ADDENDUM No. 3
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 7184: Discovery Museum Exhibit Fabrication
OPENING DATE: 3:00 P.M. (Our Clock) February 22, 2011
To all prospective bidders under the specifications and contract documents described
above, the following additions are hereby made.
Questions and Answers:
Please review the questions in black and the answers are in green.
Area Drawing/Component Questions
General
Proposal
Will a full proposal be required as per RFP 7184 Step 2, pages 12-13? No RFP was issued
with this bid package. Yes, you will need to follow the process in Chapter 4, Section 3, Step
II of RFP 7184 for completion of the proposal.
General
GMP
Is a line itemed cost estimate all that is required at this time (per the supplied bid form), or a
GMP? If a GMP is required, how would you like it broken down with regards to G&A etc? A
GMP is required, per Paragraph 3.2.h of the RFP.
General
Bonding
Is a bid Bond, or security, still a requirement? Yes.
General
Building
What is the current building construction status? Is there a construction site webcam and/or
are current photographs available? We are installing the structural steel. Attached are some
recent photographs.
General
Building
Is there still an opportunity to provide a blocking plan for installation of plywood blocking by
the GC? Yes, but we already have plywood behind the sheetrock on all of the gallery walls.
General
Building
What are typical working days and hours when the building site will be available/open for
installation by Fabricator? Typical is 8:00 A.M. - 5:00 P.M., Monday through Friday, but you
can request alternate hours to facilitate installation.
General
Building
Will the exhibit galleries spaces be provided in a broom-clean state and principally free of
other trades? Yes, the gallery will be better than broom clean and there should be no other
trades in there when exhibit installation takes place.
General
Building
What is physical access path to exhibition spaces from street to gallery? Please describe all
changes in elevation and doorway/hallway dimensions. We are currently adding a 9' wide X
12' high overhead door on the North side of the Traveling Gallery and a portion of the wall
between the Traveling Gallery and the Main Gallery will be left out for the exhibit installation.
General
Building
Is parking available on the job site? Yes.
General
Building
Is this project applying for LEED certification at any level? And, will any LEED
documentation be required by the Fabricator? Yes, we are striving to attain at least LEED
Gold Certification and possibly LEED Platinum. We are currently investigating how the
Fabricator's information will be able to be included in our submission, but we do expect the
Fabricator to follow the sustainability practices outlined in the RFP and keep appropriate
records.
General
Building
Will any Fabricator drawings be required to be stamped/signed/sealed by engineers in any
discipline? The Fabricator may need to provide structural, mechanical or electrical drawings
stamped/signed/sealed, dependent upon the exhibit and its compliance with Codes and
Regulations requirements.
General
Electrical
At what location is the "point of service" or "distribution points" for exhibits where the GC will
be providing connections for electrical, data, plumbing, HVAC or other utilities integrated into
exhibit components? And what is the standard type of connection or distribution point where
the Fabricator will need to connect? The "point of service" or distribution points" for the
exhibits will be as described in the architectural drawings provided, as well as the lighting
drawings that are part of the exhibit design drawings. There is no standard type of
connection or distribution point where the Fabricator will need to connect; it will vary
dependent upon the service needed. Once the Exhibit Fabricator is selected, there will be
further dialogue on these points.
General
Electrical
Are electrical connections provide by Fabricator expected to be terminated by hard-wired
connections or cord plugs in receptacles? If cord plugs, are there limitations (max. or min.)
based on local code or other project requirement regarding the length of cord? There will be
instances where the connection will be hard-wired and others will be plugs; this is mostly
dependent upon the exhibit. As indicated above, there will be further dialogue on this with
the selected Fabricator.
General
Lighting
For lighting that is integrated into exhibits or exhibit structures where and what is the point of
connection with the GC scope? The GC will provide the points of connection as indicated on
the exhibit lighting drawings.
General
Refurb
Because we will not be able to examine exhibits that require refurbishing, will the Owner be
suggesting a refurbishment "allowance" per exhibit or an overall allowance for the entire
project? We can provide photos and video documentation, in addition to the exhibit
drawings, that should allow you to provide pricing for these items.
General
Artifacts
For artifacts mounting that may be included in Fabricator scope how and when will access to
the artifacts be allowed? The Owner can make the artifacts available, as needed by the
Fabricator. The goal is to not ship the artifacts.
General
Artifacts
Because artifacts may change after bid, will the Owner suggest a mounting "allowance" per
exhibit or an overall allowance for the entire project, or would you prefer the Fabricator
create an overall project allowance? We would like to see a mounting option price per
exhibit.
General
AV
General
AV
Because the Content Management Player (CMP) system has not been specified/designated,
Fabricator will identify an allowance for coordination and integration. Is this acceptable?
The CMP system has been specified and is being tested by the Owner. The Owner will
purchase. It is produced by Arrow Rez Software in collaboration with Four Winds, both local
companies.
General
AV
Do all Owner-provided monitors and touchscreens require a housing of some sort that is to
be provided by the Fabricator? This is detailed on a case-by-case basis in the exhibit
drawings.
General
Buy-Outs
Is it required that components noted as Fabricator-purchased buyouts from specialty
fabricators be purchased from the specific specialty fabricator, or can the Fabricator build its
own unit if it is considered of equal or of higher quality? In general, this has already been
noted on the drawings or in the exhibit descriptions where that is an acceptable alternative.
If fabrication is a less expensive alternative of equal or better quality, we would like that to be
clearly noted.
General
Buy-Outs
Has the owner or designer been in contact with the suppliers for the buy-out components?
Can a contact list be supplied? We assume all bidders will be supplied with the same pricing
for all buy-outs. In thecase of Fabricator scope buyout exhibits, the Fabricator is to supply
pricing.
General
Buy-Outs
Is it safe to assume that specialty fabricators of any buyout components that the Owner
requires to be purchased by the Fabricator will provide all hardware required for mounting
and installing? The drawings should clearly detail whether the Fabricator will need to provide
additional mounting beyond what is provided by another party. If not, please provide specific
instances.
General
Buy-Outs
Can a list of all buy-outs and who is responsible for purchasing them be provided? In some
cases it is unclear based on the Media Treatments and Exhbit Descriptions. Please provide
specific examples of where this is unclear.
General
OFE
For Owner-provided items that are supposed to be integrated into Fabricator-provided new
construction who will be paying for shipping of these items from Owner to the Fabricator?
Wherever practical, we want to minimize shipment. If shipment is ablolutely necessary, plan
on the Owner shipping these items.
General
Safety
Does the Owner or the Designer have any specifications/requirements/guidelines related to
tethered items, e.g., length of tether, type of tether, tensile strength, etc.? Performance
requirements for these items should be indicated on the drawings. If not, we will need
specific examples.
General
Safety
For any mechanical interactive elements, how important is it to the design whether we
incorporate the drawn mechanisms as opposed to using our own systems? As one example,
springs may create pinch points or be weak "links" in a mechanical design. Is it important to
the design appearance to retain a spring or can another type of mechanism that achieves the
same result be substituted? We are open to the Fabricator providing alternate components,
especially if they are safer, but they must provide the long term performance anticipated for
the designed element.
General
Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777
with any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
Safety
A number of the interactive elements, as currently designed, have numerous potential pinch
points yet the Fabricator is charged with eliminating potential pinch points. How will the
Owner and Designer determine which pinch points are acceptable and which are not? We
recommend that you propose the methods of eliminating these pinch points and we will
evaluate on a case-by-case basis.
General
Reclaimed Wood
Are there any guidelines/restrictions with regard to condition, species, source, etc., pertaining
to any "reclaimed" wood used throughout the exhibits? Other that in the Natural Areas
Program Area (Zone 11), where reclaimed wood is designated as "Beetle Kill Pine", we are
looking for the best sustainable solution to match the design aesthetic.
General
Kickbases
Generally, are the kicks on platform bases removable to access the levelers? If yes, does
the Owner have a preference for how these kicks are removable? Our preference is a
secure mechanical attachment such as a cam lock.
For HP-donated hardware provided by Owner when will Fabricator receive delivery of all
hardware? Fabricator will require one of each type/model very early in project in order to
complete shop drawings. Is there any problem/issue with this early delivery requirement?
The Owner will expedite hardware acquisition for each form factor.
General
AV
For all media, who is responsible for software integration? Is there a difference for
integration responsibility among Owner-provided software, third-party vendor software and
Fabricator-provided software? Is there a difference in these 3 scenarios depending on
whether Fabricator is only assisting with installation coordination? The Owner is responsible
for owner provided or owner scope items. The Fabricator is only responsible for physical
installation coordination and making sure data and electrical wiring is functional for these
Owner items.
General
AV
For all media development by Owner, will Designer and Owner designate all required
hardware, and should Fabricator include any allowance for undesignated elements? In order
to answer this fully, we will need you to give us an example.