Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9123438EXHIBIT 'A' WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS ANC DATED: Work Order Number: IJ I �� — Purchase Ord Project Title: Commencement Date: —'-) -6I Completion Date: _ _�J_ Z —/ Z- Maximum Fee: (time and rjimbursablc direct costs): 6ertiue Provider agrees to perform the services identified above and on die attached forms in accorda►ice midi the terms and conditions contained herein and in the Senzces Agreement between the prunes. In the event of a conflict between or ambiguity u► the terms of the Services Agreement and this work order (including the attached forms) fie Services Agreement shall control. Service Pro-Nider By: Date: S —3b --/ 2- CC: Puchasitig The attached forms consisting of _ U pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins By: Date: Director of Purchasing and Risk Matngemeut Over ,$30,000 412001 Lesondak Construction llc Dba Homeland Fence 6204 Jackpine Dr Bellvue, CO 80512 (970)218-0433 I Name/Address I Parks and Recreation 413 S. Bryan st Ft Collins, CO 80521 Estimate Date Estimate # 5/18/2012 111 Project Description Qty Rate Total Ft Collins contract 415 8' 9gauge fabric installed- field 1 dugout 40 8.76 350.40 3rd base side Labor - supervisor/laborer contract #44 and 45- cut to fit back of 2 35.00 70.00 dugout and fasten anchors in concrete misc part- anchors and hardware for dugout 1 25.00 25.00 Ft Collins contract #18 5' 9 gauge fabric installed- field 1 3rd base 30 4.94 148.20 side Ft Collins contract #18 5' 9 gauge fabric installed- field 1 back 30 4.94 148.20 corner Ft Collins contract #15 8' 9gauge fabric installed- L ball field light 10 8.76 87.60 Ft Collins contract #15 8' 9gauge fabric installed- field 1 dugout 1st 40 8.76 350.40 base side Ft Collins contract #18 5' 9 gauge fabric installed- field 1 120 4.94 592.80 0.00 0.00 Ft Collins contract #18 5' 9 gauge fabric installed- ne corner field 2 40 4.94 197.60 Labor - supervisor/laborer contract 444 and 45- install 90' tenwire 2 35.00 70.00 and tie 90 0.25 22.50 tension wire 0.00 0.00 welding charge without labor- 4 welds on bottom rail dugout- field 1 25.00 25.00 3 Labor - supervisor/laborer contract 444 and 45- labor for weld 1 35.00 35.00 Ft Collins contract # 18 5' 9 gauge fabric installed- field 3 3rd base 50 4.94 247.00 side Ft Collins contract #15 8' 9gauge fabric installed- field 3 L light 20 8.76 175.20 Ft Collins contract #18 5' 9 gauge fabric installed- field 3 300' sign 10 4.94 49.40 Ft Collins contract #18 5' 9 gauge fabric installed- L of scoreboard 40 4.94 197.60 Ft Collins contract # 18 5' 9 gauge fabric installed- field 3 1st base 20 4.94 98.80 side hardware and anchors for backstop 1 20.00 20.00 Ft Collins contract # 15 8' 9gauge fabric installed- field 4 dugout- 10 8.76 87.60 cut to fit Ft Collins contract #14 10' 6gauge fabric- field 4 backstop 30 16.17 485.10 All pricing is good for 30 days - materials need to be purchased within 7 days to maintain Total 1 pricing. Page 1 11 Lesondak Construction llc Dba Homeland Fence 6204 Jackpine Dr Bellvue, CO 80512 (970)218-0433 I Name/Address I Parks and Recreation 413 S. Bryan st Ft Collins, CO 80521 Estimate Date Estimate # 5/18/2012 111 Project Description Qty Rate Total Ft Collins contract # 18 5' 9 gauge fabric installed- field 4 3rd base 10 4.94 49.40 side Ft Collins contract # 15 8' 9gauge fabric installed- field 4 outfield 50 8.76 438.00 by opening Ft Collins contract # 18 5' 9 gauge fabric installed- field 4 outfield 50 4.94 247.00 corner Labor - supervisor/laborer contract #44 and 45- tie lower section of 1 35.00 35.00 outfield aluminum tie 75 0.15 11.25 Labor - supervisor/laborer contract #44 and 45- repair and tie 10' 1 35.00 35.00 gate Labor - supervisor/laborer contract #44 and 45- additional labor 8 35.00 280.00 required for short section pricing lower rubber backstop material installed price 280 11.00 3,080.00 Old fence haul off item #20 of contract 680 0.50 340.00 All pricing is good for 30 days - materials need to be purchased within 7 days to maintain pricing. Total $7,999.05 Page 2