Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9123603WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND GTRI DATED: 6/14/2012 Work Order Number: QUO-49131-DPBF4D-1 Purchase Order Number: Project Title: CiscoWorks Upgrade Commencement Date: 6/14/2012 Completion Date: 12/31/2012 Maximum Fee: (time and reimbursable direct costs): $36,372.45 Project Description: CiscoWorks product upgrade Scope of Services:: Minimum discount of 45% on purchase order < $100K list price. Minimum discount of 48% on purchase order = > $100 K list price. Each site specific project requires a work order authorized by the project manager and Purchasing agent for release of funds. Invoices to reflect specific work order number and PO number. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Work Order Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Work Order Services Agreement and this work order (including the attached forms) the Work Order Services Agreement shall control. The attached forms QUO-49131-DPBF4D-1 consisting of 1 page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service Provider : By: Date: Submitted By: Bob Singleton Network Administration Manager (Project Manager) Date: 6/14/2012 Approved by: Paul Folger IT Infrastructure Director Date: 6/14/2012 Approved by: Director of Purchasing & Risk Management (if over $60,000.) Date: �?GTRO. ri� a-zill GLOBAL TECHNOLOGY RE501JRCES INC. 990 S. Broadway STE 400 Account Executive: Inside Account Manager: Denver, CO 80209 Malt Lederle Ryan Bursey Phone: 303-455-B800 303468-3618 720-746-6264 Fax: 303-455-8808 1 MLederle@GTRi.corn rbursey@GTRI.wm www.GTRI.corn I Quotation Prepared For: Quote #: QUO-49131-DPBF4D-1 Bob Singleton City of Fort Collins Date: 5/2212012 (970) 221-6789 MIS NO"tea:"x. bsingleton@fcgov.com 215 N. Mason, 3rd Floor Fort Collins, CO 80524-4408 r Line# OTY :Item'Number Item -Description Li4frica '?Unit Price Total, LMS Upgrade (300 Network De vices) V I I R-PI-1.1-UP.K9 Cisco Prime Infrastructure 1.1 - $0.00 SO.00 $0.00 1 Mai Upg from LMS 2.x/3.x 2 1 CON-SAU- SW APP SUPP + UPGR NULL S0.00 $0.00 $0.00 Pit ILMSU SKU-No line item services included 3 1 R-Pi1.1-300-U Prime Infrastructure 1.1 Software S20,225.00 $11,123.75 $11,123+75 300 Device MLU119_Llc_ 4 1 CON-SAU.Pll 1300 SW APP SUPP + UPGR LMS 4.x $4,939.00 $4,035.16 $4,035+16 1 - to PI 1.1 Minor Up 300 Device 5 1 L-PILMS42.300.0 Prime Infrastructure LMS 4.2 - $0.00 S0.00 $0.00 LMS Add -on (300 Netvioi�k Devides) 8 1 R-PI4.1-K9 Cisco Prime Infrastructure 1.1 S0.00 S0.001 $0+00 9 1 CON-SAU-PII,1K9B SW APP SUPP + UPGR NULL S0+00 SO.001 SO.00 SKU-No line item services I included 10 3 L-PI-1.1-100-ADD Prime Infrastructure 1.1 - 100 S8,995.00 S4,947.251 $14,841.75 Device Add -On Lic 11 3 CON-SAU-Pil I IOOA SW APP SUPP + UPGR PI 1.1 - S1199.00 SI.469.781 S4 409 34 I 1 100 Device Add -On Lic 13 3 1 -100-A Prime Infrastructure NCS 1.1 - S0.00 $0.00 $0.00 1 jL-PINCSI 100 Device Add -On Lic 14 3 1-100-A Prime Infrastructure NCS WAN $0.00 $0.00 $0.00 1 jL.PINCSVVI 1.1 - 100 Device Add -On Lie LMS,Upgrade (60 WCS Licenses)..,,p, Ae, 15 1 JR-WCS-PI 11 -M-K9 WCS 7.0 to Cisco Prime $1,995.00 $1,097.251 $1,097.25 Infrastructure 1.1 Migration 1 16 1 CON-SAU- SW APP SUPP - UPGR NULL $0.001 S0.001 $0.00 PIIIWCSM SKU-No line item services induced 17 1 R-W-Pll 1-50-M-K9 WCS to Prime Infrastructure 1.1 S0.001 $0.001 SO.00 Migration 50 Device 18 1 CON-SAU-PI1150 SW APP SUPP - UPGR PI 1.1 S1.059.001 S865.201 S865.201 I jL-PINCSI 1-50-M Prime Infrastructure NCS 1.1 - 50 $0.00 $0.001 SO.Oc Device Upgrade Lic I IL-PtNCSWI1-50-M Prime Infrastructure NCS VAN $0.00 SO.001 $0.0c 1.1 - 50 Device U rade Lic Subtotal 1 $36,372.45 Shipping Total S36,372.45 Page 1 of 2 Quote p: QUO-49131-DPBF4D-1 Date: 5/222012 Net 30 Terms with approved credit. Quote is for budgetary purposes only and does not include possible sales taxes and freight charges. A 2 % fee may be applied for credit card purchases. All returns must be pre -approved by GTRI and in original packaging, otherwise subject to a 20% restock fee if opened, used or in used condition. Quote is valid for 60 days. Return policies available at WWW.GTRI.COM Page 2 of 2