HomeMy WebLinkAboutWORK ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (5)City of
Fort Collins
EXHIBIT "A"
WORK ORDER FORM
AGREEMENT BETWEEN THE CITY OF FORT COLLINS
AND VOGEL CONCRETE, INC.
BID NO: 7391
Email work orders to mail()vogelconcrete.com
DATE: /28/12
REQUESTED BY: Eileen Scholl
BILL TO (name, address, zip): same
EMAIL ADDRESS: eschollafcgov.com
WORK ORDER NO: P12-20
PHONE NUMBER: 566-1342
Co077-
DEPARTMENT: Parks
PROJECT TITLE/DESCRIPTION: Poudre Trail (o) Sharp Point
COMMENCEMENT DATE:07/02/12
COMPLETION DATE: 07/31/12
SCOPE OF SERVICES: Remove —3,280 sq ft of asphalt trail and replace w/5" colored trail w/fiber, color to
be Yosemite Brown
CITY OF FORT COLLINS:
DATE: 6/28/12
BY:
Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with
the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict
between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the
Services Agreement shall control.
VOGEL CONCRETE, INC:
DATE: 6/29/12
BY:
CC: Purchasing; the attached form(s) consisting of 1 page(s) are hereby accepted and incorporated herein by this reference, and
Notice to Proceed is hereby given.
Miscellaneous Concrete Annual - Page 1 of 1
City of
Fort Collins
EXHIBIT "A"
WORK ORDER FORM
AGREEMENT BETWEEN THE CITY OF FORT COLLINS
AND VOGEL CONCRETE, INC.
BID NO: 7391
Email work orders to mail()vogelconcrete.com
DATE: /28/12
REQUESTED BY: Eileen Scholl
BILL TO (name, address, zip): same
EMAIL ADDRESS: eschollafcgov.com
WORK ORDER NO: P12-20
PHONE NUMBER: 566-1342
Co077-
DEPARTMENT: Parks
PROJECT TITLE/DESCRIPTION: Poudre Trail (o) Sharp Point
COMMENCEMENT DATE:07/02/12
COMPLETION DATE: 07/31/12
SCOPE OF SERVICES: Remove —3,280 sq ft of asphalt trail and replace w/5" colored trail w/fiber, color to
be Yosemite Brown
CITY OF FORT COLLINS:
DATE: 6/28/12
BY:
Vogel Concrete, Inc. agrees to perform the services identified above and on the attached forms in accordance with
the terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict
between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the
Services Agreement shall control.
VOGEL CONCRETE, INC:
DATE: 6/29/12
BY:
CC: Purchasing; the attached form(s) consisting of 1 page(s) are hereby accepted and incorporated herein by this reference, and
Notice to Proceed is hereby given.
Miscellaneous Concrete Annual - Page 1 of 1
c=uooEQn
6330 S. College Avenue
Fort Collins, CO. 80525
Ph 970-484-3880 Fax 970-407-9484
Date: June 28 2012
Project: Ft. Collins Parks open area
Attn:
Eileen K. Scholl
Parks Project Manager
413 South Bryan Ave.
Ft. Collins, CO. 80521
Phone:
970.416-2062
Cell:
970.566-1342
Email:
escholl(g7fcgov com
Bike Trail by Sharp Point Dr.
ITEM
Area
QTY
Unit
Unit Price
Total
202.02
Sawcut Concrete/Asphalt (4" < 6")
22
LF
$ 3.10
$ 68.20
202.12
Remove Asphalt - 6"
3310
SF
$ 2.20
$ 7,282.00
304.01
Aggregrate Base Course
50
TN
$ 27.00
$ 1,350.00
608.29
Colored Trail with Fibermesh - 5"
Yosemite Brown
3310
SF
$ 4.90
$ 16,219.00
630.06
Size A Sign With Stand
10
PEPD
g 1.65
$ 16.50
630.03
Channel!zing Barrels
16
PEPD
$ 0.75
$ 12.00
Estimate $ 24,947.70
Jeff Hubbard June 28 2012
b u b ba ro Cd v o g e l co n c r e te. co m
c=uooEQn
6330 S. College Avenue
Fort Collins, CO. 80525
Ph 970-484-3880 Fax 970-407-9484
Date: June 28 2012
Project: Ft. Collins Parks open area
Attn:
Eileen K. Scholl
Parks Project Manager
413 South Bryan Ave.
Ft. Collins, CO. 80521
Phone:
970.416-2062
Cell:
970.566-1342
Email:
escholl(g7fcgov com
Bike Trail by Sharp Point Dr.
ITEM
Area
QTY
Unit
Unit Price
Total
202.02
Sawcut Concrete/Asphalt (4" < 6")
22
LF
$ 3.10
$ 68.20
202.12
Remove Asphalt - 6"
3310
SF
$ 2.20
$ 7,282.00
304.01
Aggregrate Base Course
50
TN
$ 27.00
$ 1,350.00
608.29
Colored Trail with Fibermesh - 5"
Yosemite Brown
3310
SF
$ 4.90
$ 16,219.00
630.06
Size A Sign With Stand
10
PEPD
g 1.65
$ 16.50
630.03
Channel!zing Barrels
16
PEPD
$ 0.75
$ 12.00
Estimate $ 24,947.70
Jeff Hubbard June 28 2012
b u b ba ro Cd v o g e l co n c r e te. co m