Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (5)City of Fort Collins EXHIBIT "A" WORK ORDER FORM AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. BID NO: 7391 Email work orders to mail()vogelconcrete.com DATE: /28/12 REQUESTED BY: Eileen Scholl BILL TO (name, address, zip): same EMAIL ADDRESS: eschollafcgov.com WORK ORDER NO: P12-20 PHONE NUMBER: 566-1342 Co077- DEPARTMENT: Parks PROJECT TITLE/DESCRIPTION: Poudre Trail (o) Sharp Point COMMENCEMENT DATE:07/02/12 COMPLETION DATE: 07/31/12 SCOPE OF SERVICES: Remove —3,280 sq ft of asphalt trail and replace w/5" colored trail w/fiber, color to be Yosemite Brown CITY OF FORT COLLINS: DATE: 6/28/12 BY: Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. VOGEL CONCRETE, INC: DATE: 6/29/12 BY: CC: Purchasing; the attached form(s) consisting of 1 page(s) are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Miscellaneous Concrete Annual - Page 1 of 1 City of Fort Collins EXHIBIT "A" WORK ORDER FORM AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. BID NO: 7391 Email work orders to mail()vogelconcrete.com DATE: /28/12 REQUESTED BY: Eileen Scholl BILL TO (name, address, zip): same EMAIL ADDRESS: eschollafcgov.com WORK ORDER NO: P12-20 PHONE NUMBER: 566-1342 Co077- DEPARTMENT: Parks PROJECT TITLE/DESCRIPTION: Poudre Trail (o) Sharp Point COMMENCEMENT DATE:07/02/12 COMPLETION DATE: 07/31/12 SCOPE OF SERVICES: Remove —3,280 sq ft of asphalt trail and replace w/5" colored trail w/fiber, color to be Yosemite Brown CITY OF FORT COLLINS: DATE: 6/28/12 BY: Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. VOGEL CONCRETE, INC: DATE: 6/29/12 BY: CC: Purchasing; the attached form(s) consisting of 1 page(s) are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. Miscellaneous Concrete Annual - Page 1 of 1 c=uooEQn 6330 S. College Avenue Fort Collins, CO. 80525 Ph 970-484-3880 Fax 970-407-9484 Date: June 28 2012 Project: Ft. Collins Parks open area Attn: Eileen K. Scholl Parks Project Manager 413 South Bryan Ave. Ft. Collins, CO. 80521 Phone: 970.416-2062 Cell: 970.566-1342 Email: escholl(g7fcgov com Bike Trail by Sharp Point Dr. ITEM Area QTY Unit Unit Price Total 202.02 Sawcut Concrete/Asphalt (4" < 6") 22 LF $ 3.10 $ 68.20 202.12 Remove Asphalt - 6" 3310 SF $ 2.20 $ 7,282.00 304.01 Aggregrate Base Course 50 TN $ 27.00 $ 1,350.00 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown 3310 SF $ 4.90 $ 16,219.00 630.06 Size A Sign With Stand 10 PEPD g 1.65 $ 16.50 630.03 Channel!zing Barrels 16 PEPD $ 0.75 $ 12.00 Estimate $ 24,947.70 Jeff Hubbard June 28 2012 b u b ba ro Cd v o g e l co n c r e te. co m c=uooEQn 6330 S. College Avenue Fort Collins, CO. 80525 Ph 970-484-3880 Fax 970-407-9484 Date: June 28 2012 Project: Ft. Collins Parks open area Attn: Eileen K. Scholl Parks Project Manager 413 South Bryan Ave. Ft. Collins, CO. 80521 Phone: 970.416-2062 Cell: 970.566-1342 Email: escholl(g7fcgov com Bike Trail by Sharp Point Dr. ITEM Area QTY Unit Unit Price Total 202.02 Sawcut Concrete/Asphalt (4" < 6") 22 LF $ 3.10 $ 68.20 202.12 Remove Asphalt - 6" 3310 SF $ 2.20 $ 7,282.00 304.01 Aggregrate Base Course 50 TN $ 27.00 $ 1,350.00 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown 3310 SF $ 4.90 $ 16,219.00 630.06 Size A Sign With Stand 10 PEPD g 1.65 $ 16.50 630.03 Channel!zing Barrels 16 PEPD $ 0.75 $ 12.00 Estimate $ 24,947.70 Jeff Hubbard June 28 2012 b u b ba ro Cd v o g e l co n c r e te. co m