HomeMy WebLinkAboutWORK ORDER - BID - 6046 CONCRETE MAINTENANCE PROJECT (2)q (Z)-� 9 I
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND Jeff Hubbard, Vogel Concrete
DATED: March 1, 2010
Work Order Number: awf°y,T 01)-1/31�309
Purchase Order Number:
Project Title: r�r4ie�..ttu.� S�r� Ka-A�atecti.�
Commencement Date:
Completion Date: 71271/2-
Maximum Fee: (time and reimbursable direct costs): $o GO
Project Descriptionw--V7M.FV—M�.
I
Scope of Services:
Acceptance '*
User
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Services Agreement
between the parties. In the event of a conflict between or ambiguity in the terms of the Services
Agreement and this work order (including the attached forms) the Services Agreement shall control.
The attached forms consisting of7� a pages are hereby accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
City of Fort Collins Service Provider
By: By:
Date: Date:
CC: Purchasing
IU00ELC®B9C=
FORT COL JNS COLORADO
6330 S. College Avenue
Fort Collins, CO. 80525
Ph 970-484-3880 Fax 970-407-9484
Date: March 26 2012
Project: Classroom floor @ The Gardens on Spring Creek
2145 Centre Ave.
Ft. Collins, CO. 80526
Alto. Ethan Couens
Phone: 970-221-6273
Email: ECozzens(r)fcrov.com
Description: Remove Concrete floor haul and dispose offsite for recycle crushing
Excavate inside area to depth of 30" - 36"
Place structural fill grade and compact
Pour 4000 psi interior floor and Finish
�—1 Option I
ITEM
Description
TY Unit Cost
I Total
1
lRemove floor, Exca nd-p ce structural fill, pour 4" floor
23 818.00
1 $ 23,818.00
Estimate
Description: Remove Concrete floor haul and dispose offsite for recycle crushing
Excavate inside area to depth of 30" - 36"
Pour footing pads place columns, beams, joists, metal docking
Pour 4000 psi interior floor and finish
Option II
ITEM
I Description
I CITY
Unit
I Cost
Total
2
IRemove floor, Excavate, pour structural steel floor per CTL plan
1 1
LS
I S 33,113.00
1 $ 33,113.00
Estimate 5 33,113.00
Additonal Alternates
ITEM
Description
CITY
Unit
Cost
Total
A
lInside perimeter drain
1
LS
I S 1,167.00
$ 1,167.00
Estimate
i 157, o0
March 26 2012
Jeff Hubbard
President
Vogel Concrete Inc.
ihubbard a.vooelconcrete.com
ID
0
ask Name
Duration
Stan
Finish
I I 1
4.
1,1111,11 111
AZCI� 'j
H.ode.h.n. Shup Re placement
5� �T
�F 1::�:: �WT f
WL6t T F
T '7 5�
a�
_�F a WjT
26 days
Mon 7MI
Mo. W6112
-
2
[3
to
mer -Am'
1 day
Mon 712111
T&l
Removei Funsies i Required Dugh,rork
Remove Glass & Main Door
Disabi, Alarm
Disable Fee Sprinkler Heads
.1 day
1 day,
1 day
1 day
Mon h21121
Mon 7/2J12:
Tier W3112i;
Wed 714112,
M;n-7ii1l_2
Mon 7012
'T 713112
Wed 1AI 2
1
K@ BRM - SWin Wray
+G;;l "uhFl Ing Touch
Ernest -Alarm S "chalet'
Joe -Front Ron,. Fire PI.C.1111n
Demo. Electric
5 do,
Man 7M12,
Fri 716112
d -Bryan Dorian
Rimrkova Caches
eino. -use (hashing st 5
D br�aliiRe studs
5d.ys'
-5 days''
Mon 7012
21
-wr-mn I
jt��12i
Fri 7161f2
------------
Fri 716112
_nCi
+G;;j;jZP-Ai.R A -Mel Wi.d.n
A -Mot Winds.
4 -Mel Wind..
10
11
Rarn.vo Existing Cove Base
5 days;
Man 70121
Fri 71612
A -Mel wind. n
U
COvwoiUlGe.. .,in 112' dS6'
Demo. Data In Uehiy Close, Wall
5 days.
I day
Mon 7012 I
Mon 712112,
Fri ?i6/12
Man 7j,2112
A -Mel Windiin
IT I H&H Oat
13
-74
Demo. Concrete I Ex,a,,.10 Soil i Insist Drain Tfl. 7 days
Man 719/121
-T..-7117112
Vogel Concrete
15
Install sto ctiT.j Floor
i day.'
Wed 7118112!
Fit ir�7112
.1 Concrete 1
16
Francs Visits
....Mon
fiWiQ!
_71
Mari 361i2
4K Painting & Drywall
17
Rough Elouincalu Ortiz
Tuo 7f31112
t
BRM - Bryan Garrett
Set-up Alarm
I day
Mon 7/30112:
Wei alvi2
Mon 7130112
4K Painting & D"at!
Ernest - �Amr, specialist.
19
20
Set-up Fire Sprinkle, Floods
I day
Mon 71301121
Mon 7130112
Joe - Front Range File Protection
RN -Mel Wimlim
T2
m.1.11 Cutting Tie
5 days
Man W30112'
Fit &XI 2
RM - Mel WInden
23
New Cove Base
Set Furnace I Duc�wk
Trim Eiccuicol
-_Ite�
ys'
2 day.,
day
MIL1112;
Thu 8012,
Fit M/12
FrBIN12
Fn Br�12
Fri BIX12
RM - Mel Wirictin
RM-Bi... Wray
24
25
•G;4
RM - Bryan Garrett
Sat 6'a' s i Main uc�
Begin Us. of Room--_—'
2 days
I day,
F1 u 80121
Mon 81611 - 2:
Fri WW12
W
thing Touch
:i
Horticulture Building
Project: Htofi..Itu'. Sles,
Task
Milestone
External Tasks
Oat.. T,x, 6/1Z12
Spin
..... Summary
glosessesessessessessigi
External Milestone
Frog,...
Protect Summary
(;=
Deadline
Page 1
A: TYPICAL SECTION
FOUNDATION PLAN
General Notes:
�u �.awYy m�i�r�ws�—w pm.,�imry
I..mnt .r ..nu yY.w rpwu..�. yv
u ..uol nr rcw u.vw.w.w u� Prwu.� ru we. eu.w WF
.w ru, rvnmuw.P sv. •mm rypywugve u9 �1�
af+oi
...uw r.w .er.wpw mlu u•.va�• .ypy
r.n w.�. u.s ynw,vwryry..v. v
SH.r4n
nvyo.uw. w.+ww.