Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7287 ADDITION & RENOVATION TO MAIN BRANCH LIBRARY (5)City of Fort Collins Operation Services PROJECT TITLE: PROJECT NUMBER: CONTRACTOR: CHANGE ORDER NUMBER: Change Order Form Poudre Library PO# 9116852 Heath Construction �CChange Order # 14 OPERATION SERVICES Project Management, Planning & Design 300 LaPorte Avenue P.O. Box 580 Fort Collins, CO 80522-0580 970.221.6610 970.221.6534 - fax In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change 2. Description of change 3. Change in contract cost 4. Change in contract time. 1&2 See attached sheet for detail. 11 Changes compensation from fixed fee to time and direct cost basis with a not to exceed. The contract cost will not be effected. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) 0.28 % 11.30 % $2,620,200.00 $276,065.81 $12,772.16 $7,371.72 $2,916,409.69 ACCEPTED BY:Y--. DATE: Zeathi nstruction Proje epresentative REVIEWED BY: "�Y1 <� DATEw 511 /�L Library District (CFC Facilities) Project Mgr APPROVED BY: (- �„ - !� DATE: U �� PRPLD Library Director cc: Contractor Purchasing Project File Poudrs River U Wary District Open Name List Date: May 30, 2012 90 lAdMonal work as mrectW by UWwy DISWct I I I I Appmed Addiflonal work rot on contract documents 90a - Sturtaon Electric 1 LS 7.475.76 Opwl tsm 00 TOW 7,826.31 18 72 ''�••42.'-''& a1 PR-23 roved Art Well Provide Art Wall 2nd rear location Owrier decided a Mt move forwardwf1 the 91 a - gvision Ten S ra I LS 385,00 of the work 91E-Heath 1 LS 0.00 Ole - Not Used 1 LS 0.00 91d-Not used 1 LS 0.00 91e-Mulmum 1 LS 118.00 C— n a 257,00 2A 79 114 _P 92 RFl - 094 Aporoved Extt Stan Relocation Reecam extt sign porflre muthodItf dmedw 92a - sturgeort 1 LS 810.58 _ Open ftm 92 Total 647.21 2A 80 12.': W RFl - 090 roved Inflll a Material O dock area Ird11l of material O dock ant Inside waft We - Camm mial Glass 1 LS 232.81 Option 93- P1loenlx Mason 1 LS Open 246.78 2A 81 94 PR - 24 Appmed Cmdt for AIL 9 rat Installed Doletion of AN. 9 2nd floor non yet installed m o 4,312.18 2A 82 :a �.AT,, AddhionN Areas of 1B BM • Bklm Coat roved Stn and Skim Coal Exterior walls 95a-Phase2 1 LS 1184.00pan P 1,255.04 2A 83 ,�--12 ... ASI. 010 roved ' Delete Slnka In Multipurpose moms Deletion of sinks 8 oiping In milipurposs moms 98e - Und's PImum 1 LS (4,778. 4,778.00 2A 84,'~13 97 CmdN for Storm Drain roved lCmdt for Stem Drain 97a - Martin 8 Sore t LS 1,845.00 Open Mean WY Total 1845.00 2A 95 f —13 I 96 PR- B-SWrtl Fence roved Stain lance as dnaed Path review 984 - Madmum Pelml 1 LS 128.00 pen 133.58 2A 88 1 13 1 W PR-26 road Additional Lanscaping 9%-Nero La 1 LS 3227.00 99E - Heath Constriction 1 LS 579.76 Open ftm 99 Total 4,036.17 2A 87 �.13100 PR-18 Closed 117TV8 Caseork Cho s 100a -Toam Unx 1 LS 0.00 27 makes tgs Item Mute 100E - Stunport t LS 0.00 100c-Alen 1 LS 0.00 Pon ftm 100 Total 0.00 2A SB 101 RFl- 103 roved Addlaonei Wag Prolectlan 101 a - ea Connactl 1 LS i00 5.00 , ✓ , 1,590.00 2A 89 _L 13 , ,1 1 22 RFl- 116 1 Approved I I Meda 112 - TopouAEAsfflngHafts 102a- Pheaa 2 1 LS 1.061.00 102E - Phase 2 Vdlattary Craw . I LS 526.00 SM.50 I 2A 1 00 (1 13 It 103 PR - 25 Apprtwod I I IFxledor Window Slu Opdors Option A 103a-CS killed 1 LS 1.000.00 103E-Health 1 LS 5%1,00 Option B 103na- CS Metal I LS p1 1030E - heath 1 LS IesY �C 3,751.34 2A vw 1 13-- 104 RFl 92 A RFl 100 Lock a Rehm Air Path 8 Sub Rosportses 1048-PVA 1 LS I 2403.00 f 04E- Heath 1 LS 1 144.94 r• ,1,�— r 2,700.82 i 2A 1 92 t —: 13— I 106 RR 102 & RR 108 Respormis OueOau 1 11 FApproved I I Cwdkft wags, Was end 106a-PVA 1 LS 1031.00 Ow lawn IN TOW 1,0MS6 2A W Y r..13J i 106 RR - 1 W Removo e P 6 vere In Phw 2m lot flow tOG - lbtls I LS 511.00 _ L —. I 577.66 2A W It 1--13._. No Text