HomeMy WebLinkAboutCHANGE ORDER - BID - 7287 ADDITION & RENOVATION TO MAIN BRANCH LIBRARY (4)• City of
• Fort Collins
Change Order Form
PROJECT TITLE: Poudre Library
PROJECT NUMBER: PO# 9116852
CONTRACTOR: r - Heath Construction
--I --
CHANGE ORDER NUMBER--'-Lchange Order # 13 "
__`—._�
OPERATION SERVICES
Project Management, Planning a Design
300 LaPorte Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
970.221.8610
970.221.8534 •fax
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change 2. Description of change
3. Change in contract cost 4. Change in contract time.
1 &2 See attached sheet for detail.
Changes compensation from fixed fee to time and direct cost basis with a not to exceed.
003 The contract cost will not be effected.
4 There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
$2,620,200.00
$267,629.16
$21,208.81
$8,436.65
0.32%
11.35%
$2,917,474.62
ACCEPTED BY: DATE: D' Z r f Z
H ath Constru on Pro Representative
REVIEWED BY: DATE:" a r 2
Library District (CFC Facilities) Project Mgr /
• APPROVED BY: DATE:
• PRPLD Library Director
oc: Contractor
Purchasing
Project File