Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7366 HARMONY ROAD MAINTENANCE PROJECT - COLLEGE AVE TO TIMBERLINE RD (3)of orCitYt Cottons Engineering Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970,221.6378 - lax Change Order Form PROJECT TITLE: Harmony Rd. Maintenance Project (College/Timberline) PROJECT NUMBER: 902310 (Bid #7366) CONTRACTOR: Martin Marietta Materials (PO #9122742) CHANGE ORDER NUMBER: 2 n preparing change orders show In order as separate numbered paragrap s e o owing: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: (Engineer) $ 57,928.50 2.83 % 3.40% $2,047,316.21 $11,738.10 $0.00 $57,928.50 $2,116,982.81 DATE: (O , ze-/ Z' DATE: 6 -,� f - 1A //�� (Projee�ct.. Manager) ( 1 l: APPROVED BY: V1AA/ll.t-C� W.,mr DATE: 7- z . 12 (Department Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File City of 11 F„ t Collins HARMONY ROAD MAINTENANCE PROJECT (College to Timberline) Change Order #2 Justification City of Fort Collins - Capital Projects By: Tim Kemp Date: 06/26112 REVISED slla`cR1 kt s'.�?&�.P,u tr� ° .e 7a.�o- �°4� ,;? ,y� 9 '.. �. ° ✓'�;�are,3ii�i. {r?` c`'d.,.i[�.Fx �`ayT' P e. J a«�ni`yh ©LL48S �"' `� t FiS��Q�46. -. • . Change Order #2 Will be paid with Pay Estimate #2 CONTRACTS Initial Contract Amount $2,047,316.21 Change Order#1 $11,738.10 Change Order #2 $57,928.50 Total Adjusted Contract Amount $2,116,982.81 S:\Engineering\ProjectsiCapital Projects\Harmony_Timberline to BoardwalklConstruction\Pay App\Harmony Road Pay App.xls tbk s . r Alpha Milling Company 7100 North Broadway, Unit #1-BPH o Denver, CO 80221 Phone (303) 428-2899 Fax (303) 428-2347 To: Martin Marietta Ft Collins . From: Scott Young Attn: Kelley Steele Date: 6/1/2012 Fax: 970-407-3900 Number of Pages: One (1) Quote: Harmony Road Widening S. College to Timberline Road W 202-11 Removal of Asphalt Mat (Planing) (0-4" Depth) Approximately 21,050 S.Y. @ $1.15 Per S.Y. $24,207.50 t 202-12 Removal of Asphalt Mat (Planing) Additional Inch Thinkness - Approximately 4,000 S.Y.-Inch @ $0.38 Per S.Y.-Inch $1,520.00 o s 202-13 Removal of Asphalt Mat (Planing) (Taper 0-2" Depth)(6' Wide) t�3. Approximately 7,400 S.Y. @ $0.99 Per S.Y. $7,326.00 Additional Removal of Asphalt Mat (Mill Patching) (4" Depth) Approximately 21,455 S.Y. @ $1.59 Per S.Y. $34,113.45 Mobilizations @ $1,600.00 Per Each (Or $500.00 Per Each within project) 4 2,I S�i g SQ e Price Includes: Rotomilling Equipmentli-abor, Detailing, Water Price Excludes: Haul of Material Brooming/Cleanup (Add $0.32 Per S.Y.) Rail Road Insurance / Permits Bond (Add 1.9%- $100.00 Min.) Pricing also excludes traffic control, asphalt removal within one Foot of vertical surfaceslobstructlons,temporary asphall/paper ramps, surveying, temporary striping, potholing, or any other services not explicitly described in the above quotation We are an Equal Opportunity Employer