort Collins. CO 80522.058D 970.221.6615 970.221.6270. tax Change Order Form PROJECT TITLE: 2012 Street Maintenance Program, 2012 Overlay Contract PROJECT NUMBER: 902120 (Bid No. 7222) CONTRACTOR: Martin Marietta Materials (PO No. 9123107) CHANGE ORDER NUMBER: 1 n preparing cnange orders snow in order as separate numberea aragrap�s a 000wing 1. Reason for change. 2. Description of change 3. Change in contract cost. 4. Change in contract time See attached document Change Order No. 1 3. The contract cost win increase by $584.00 4. There Is no change in contract time. ORIGINAL CONTRACT COST $3.499,816.15 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $584.00 TOTAL % OF THIS CHANGE ORDER 0.02•/ TOTAL C.O. °/h OF ORIGINAL CONTRACT 0.02% ADJUSTED CONTRACT COST $3,5DO,400.15 ACCEPTED BY: ! �� DAIS: J I Z Contraclol's Representative APPROVED BY: DATE: et Malnlenance Program Manager cc: Contractor Purchasing Prqecl File Change Order No: 1 Date: 6/4/2012 1 Reason For Change: a. Needed to purchase two - 24inch manhole ring and covers due unforseen circumstances during the projects production. 2 Description Of Change: a. Perfromed a full adjust on 2 manholes, raising the manhole to finished grade. Only paid for equipment. Labor is included in the line item for full adjust manhole. Change In Contract Amount: Item Qty Unit Unit Cost Total Cost 3 a. 210.10 Adjust Standard manhole (Equipment only) 2.00 Each 5292.00 $584.00 TOTAL CHANGE IN CONTRACT AMOUNT 0 Chi No Change a. TOTAL CHANGE IN CONTRACT TIME 4 0 TOTAL 1 $584.00 City of F6 Planning, Development & Transportation Skeels i i ns 625 Ninth Stroat JC�e®®g�iiml `..r Streets - Ro. Box 680 Fort Collins. CO 80522.0580 970221.6615 970.221.6270• lax Change Order form PROJECT TITLE: 2012 Street Maintenance Program, 2012 Overlay Contract PROJECT NUMBER: 902120 (Bid No. 7222) CONTRACTOR: Martin Marietta Materials (PO No. 9123107) CHANGE ORDER NUMBER: 2 n prepanng change oroers snow in or0er as separate numoereo paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time See attached document Change Order No. 2 3. The contract cost will increase by $876.00 4. There is no change in contract time. ORIGINAL CONTRACT COST $3,499,616.15 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $584.00 TOTAL THIS CHANGE ORDER $876.00 TOTAL % OF THIS CHANGE ORDER 0.03% TOTAL C.O. % OF ORIGINAL CONTRACT 0.04% ADJUSTED CONTRACT COST $3,501,276.15 ACCEPTED BY: DATE: T T `l Conlractors Representative APPROVED BY: DATE: ` Street Maintenance Program Managel cc: Contractor Purchasing Project File Change Order No: 2 Date: 7/13/2012 1 Reason For Change: a. Needed to purchase three - 24inch manhole ring and covers due unforseen circumstances during the projects production. 2 Description Of Change: a. Perfromed a full adjust on 3 manholes, raising the manhole to finished grade. Only paid for equipment. Labor is included In the line item for full adjust manhole. Change In Contract Amount: Item Qty Unit Unit Cost Total Cost 3 a. 210.10 Adjust Standard manhole (Equipment only) 3.00 Each $292.00 $876.00 TOTAL CHANGE IN CONTRACT AMOUNT 0 Chi No Change a. TOTAL CHANGE IN CONTRACT TIME 4 U TOTAL 1 $876.00 City$pof Planning, Development & Transportation Streets �Ba�p `d Collins 626 Ninth Street Streets P.O. Box 580 Fort Collins. GO B0522.0580 970,221.6615 970.221 6270• lax Change Order Form PROJECT TITLE: 2012 Street Maintenance Program, 2012 Overlay Contract PROJECT NUMBER: 902120 (Bid No. 7222) CONTRACTOR: Martin Marietta Materials (PO No. 9123107) CHANGE ORDER NUMBER: 3 n preparing c ange orders show in order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change 3. Change In contract cost. 4. Change In contract time 1. See attached document Change Order No. 3 3. The contract cost will increase by $38,762.00 4. There is no change in contract time. ORIGINAL CONTRACT COST $3,499,816.15 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $1,460.00 TOTAL THIS CHANGE ORDER $38,762.00 TOTAL % THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $3,540,038.15 ACCEPTED BY: DATE: Contractor's Representative APPROVEDBY: `[Stl/ DATE: S t aintenance Program Manage) cc: Contractor Purchasing Project Rio Change Order No:3 Date: 71132012 1 Reason For Change: E. Added AddiliorW work to origiorw conuaci amnegotiated new prices based on the work for 24inoh manholes and for manholes larger than 24inches for three Gtfe ant proleols (Drake Rd. Tall Hill Rd. Zdlgler Rd) b. Additional traffic control negociated for Dake Rd and Taft Hill Road 2 Description Of Change: a. In order to have Martin Marietta perform manhole adµalments we negotiated higher prices for the work on two ddlerent types of manholes. See the prices "bow which are applicable for Taft HIa Rd. Drake Rd, and Zeigler Rd b. Change In Contract Amount hm Qq Let, Unil C." 'Final Gnl 3 a 210111 AJrya VaalJrJ e.aaaL War rah 1 $17'•IXI 1 S?I.laarlkl ]hl 11 jAdja -d Sikci it h1Jnh+k b. 630.01 Constnrctiun 7� Tral Control TOTAL CHANGE IN CONTRACT AMOUNT 0 CM N'. ('kni, a. TOTAL CHANGE IN CONTRACT TIME a 0 S10.637.Do Tol[A1. I 53$762A0