HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9123792,:�/, � z37 9 Z-
A—ONE 4 3 ROCKY MOUNTAIN
f�nE 3=—
-- PAVEMENT
www.a-Ichipseal.com
www.rockymountainpavement.com
Customer
Attention
Date
City of Fort Collins
- Facilities
Monty Wagner
06/20/12
300 LaPorte Ave.
(97) 566-7043
Fort Collins, CO
80522-
mwagner@fcgov.com
Proposal #
Proposal for
Fax: (970) 221-6534
11873
City of Fort Collins - senior Center - 1200 RainTree ave - Fort Collins
Item# Description
Onty/Unit
Unit Price Total Price
Option# 1
01 Asphalt Patch Back
56 SY $62.25 $3,486.00
Paving grade will be done before hand, apply tack coat, and patch back with 6° of
compacted full depth asphalt.
....................................................................................................................................................................................
02 Mobilization
1 EA
Mobilization to and from the jobsite.
....................................................................................................................................................................................
03 Infrared
34 Eel $80.00 $2,720.00
Repair potholes and damaged asphalt using the Infrared method of asphalt pavement
patching. These areas are marked onslte with Fluorescent marking paint.
(Each infrared patch repair Is approx. 5'x7') The infrared process includes:
'Clean the damaged areas of all dirt and debris,
'Heat the asphalt to a working temp of 300 F by the infrared process.
'Rake healed area and remove any deteriorated asphalt.
`Add now asphalt
'Compact wth a vibratory roller.
'Clean-up.
....................................................................................................................................................................................
04 Crackseal
5,298 LF $-72 $3,814.56
Clean and ill cracks with hot pour rubberized crack sealer.
'Transition crack seal (concrete to asphalt) joint will not be sealed unless otherwise
staled.
'All cracks 1/4' or greater will be sealed unless otherwise specified.
'SETTLING OF CRACK SEAL MATERIAL MAY OCCUR. BUT DOES NOT AFFECT
PERFORMANCE.
'ALLIGATORED AREAS WILL NOT BE CRACK SEALED.
....................................................................................................................................................................................
Accepted_
Totalfor Option# 1 $10,020.56