HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9123438EXHIBIT 'A'
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
ANC
DATED:
Work Order Number: IJ I �� —
Purchase Ord
Project Title:
Commencement Date: —'-) -6I
Completion Date: _ _�J_ Z —/ Z-
Maximum Fee: (time and rjimbursablc direct costs):
6ertiue Provider agrees to perform the services
identified above and on die attached forms in
accorda►ice midi the terms and conditions contained
herein and in the Senzces Agreement
between the prunes. In the event of a conflict between
or ambiguity u► the terms of the Services Agreement
and this work order (including the attached forms) fie
Services Agreement shall control.
Service Pro-Nider
By:
Date: S —3b --/ 2-
CC: Puchasitig
The attached forms consisting of _ U pages are
hereby accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
City of Fort Collins
By:
Date:
Director of Purchasing and Risk Matngemeut
Over ,$30,000
412001
Lesondak Construction llc
Dba Homeland Fence
6204 Jackpine Dr
Bellvue, CO 80512
(970)218-0433
I Name/Address I
Parks and Recreation
413 S. Bryan st
Ft Collins, CO 80521
Estimate
Date
Estimate #
5/18/2012
111
Project
Description
Qty
Rate
Total
Ft Collins contract 415 8' 9gauge fabric installed- field 1 dugout
40
8.76
350.40
3rd base side
Labor - supervisor/laborer contract #44 and 45- cut to fit back of
2
35.00
70.00
dugout and fasten anchors in concrete
misc part- anchors and hardware for dugout
1
25.00
25.00
Ft Collins contract #18 5' 9 gauge fabric installed- field 1 3rd base
30
4.94
148.20
side
Ft Collins contract #18 5' 9 gauge fabric installed- field 1 back
30
4.94
148.20
corner
Ft Collins contract #15 8' 9gauge fabric installed- L ball field light
10
8.76
87.60
Ft Collins contract #15 8' 9gauge fabric installed- field 1 dugout 1st
40
8.76
350.40
base side
Ft Collins contract #18 5' 9 gauge fabric installed- field 1
120
4.94
592.80
0.00
0.00
Ft Collins contract #18 5' 9 gauge fabric installed- ne corner field 2
40
4.94
197.60
Labor - supervisor/laborer contract 444 and 45- install 90' tenwire
2
35.00
70.00
and tie
90
0.25
22.50
tension wire
0.00
0.00
welding charge without labor- 4 welds on bottom rail dugout- field
1
25.00
25.00
3
Labor - supervisor/laborer contract 444 and 45- labor for weld
1
35.00
35.00
Ft Collins contract # 18 5' 9 gauge fabric installed- field 3 3rd base
50
4.94
247.00
side
Ft Collins contract #15 8' 9gauge fabric installed- field 3 L light
20
8.76
175.20
Ft Collins contract #18 5' 9 gauge fabric installed- field 3 300' sign
10
4.94
49.40
Ft Collins contract #18 5' 9 gauge fabric installed- L of scoreboard
40
4.94
197.60
Ft Collins contract # 18 5' 9 gauge fabric installed- field 3 1st base
20
4.94
98.80
side
hardware and anchors for backstop
1
20.00
20.00
Ft Collins contract # 15 8' 9gauge fabric installed- field 4 dugout-
10
8.76
87.60
cut to fit
Ft Collins contract #14 10' 6gauge fabric- field 4 backstop
30
16.17
485.10
All pricing is good for 30 days - materials need to be purchased within 7 days to maintain
Total
1
pricing.
Page 1
11
Lesondak Construction llc
Dba Homeland Fence
6204 Jackpine Dr
Bellvue, CO 80512
(970)218-0433
I Name/Address I
Parks and Recreation
413 S. Bryan st
Ft Collins, CO 80521
Estimate
Date
Estimate #
5/18/2012
111
Project
Description
Qty
Rate
Total
Ft Collins contract # 18 5' 9 gauge fabric installed- field 4 3rd base
10
4.94
49.40
side
Ft Collins contract # 15 8' 9gauge fabric installed- field 4 outfield
50
8.76
438.00
by opening
Ft Collins contract # 18 5' 9 gauge fabric installed- field 4 outfield
50
4.94
247.00
corner
Labor - supervisor/laborer contract #44 and 45- tie lower section of
1
35.00
35.00
outfield
aluminum tie
75
0.15
11.25
Labor - supervisor/laborer contract #44 and 45- repair and tie 10'
1
35.00
35.00
gate
Labor - supervisor/laborer contract #44 and 45- additional labor
8
35.00
280.00
required for short section pricing
lower rubber backstop material installed price
280
11.00
3,080.00
Old fence haul off item #20 of contract
680
0.50
340.00
All pricing is good for 30 days - materials need to be purchased within 7 days to maintain
pricing.
Total $7,999.05