HomeMy WebLinkAboutCHANGE ORDER - BID - 7287 ADDITION & RENOVATION TO MAIN BRANCH LIBRARY (5)City of
Fort Collins
Operation
Services
PROJECT TITLE:
PROJECT NUMBER:
CONTRACTOR:
CHANGE ORDER NUMBER:
Change Order Form
Poudre Library
PO# 9116852
Heath Construction
�CChange Order # 14
OPERATION SERVICES
Project Management, Planning & Design
300 LaPorte Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
970.221.6610
970.221.6534 - fax
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1&2 See attached sheet for detail. 11
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
The contract cost will not be effected.
There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
0.28 %
11.30 %
$2,620,200.00
$276,065.81
$12,772.16
$7,371.72
$2,916,409.69
ACCEPTED BY:Y--. DATE:
Zeathi
nstruction Proje epresentative
REVIEWED BY: "�Y1 <� DATEw 511 /�L
Library District (CFC Facilities) Project Mgr
APPROVED BY: (- �„ - !� DATE: U ��
PRPLD Library Director
cc: Contractor
Purchasing
Project File
Poudrs River U Wary District Open Name List Date: May 30, 2012
90
lAdMonal work as mrectW by UWwy DISWct
I
I
I
I
Appmed
Addiflonal work rot on contract documents
90a - Sturtaon Electric
1
LS
7.475.76
Opwl tsm 00 TOW
7,826.31
18
72
''�••42.'-''&
a1
PR-23
roved
Art Well
Provide Art Wall 2nd rear location
Owrier decided a Mt move forwardwf1 the
91 a - gvision Ten S ra
I
LS
385,00
of the work
91E-Heath
1
LS
0.00
Ole - Not Used
1
LS
0.00
91d-Not used
1
LS
0.00
91e-Mulmum
1
LS
118.00
C—
n a
257,00
2A
79
114
_P
92
RFl - 094
Aporoved
Extt Stan Relocation
Reecam extt sign porflre muthodItf dmedw
92a - sturgeort
1
LS
810.58
_
Open ftm 92 Total
647.21
2A
80
12.':
W
RFl - 090
roved
Inflll a Material O dock area
Ird11l of material O dock ant Inside waft
We - Camm mial Glass
1
LS
232.81
Option
93- P1loenlx Mason
1
LS
Open
246.78
2A
81
94
PR - 24
Appmed
Cmdt for AIL 9 rat Installed
Doletion of AN. 9 2nd floor non yet installed
m o
4,312.18
2A
82 :a
�.AT,,
AddhionN Areas of 1B BM • Bklm Coat
roved
Stn and Skim Coal Exterior walls
95a-Phase2
1
LS
1184.00pan
P
1,255.04
2A
83
,�--12 ...
ASI. 010
roved
'
Delete Slnka In Multipurpose moms
Deletion of sinks 8 oiping In milipurposs moms
98e - Und's PImum
1
LS
(4,778.
4,778.00
2A
84,'~13
97
CmdN for Storm Drain
roved
lCmdt for Stem Drain
97a - Martin 8 Sore
t
LS
1,845.00
Open Mean WY Total
1845.00
2A
95 f
—13
I
96
PR- B-SWrtl Fence
roved
Stain lance as dnaed Path review
984 - Madmum Pelml
1
LS
128.00
pen
133.58
2A
88 1
13
1
W
PR-26
road
Additional Lanscaping
9%-Nero La
1
LS
3227.00
99E - Heath Constriction
1
LS
579.76
Open ftm 99 Total
4,036.17
2A
87
�.13100
PR-18
Closed
117TV8 Caseork Cho s
100a -Toam Unx
1
LS
0.00
27 makes tgs Item Mute
100E - Stunport
t
LS
0.00
100c-Alen
1
LS
0.00
Pon ftm 100 Total
0.00
2A
SB
101
RFl- 103
roved
Addlaonei Wag Prolectlan
101 a - ea Connactl
1
LS
i00 5.00
,
✓
,
1,590.00
2A
89
_L 13 ,
,1
1 22
RFl- 116
1
Approved I
I
Meda 112 - TopouAEAsfflngHafts
102a- Pheaa 2
1
LS
1.061.00
102E - Phase 2 Vdlattary Craw .
I
LS
526.00
SM.50 I
2A 1
00 (1
13 It
103
PR - 25
Apprtwod I
I
IFxledor
Window Slu Opdors
Option A
103a-CS killed
1
LS
1.000.00
103E-Health
1
LS
5%1,00
Option B
103na-
CS Metal
I
LS
p1
1030E
- heath
1
LS IesY
�C
3,751.34
2A
vw
1 13--
104
RFl 92 A RFl 100
Lock
a Rehm Air Path 8 Sub Rosportses
1048-PVA
1
LS I
2403.00
f
04E- Heath
1
LS 1
144.94
r• ,1,�—
r
2,700.82 i
2A 1
92 t
—: 13— I
106
RR 102 & RR 108 Respormis OueOau
1
11
FApproved
I
I
Cwdkft
wags, Was end
106a-PVA
1
LS
1031.00
Ow
lawn IN TOW
1,0MS6
2A
W Y r..13J
i
106
RR - 1 W
Removo
e P 6 vere In Phw 2m lot flow
tOG
- lbtls
I
LS
511.00
_ L
—. I
577.66
2A
W It 1--13._.
No Text