Loading...
HomeMy WebLinkAboutRESPONSE - BID - 7376 SKYWAY DRIVE TRANSFORT IMPROVEMENTS - GATEWAY CENTER TO S COLLEGE AVESECTION 00300 BID FORM PROJECT: 7376 Skyway Drive Transfort Improvements — Gateway Center Drive to South College Avenue Place: Date: IX,,, / , )nld In compliance with your Invitation to Bid dated 20 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of _ � n�,t A cQ a •.o�, ($ y0481 in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and ayment Bonds is as follows: 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through a, 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. .. 12. • List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: 16. Bank Reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? es 18. Are you licensed as a General Contractor? ,(/ If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract?�e t If yes, what percent of total contract? /Tl // And to whom? ��c;o,_ Su f%u� ' (✓uoI'ty T /L"-/ 20.' Are any lawsuits pending against you or your firm at this time? AA IF yes, DETAIL 21. What are the limits of your public liability? DETAIL. What company? 22.., What are your company's bonding limitations? A n✓�� 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at /di:GO this day of 2016� If Name of Bidder State of (O�rsrl�iy County of Tw `� being duly sworn deposes and says that he is of L4,1 -2 , and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this P day of�, 20].: (Seal) My commission expires: F? i /a SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: CONTRACTOR Printed Date irGS C(e' -&- Title License Numb r (If licable) (Seal - if Bid is by corporation) Aft t: i A dress6'3.30 So,.tI Cc e— Ale- lf rt e//,• S . Co. 8os-as' Telephone S7o - 4�8Y- 80 f..• Email 0 ct i u wyncp.� .ar.re,. rn � CORPOR", s SEAS446 0 16,c0 Rr�o°•�`�� SKYWAY DRIVE TRANSFORT IMPROVEMENTS City of Fort Collins - Capital Projects Fort Collins Unit Cost Total Cost Ref # Item # Item Description Quantity Unit 1 201-01 Clearing and Grubbing (0.5 Acre) 1 LS $ 3,490.00 $ 3,490.00 2 202-01 Removal of Tree (3 Inch Caliper or Less) 2 EA $ 250.00 $ 500.00 3 202-02 Removal of Sign 3 EA $ 75.00 $ 225.00 4 202-03 Sawcutting (8 Inch Asphalt Mat) 200 LF $ 4.50 $ 900.00 5 202-04 Removal of Asphalt Mat 37 SY $ 15.00 $ 555.00 6 202-05 Sawcutting (8 Inch Concrete) 60 LF $ 4.50 $ 270.00 7 202-06 Removal of Concrete 200 SF $ 2.00 $ 400.00 8 202-07 Removal of Fence 140 LF $ 0.95 $ 133.00 9 203-01 Unclassified Excavation (Complete In Place) 400 CY $ 14.45 $ 5,780.00 10 1 203-02 Borrow 50 CY $ 14.00 $ 700.00 11 1 203-03 Muck Excavation 50 CY $ 28.90 $ 1,445.00 12 203-04 Shouldering (Recycled Asphalt) (Haul and Place) 45 TON $ 17.10 $ 769.50 13 203-05 Subgrade Preparation (Sidewalk) 6,800 SF $ 0.35 $ 2,380.00 14 203-06 Flowable Fill (Utility Backfill) 10 CY $ 74.50 $ 745.00 15 207-01 Topsoil (Imported) 100 CY $ 27.17 $ 2,717.00 16 208-01 Erosion Log (12 Inch) 995 LF $ 2.90 $ 2,885.50 17 210-01 Reset Sign 3 EA $ 70.00 $ 210.00 18 212-01 Soil Conditioning 0,35 ACRE $ 4,470.00 $ 1,564.50 19 213-01 Mulching (Weed Free Hay) 0.35 ACRE $ 2,770.00 $ 969.50 20 216-01 Seeding (Native) 0.35 ACRE $ 4,900.00 $ 1,715.00 21 403-01 Hot Mix Asphalt (Patching) 10 TON $ 167.00 $ 1,670.00 22 412-01 Concrete Pavement (8 Inch) 200 SF $ 7.00 $ 1,400.00 23 506-01 Riprap (9 Inch) 5 CY $ 85.00 $ 425.00 24 607-01 Fence (3 Wire Smooth) 155 LF $ 7.00 $ 1,085.00 25 608-01 Concrete Sidewalk (6 Inch) 6,800 SF $ 4.00 $ 27,200.00 26 608-02 Concrete Curb Ramp w/ Truncated Domes 210 SF $ 9.50 $ 1.995.00 27 609-01 Curb and Gutter (Type 2) (Section II-B) 245 LF $ 19.00 $ 4,655.00 28 613-01 Electrical Conduit (1 Inch) 40 LF $ 4.00 $ 160.00 29 620-01 Sanitary Facility 1 EA $ 270.00 $ 270.00 30 626-01 Mobilization 1 LS $ 2,200.00 $ 2,200.00 31 630-01 Construction Zone Traffic Control 1I LS $ 4,140.00 $ 4,140.00 32 630-02 Construction Zone Traffic Control JCS) 105 HR I $ 32.00 1 $ 3,360.00 33 630-03 Construction Zone Traffic Control (Flagging) 120 HR $ 22.00 $ 2,640.00 34 630-04 Variable Message Board 15 EA / DAY $ 121.00 $ 1,815.00 BID TOTAL: $ 81,369.On Skyway bid tab Vogel 2012AS [bk 1 pi..: SKYWAY DRIVE TRANSFORT IMPROVEMENTS City Of City of Fort Collins - Capital Projects Frt Collins Unit Total. ' #I Item # Item Description. _ quantity. Unit Cost.. ', Cost IN WORDS Eighty One Thousand Three Hundred Sixty Nine Dollars Skyway bid tab Vogel 2012AS Ibk SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned Vogel Concrete, Inc. as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 7376 Skyway Drive Transfort Improvements — Gateway Center Drive to South College Avenue. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of may 1 , 2012, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Vogel Concrete, Inc. Address: 6330 S. College Ave. Fort Collins, CO 80525 ,NC LORPORA)F SURETY Contractors Bonding and Insurance Company 5300 DTC Parkway, Suite 490 (SEAL) Bonding and Insurance Company 1213 V 1213 Valley Street P.O. Box 9271 nu u.ww Seattle, WA 98109-0271 Know All Men by These Presents: POWER OF ATTORNEY Contractors Bonding and Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint: W R Withrow. Tyler Withrow Megan A Brown Bud Withrow jointly or severally in the City of Denver , State of Colorado its true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 1 for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the"Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings,ih the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies, undertakings Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate seal may be.printed by facsimile or other electronic image." uv wt i INL66 writ ml-ul•, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 13th day of March 2012 e... l�gntractors Bonding and Insurance Company ;: State of Washington �y C. Die Vice President SS County of King O - �'' CERTIFICATE On this 13th day of Mach 2012 I, the undersigned officer of Contractors Bonding and Insurance before me, a Notary Public, personally appeared Roy C. Die , who ` Company, a stock corporation of the State of Washington, do hereby being by me duly sworn, acknowledged that he signed the above Power of certify that the attached Power of Attorney is in full force and effect Attorney as the aforesaid officer of the Contractors Bonding and and is irrevocable; and furthermore, that the Resolution of the Insurance Company and acknowledged said instrument to be the voluntary Company as set forth in the Power of Attorney, is now in force. In act and deed of said corporation. testimony whereof, I have hereunto set my hand and the seal f th Joseph B. filer Notary Public o e Contractors Bondeai�ng �an�d Insurance Company this 1 St day of May , LU"I L . Contractors Bonding and Insurance Company Nor.ry Pobl@ Su'. o,w ".gfoa Roy C. Die Vice President JOSEPN S. MULLER L Y COMMISSION EXPIRES March 29, 2012 OS]55]80329f2 A0059511 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: �33C S (�-0�/��� ,�.e L✓� ��� ?d 3. When organized: /W 4. If a corporation, where incorporated:T l n�arc.Yo 5. How many years have you been engaged in the contracting business under your present firm or trade name? x ,/yes 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character //ofsoWork performed by your company: .JioG.w �, re c�ipin..S GEC. 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract?_ If so, where and why? 10. Are you debarred by any government agency? If yes list agency name.