HomeMy WebLinkAboutRESPONSE - RFP - 7378 CARNEGIE BUILDING CONCEPTUAL DESIGN6T
a boom
w
Li
Oak
DAVID KRESS
AIA, LEED AP
Principal in Charge
David's role as Principal -in -Charge will be to
ensure that overall project design goals are clearly
established and met throughout the project's entirety.
He will be a leader in the charrette process and the
design lead.
Education
Master of Architecture, 1991, University of California,
Los Angeles, Bachelor of Arts in Architecture, 1989,
University of New Mexico
Professional Registration
Licensed Architect, Colorado and Wyoming
"It is exciting to be part of collaborative design
effort that will breathe new life into a getn
structure located within my office neighborhood "
Relevant Project Experience
• Visual Arts Annex, University of Northern
Colorado, Greeley, CO
• Rialto Theater Center, Loveland, CO
• Colorado State University, CSURF Building, Fort
Collins, CO
• Northern Colorado Water Conservancy District
Headquarters, Berthoud, CO
• Rocky Mountain High School Remodel/Addition,
Fort Collins, CO
• Greeley Central High School Remodel/Addition,
Greeley, CO
• Resurrection Fellowship Youth Activity Center,
Loveland, CO
Professional Affiliations/Memberships
American Institute of Architects; US Green Building
Council; LEED Accredited Professional
ASSIGNED PERSONNEL
Rialto TlxateiCenter, toveland
Awards/Honors
• American Institute of Architects North Chapter
"Design Merit Award" - Resurrection Youth
Activity Center
• American Institute of Architects North Chapter
"Design Merit Award" — Rocky Mountain High
School
• Council of Educational and Facility Planners
International "Lighthouse Award" — Greeley High
School
• American Institute of Architects North Chapter
"Design Merit Award" — Mawson Block Mixed Use
Publications/Featured Speaker
• "A Design and Construction Case Study:
CY Middle School in Casper, WY." Civil and
Architectural Engineering College, University of
Wyoming, Laramie, Wyoming, October 2010.
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
REBECCA SPEARS
AIA, LEEDAP
Project Architect
As Project Architect, Rebecca will attend design
meetings to understand and respond to your specify
needs and will assist in the overall charrette process.
Education
Bachelor of Arts in Architecture,1984 Iowa State
University; Master of Architecture, 1989 Iowa State
University, Tau Sigma Delta Academic Honor Society
in Architecture
Professional Registration
Licensed Architect, Colorado
'The vibrant art scene is one of the things that
makes Fort Collins the unique place it is. l would
love to be a part of the planning process to house
Beet Street andAlR in this lovely old building. "
Relevant Project Experience
• Visual Arts Annex, University of Northern
Colorado, Greeley, CO
• ' CBS Historic Freight Depot Renovation
and Stabilization, Fort Collins, CO (while with
previous firm)
• 'Rialto Theater Renovation, Loveland, CO (while
with previous firm)
• Boulder Jewish Community Center, Boulder, CO
• New Army National Guard Readiness Center,
Windsor, CO
• Odell Brewery Remodel, Fort Collins, CO
• Northern Colorado Water Conservancy District
Headquarters, Berthoud, CO
• Coloradoan Newspaper Office Building, Fort
Collins, CO
• Casey Middle School, Boulder, CO
• PVHS Loveland Oncology Center, Loveland, CO
Professional Affiliations/Memberships
• Past President, Colorado North Chapter of the
4
_ 0
Botrkla�JewrslrCararrmrityCevrrrr U,ndu�,
American Institute of Architects
• Past Secretary, Colorado Chapter of the
American Institute of Architects
Community Service
• Board of Directors, Engle Family Foundation, a
Charitable Giving Organization
• Volunteer, Poudre School District, Fort Collins,
Colorado
Awards/Honors
• Architectural Advisory Council, Iowa State
University 2006-2009
Publications/Featured Speaker
• "20 Ways Creative Building Design Can Make
Your Students Smarter," USGC Colorado, Green
Schools Summit, October 2010.
• Colorado Association of School Business
Officials conference 2009
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
DENISE POZVEK
ASID, LEED AP
Interior Designer
Denise will be responsible for many of the interior
design features and space planning discussion for the
project, while supporting the functional needs of the
building program.
Education
B.F.A., Interior Design, minor in Construction
Management, Colorado State University, 1985
Professional Registration
NCIDQ
7 am excited to have the opportunity to contribute to
the success of Beet Street andAlR by offering my
expertise in space planning, materials selections and
intenor architecturel will create functional and energetic
spaces that support this amazing vision, while providing
innovative solutions in a unique historical setting.'
Relevant Project Experience
• Midtown Arts Center, Fort Collins, CO
• Rialto Bridge, Loveland, CO
• Windsor Readiness Center (Army National
Guard), Windsor, CO
Rodizio Grill, Fort Collins, CO
• Seven Generations Office Park, Fort Collins, CO
• Northern Colorado Water Conservancy District
Headquarters, Berthoud, CO
• Coloradoan Office Building, Fort Collins, CO
• Mawson Block Mixed Use Development, Fort
Collins, CO
• PVHS Loveland Oncology Center, Loveland, CO
• PVHS Greeley Infusion Center, Greeley, CO
• Odell Brewing Expansion, Fort Collins, CO
Professional Affiliations/Memberships
Northern Colorado Interior Design Guild
US Green Building Council, LEED Accredited
Professional
• American Society of Interior Designers
Udell Bremiq Company, rat Collins
• Board of Directors, Fort Collins Figure Skating
Club
AwardslHonors
Council of Education and Facility Planners
International "Monarch Award" — Fossil Ridge
High School
ASID "First Place, Sustainable Design", Council
of Education and Facility Planners International
"Citation Award", and American Institute of
Architects North Chapter Design Merit Award —
Zach Elementary School
Council of Education and Facility Planners
International Lighthouse Award -Greeley
Central High School
American Institute of Architects North Chapter
"Design Honor Award"— Poudre High School
Publications/Featured Speaker
• ASID National Convention, 2006
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
JOSH MCGARVEY
t1,ke, ,;av,enaq �r
AIA, LEED AP
Job Captain , Res Illal Level4 +38.5_' ✓`,
Remdw7aal Level3 428.5'
i 6 ofte Ofllr! �Level2 +15' +17'
-"nt 4 0' � OrrroelfuWie Shope Level 1 +0'10.
—
f—
Mixed U>e Urban Pro�ecT, Rut Cullniti
Josh's outstanding graphics skills utilize
3-0imensional models to help clients visualize their
building and evaluate different design options. This
will be an important pan of helping gain funding for
this project.
Education
Bachelor of Arts, 2005, Judson College, Elgin, Illinois
Master of Architecture, 2007, Judson College, Elgin,
Illinois
Professional Registration
Licensed Architect, Colorado
it's an honor to have the opportunity to work with
you on such a special project. I'm excited to help
envision the next chapter for one of Old Town 3
most treasured historic buildings and to see your
these great programs take flight!"
Relevant Project Experience
Encompass Technologies Office Building, Fort
Collins, CO
• Midtown Arts Center, Fort Collins, CO
• Odell Brewing Company, Fort Collins, CO
• The Cupboard FaQade Renovations, Fort Collins,
CO
Colorado State Univ. CSURF Building, Fort
Collins, CO
CSU College of Business North renovation, Fort
Collins, CO
• Boulder Jewish Community Center, Boulder, CO
• St.John's Catholic Church Chapel Addition,
Loveland, CO
Army National Guard Readiness Center,
Windsor, CO
Em Quartier, Bangkok, Thailand
Emsphere, Bangkok, Thailand
Professional Affiliations/Memberships
Currently a member of NCARB IDP (Intern
Development Program)
LEED Accredited Professional
Awards/Honors
2006 Award for Excellence in Downtown
Revitalization, Illinois Main Street Council
2003 Association of Licensed Architects Student
Merit Award
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
Coixigual Wed use OesW, Loveland
RB+B
1II1IN1911f.11MI
Our team of consultants, all of whom are local to
Fort Collins, have been specifically chosen for
this project. While we understand some of the
disciplines will require minimal hours for the project,
it is important that they are on board early in the
planning process to ensure a smooth delivery of the
project.
Our consultant team, with key personnel noted on
the following pages, is as follows:
• Landscape Architecture — BHA Design
(as needed)
• Structural Engineering — JVA, Inc.
• Mechanical Engineering — Integrated
Mechanical
• Electrical Engineering —APS, Inc.
• Information Technology — Geiler & Associates
• Historical Consultant — Tatanka
Cost Estimating — Heath Construction
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
NOMMOO
goo
MidromArts cernat Far Colku
RB+B
REFERENCES
The best testimony to our team's experience,
thoroughness, and design acumen is the number of
repeat clients we have had the pleasure of working
with over the years. Below is a brief list of a few
references who would be happy to discuss with you
what it's like to work with our team on creative, public,
artistic projects throughout Northern Colorado,
Kirk Leichliter, Director of Facilities Management
University of Northern Colorado
(970) 351-2446
kirk.leichliter@unco.edu
Mike Spearnak, Director of Planning,
Design and Construction
Poudre School District
(970)490-3413
kirk.leichliter@unco.edu
Susan Ison, Cultural Services Director
City of Loveland
(970)962-2411
isons@ci.loveland.co.us
Bruce Hendee, Assistant to the City Manager
City of Fort Collins
(970)416-2332
BHendee@fcgov.com
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
- m
low
N;-7
77;
�
r
vPq
Y _
•
]AM L 01 CON I LN IS
Cover Letter D
Project Approach G
Workload/Availability/Proposed Hours , T
Assigned Personnel
Consultants
References
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
Ili - I}_YaK
7W-VAWl
.�'�
INS
� 1
Idt
11 11. w
I a T
May 1, 2012
John Stephen, LEED AP, CPPO, Buyer
215 North Mason Street, 2nd Floor
Fort Collins, CO 80524
Re: 7378 Carnegie Building Conceptual Design
Statement of Qualifications
Dear John and Members of the Selection Committee,
The Carnegie Library Building is an historic treasure
right in the heart of Old Town Fort Collins. The
building has served this community for over a century:
first as the library, most recently as a museum. As
this important landmark moves into its next life as
a cultural community center, it will be important to
respect its history as it is prepared to move into the
future as an arts incubator.
RB+B Architects, located just a block away from
this historic gem, is excited to be part of this unique
opportunity of leading the conceptual interior and
landscape space planning effort, as well as engaging
with the Fort Collins community through charrettes
and public meetings.
Why the RB+B Team?
• The Right Team Members. Our personnel
City o1 Fat Collins, Carnegie Building
COVER LETTER
includes the right combination of relevant
experience, leadership, space planning expertise,
and fundraising support.
• A Fort Collins Based Team. Structural,
Mechanical, Electrical, and Landscape
Architectural sub -consultants are local to Fort
Collins.
• Location. The RB+B office is just a block away
from the Carnegie Building site.
• The Desire to Improve the Old Town
Community. Our firm has been part of Old Town
for years and the projects most dear to us are
those that contribute to the sense of community
in Old Town, enhance the available arts and
cultural opportunities, and improve upon all the
things that make Fort Collins a great place to live.
Acknowledgement of Addendum
RB+B acknowledges receipt of Addendum 1.
We look forward to working with you on this exciting
project!
Sincerely,
CDWvt�r,t tM44
David Kress, AIA, LEED AP, Principal in Charge
email: dkress@rbbarchitects.com
phone: 970484-0117
CARNEGIE BUILDING CONCEPTUAL DESIGN
RB!B CITY OF FORT COLLINS, #7378
67t ioq Company lasting Roam, Fort CoMns
�F f
li
Ode# Brewing CanpanyOffices , Fort Collins
NCWCO £nhy Rotunda, Berthoud
CARNEGIE BUILDING CONCEPTUAL DESIGN
RBB CITY OF FORT COLLINS, #7378
Producing the conceptual design for this multi-
use, multi -tenant space will be a highly creative,
emotionally charged, output intensive process. RB+B
will bring an energetic, focused, and experienced
team to interact with representatives from the City,
Beet Street and AIR. This is an exciting time to bring
several groups together and brainstorm what could
happen in this wonderful space. Here's how we see
this process unfolding.
Schedule: The very critical deadline for grant funding
proposals is June 30, 2012. This short time frame
of less than two months will help focus everyone's
efforts — design team and owner/users — on a
common objective of understanding possibilities,
requirements and solutions of how to best use the
building and site. RB+B will establish a schedule and
keep everyone informed of interim meeting dates and
deadlines to reach the end of June goal.
Programming: The first step is for us to understand
your unique needs for this facility. David, Rebecca,
Denise and Josh will meet with your design team
groups to discuss what is required and desired. We
will generate a program which lists all the spaces and
their areas. We can use this for comparison to the
available building configuration to determine the best
fit.
1T*ks I.n..gr... w/ 11R071 �w,n.w.wn.w
�� I �. Rds.e,tp.lol
I,) II 2].5.679)
ProVainming Diagram
Research and Exploration: At the same time,
members of our team will be investigating the
existing building to determine possibilities and
constraints. Structural, mechanical, electrical, IT and
historical impacts will all be documented and will help
inform the design solutions explored.
Conceptual Design: As the physical design
parameters are understood, conceptual floor and
site plans will be generated with input from the
landscape architect, showing interior and exterior
spaces including plazas, parking, and entry to the
building. The possibilities of introducing natural light
by opening up the windows, removing or adding
walls, floors, stairs, to make the building perfect for
your use will all come together. RB+B and BHA will
PROJECT APPROACH
Fundraising Graphic. Jewish Community Centel Boulder
produce attractive, colorful sketches to illustrate
design solutions that are helpful to the owner/users
for visualizing and can be used as aids in the fund-
raising process.
Construction Budget: Input from our proposed
cost estimator Heath Construction, during the
analysis will be crucial to establishing a budget and
a phased construction plan.
Phased Construction Plan: While the team is
moving through the design process, we will identify
portions of the project that can be phased. The
design solution may be broken into several phases
to match funding as it becomes available, but will
function for the inhabitants at all times.
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS. k7378
00
Jill
i �.,. iir,:rn,.l�a a SCv mac, �.����.� :k �� ��j •' l,r..r�� _��.�"�-. '•�t/��
,:
i7 F
\4
vacatu al slilaw, Casp,v
Roo
�1
, a
Maikelpface Concept. fort Coffins
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378
WORKLOAD I AVAILABILITY I PROPOSED HOURS
IhrU7.73�1L17
RB+B acknowledges that we can perform the
requested work and meet the start and completion
dates set forth for the project.
ADDITIONAL RESOURCES
In addition to our assigned personnel, RB+B has
additional staff in our office available to help with the
project, should the need arise to meet your schedule.
UNC ViisualMsAnnex , Greeley
PROPOSED WORK HOURS
Estimated work hours for our proposed team can be
found following.
UNC Michener Archives, Greeley
Coloraomn Oliice Building. Fat Collins
CARNEGIE BUILDING CONCEPTUAL DESIGN
RBIB CITY OF FORT COLLINS. #7378
Contract Negotiations
Create a base plan of the existing builidng
Based on existing drawings and field verifying.
Library Park Master plan Research
Historical review
4 Charrettelmeeting sessions
Space program creation
Conceptual interior layout
Interim Presentation
Phased construction plan
Structural Narrative
Mechanical Narrative
Electrical Narrative
Technology Narrative
Historical Narrative
Cost estimate
Presentation material
Final design/budget presentation
Hours
Hours
Junior
Senior
Hours
Staff
Staff
Consult
0
2
0
12
1
0
1
2
0
0
3
5`
12
16
3
4
4
0
24
15
0
4
4
0
8
4
2
0
2
6
0
2
6
0
1
6
0
2
3
0
1
5'
0
2
10
26
8
0
1
3
0
92
72
36
Total Hours 200
40 additional hours if section 106 process is needed to be completed.
Tatanka Historical
Geiler and Associates
Contractor
JVA Structural
Integrated Mechanical
APS Electrical
Geiler and Associates
Tatanka Historical
Estimator
CARNEGIE BUILDING CONCEPTUAL DESIGN
CITY OF FORT COLLINS, #7378